Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Data/Code 2014-006, 38 Pages, 2014/06
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) was dismantled by the 2011 fiscal year, and ventilating equipment and then liquid waste treatment equipment will be dismantled. This report is a record of the dismantlement situation of the bed material storage tank in 2012 fiscal year.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Data/Code 2012-026, 78 Pages, 2013/01
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2011 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Technology 2012-005, 64 Pages, 2012/04
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2011FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Data/Code 2011-012, 216 Pages, 2011/10
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2010 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Technology 2011-024, 67 Pages, 2011/09
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Technology 2011-017, 77 Pages, 2011/06
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Data/Code 2010-024, 168 Pages, 2011/01
The schedule which will finish dismantling of all equipment in a radiation controlled area is by the 2011 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2009 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Technology 2010-032, 115 Pages, 2010/09
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Technology 2010-002, 66 Pages, 2010/05
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Data/Code 2010-003, 308 Pages, 2010/05
The schedule which will finish dismantling of all equipment in a radiation controlled area is by the 2011 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2008 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Technology 2009-061, 140 Pages, 2010/01
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2008FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes.
Editorial Committee of Refining and Conversion Facility Decommissioning Results
JAEA-Technology 2009-024, 101 Pages, 2009/06
The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center. Process of natural uranium conversion facility (PNC Process) and reprocessed uranium conversion facility (two-stage dry fluorination system) is in a Refining and Conversion Facility. This building started construction in 1979 and was completed in October 1981. The PNC process operated from March 1982 to March 1991. As a result, uranium hexafluoride of about 385 tonU was manufactured. Also, the reprocessed uranium conversion process operated from December 1982 to July 1999. As a result, uranium hexafluoride of about 338 tonU was manufactured. The demonstration of the demolition method was done using the PNC process after the end of operation. The schedule which will finish dismantling of all equipment in a radiation controlled area is by the 2011 fiscal year. This report summarized the present situation by the first half of the 2008 fiscal year of a Refining and Conversion Facility decommissioning.