Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Investigation of Conceptua1 Facility Structure on the vibration packing fuel manufacturing system Corresponding to wet fuel recycle plant

Kawamura, Fumio*; Aoi, Masakatsu*; Hoshino, Kuniyoshi*

JNC TJ9420 2003-006, 436 Pages, 2004/02

JNC-TJ9420-2003-006.pdf:3.67MB

The stratagem feasibility studies for aim of commercialization of FBR cycle system have been researched in JNC. In these studies economy, load suppression for environmentality, non-proliferation and et. al. have been evaluated for several kinds of systems. In series of these researches, we had researched the vibration packing fuel manufacturing system of wet fuel recycle plant for FBR's fuel, and investigated the concepts of main equipments for the fuel pin fabrication system. In 2002 we had achieved the conceptual design of main equipments and assignment of those in cells from reception process of fuel particles material to storage process of fuel assemblies concerning the production scale about 50t-HM/y manufacturing system, and estimated the applicability of fabrication system in cell. In this study, we have researched the conceptual design and assignment in cells of main equipments of the vibration packing fuel manufacturing system, quality control, and maintenance of equipments concerning the production scale about 200t-HM/y manufacturing system. The building is constructed independently near here the recycle facility building and fuel particle fabrication building. And then the technical matching and economical evaluation of manufacturing system have been investigated. Resulting these investigations, we have got the basic conceptual design of main equipments for the fuel pin fabrication system in the scale of 200t-HM/y, assignment of main procedure cell and auxiliary equipments, and also the ability of 200 days operation per year based on the quality control and maintenance of equipments. And then we have got the aspect of technical matching to the plant and the reasonable economical evaluation of manufacturing system. It is cleared that this manufacturing method is the suitable one of systems concerning of wet fuel recycle plant for FBR's fuel manufacturing system.

JAEA Reports

None

; Aoi, Masakatsu

JNC TN3410 2001-004, 199 Pages, 2001/03

JNC-TN3410-2001-004.pdf:7.73MB

None

JAEA Reports

None

; Aoi, Masakatsu

JNC TN3410 99-027, 424 Pages, 1999/08

JNC-TN3410-99-027.pdf:10.02MB

None

3 (Records 1-3 displayed on this page)
  • 1