Refine your search:     
Report No.
 - 
Search Results: Records 1-5 displayed on this page of 5
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Annual report of JMTR FY2010

Department of JMTR Operation

JAEA-Review 2011-054, 30 Pages, 2012/03

JAEA-Review-2011-054.pdf:2.25MB

Refurbishment works of the JMTR was carried out in plans from FY2007 to FY2010 and finished all refurbishment work on schedule in this year. Regarding the management and operation of the JMTR, the periodical inspection of facilities based on the law, maintenance and partial renewal works of facilities were carried out, and the fabrication of the fuel for restart has been carried out. As for the management and operation of irradiation facilities, maintenance and partial renewal works of facilities were also carried out. In the hot laboratory, voluntary periodical inspection, maintenance and post-irradiation examinations of irradiated materials were carried out. As for the radiation control at the JMTR facility, irradiation facility and hot laboratory facility, the limit of the radiation exposure dose defined by the safety regulation works were carried out safely under far below. This report describes the FY2010 activities on above mentions.

JAEA Reports

Annual report of JMTR FY2009

Department of JMTR Operation

JAEA-Review 2010-052, 34 Pages, 2010/11

JAEA-Review-2010-052.pdf:1.84MB

JMTR has been stopped since its 165th cycle operation was finished, and the JMTR is advancing its refurbishment works aiming at the restart from FY2011. Regarding the management and operation of the JMTR, the periodical inspection of facilities based on the law, maintenance and partial renewal works of facilities and the transportation of the spent fuels to U.S were carried out, and the fabrication of the fuel for restart has been started. As for the management and operation of irradiation facilities, maintenance and partial renewal works of facilities were also carried out. In the hot laboratory, post-irradiation examinations of irradiated materials and fuels were carried out. As for the radiation control at the JMTR facility, irradiation facility and hot laboratory facility, the limit of the radiation exposure dose defined by the safety regulation works were carried out safely under far below. This report describes the FY2009 activities relating to above mentions.

JAEA Reports

Annual report of JMTR FY2008

Department of JMTR Operation

JAEA-Review 2009-019, 30 Pages, 2009/09

JAEA-Review-2009-019.pdf:6.51MB

As for the refurbishment, the Japan Materials Testing Reactor (JMTR) has been stopped since its 165th cycle operation was finished, and the JMTR is advancing its refurbishment aiming at the reoperation from FY2011. Regarding the management and operation of the JMTR, inspection based on the law, maintenance and preservation works of facilities were carried out. Moreover, in the irradiation facility, maintenance and preservation works on the management and operation were also carried out. In the hot laboratory, post-irradiation examinations using irradiated materials and fuels were carried out. In addition, maintenance and preservation works of facilities and building were also carried out. This report describes the FY2008 activities relating to above mentions.

JAEA Reports

Annual report of JMTR FY2007

Department of JMTR Operation

JAEA-Review 2008-079, 27 Pages, 2009/03

JAEA-Review-2008-079.pdf:3.09MB

As for the refurbishment, the Japan Materials Testing Reactor (JMTR) has been stopping since JMTR 165th cycle operation was finished, and the JMTR is advancing its refurbishment to restart from FY2011. Regarding the management and operation of JMTR, inspection based on the law, maintenance and preservation work of facilities were carried out. Moreover, for the irradiation facility, maintenance and preservation works on the management and operation were also carried out. In the hot laboratory, post irradiation examinations using irradiated specimens in the JMTR were carried out. In addition, maintenance and preservation works of facilities were also carried out. This report describes the FY2007 activities relating to above mentions.

JAEA Reports

Annual report of JMTR, FY2006; April 1, 2006 - March 31, 2007

Department of JMTR Operation

JAEA-Review 2008-006, 41 Pages, 2008/03

JAEA-Review-2008-006.pdf:3.35MB

During the FY2006 (April 2006 to March 2007), the Japan Materials Testing Reactor (JMTR) was operated for three operation cycles from 162nd cycle to 165th cycle. Various irradiation tests and post-irradiation examinations (PIEs) were performed for studies on Irradiation Assisted Stress Corrosion Cracking (IASCC) of light-water-reactor internals, development of the fusion blanket, basic materials researches, radioisotope production, and so on. The operation was stopped by 165th cycle according to schedule. And maintenance work and preservation work of the facilities has been started for the refurbishment of the JMTR. Renewal of equipments and aging management of equipments and reactor facilities were carried out according to long-term maintenance plan which was based on periodical evaluation related to maintenance and safety management of reactor facilities.

5 (Records 1-5 displayed on this page)
  • 1