Refine your search:     
Report No.
 - 
Search Results: Records 1-12 displayed on this page of 12
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Log of refining and conversion facility dismantling; Progress in the dismantlement situation of the bed material storage tank of 2012FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Data/Code 2014-006, 38 Pages, 2014/06

JAEA-Data-Code-2014-006.pdf:14.71MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) was dismantled by the 2011 fiscal year, and ventilating equipment and then liquid waste treatment equipment will be dismantled. This report is a record of the dismantlement situation of the bed material storage tank in 2012 fiscal year.

JAEA Reports

Log of refining and conversion facility dismantling; Progress in 2011FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Data/Code 2012-026, 78 Pages, 2013/01

JAEA-Data-Code-2012-026.pdf:26.08MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2011 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.

JAEA Reports

Present status of Refining and Conversion Facility dismantling; Progress in first Half of 2011FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Technology 2012-005, 64 Pages, 2012/04

JAEA-Technology-2012-005.pdf:6.26MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2011FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.

JAEA Reports

Log of refining and conversion facility dismantling; Progress in 2010FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Data/Code 2011-012, 216 Pages, 2011/10

JAEA-Data-Code-2011-012.pdf:4.22MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2010 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.

JAEA Reports

Present status of Refining and Conversion Facility dismantling; Progress in latter half of 2010FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Technology 2011-024, 67 Pages, 2011/09

JAEA-Technology-2011-024.pdf:4.88MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.

JAEA Reports

Present status of Refining and Conversion Facility dismantling; Progress in first half of 2010FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Technology 2011-017, 77 Pages, 2011/06

JAEA-Technology-2011-017.pdf:5.58MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.

JAEA Reports

Log of refining and conversion facility dismantling; Progress in 2009FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Data/Code 2010-024, 168 Pages, 2011/01

JAEA-Data-Code-2010-024.pdf:25.76MB

The schedule which will finish dismantling of all equipment in a radiation controlled area is by the 2011 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2009 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.

JAEA Reports

Present status of Refining and Conversion Facility dismantling; Progress in latter half of 2009FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Technology 2010-032, 115 Pages, 2010/09

JAEA-Technology-2010-032.pdf:29.72MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes.

JAEA Reports

Present status of Refining and Conversion Facility dismantling; Progress in first half of 2009FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Technology 2010-002, 66 Pages, 2010/05

JAEA-Technology-2010-002.pdf:19.73MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes.

JAEA Reports

Log of refining and conversion facility dismantling; Progress in 2008FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Data/Code 2010-003, 308 Pages, 2010/05

JAEA-Data-Code-2010-003-01.pdf:40.71MB
JAEA-Data-Code-2010-003-02.pdf:62.39MB
JAEA-Data-Code-2010-003-03.pdf:10.06MB

The schedule which will finish dismantling of all equipment in a radiation controlled area is by the 2011 fiscal year. This report is a record of the dismantlement situation of the Refining and Conversion Facility in 2008 fiscal years. Concretely, dismantlement logs, dismantlement material, and secondary waste are published.

JAEA Reports

Present status of Refining and Conversion Facility dismantling; Progress in latter half of 2008FY

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Technology 2009-061, 140 Pages, 2010/01

JAEA-Technology-2009-061.pdf:71.11MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2008FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes.

JAEA Reports

Present status of Refining and Conversion Facility Dismantling; Progress in 2008 first half of the fiscal year

Editorial Committee of Refining and Conversion Facility Decommissioning Results

JAEA-Technology 2009-024, 101 Pages, 2009/06

JAEA-Technology-2009-024.pdf:60.55MB

The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center. Process of natural uranium conversion facility (PNC Process) and reprocessed uranium conversion facility (two-stage dry fluorination system) is in a Refining and Conversion Facility. This building started construction in 1979 and was completed in October 1981. The PNC process operated from March 1982 to March 1991. As a result, uranium hexafluoride of about 385 tonU was manufactured. Also, the reprocessed uranium conversion process operated from December 1982 to July 1999. As a result, uranium hexafluoride of about 338 tonU was manufactured. The demonstration of the demolition method was done using the PNC process after the end of operation. The schedule which will finish dismantling of all equipment in a radiation controlled area is by the 2011 fiscal year. This report summarized the present situation by the first half of the 2008 fiscal year of a Refining and Conversion Facility decommissioning.

12 (Records 1-12 displayed on this page)
  • 1