Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Komabuchi, Mai*; Urushihara, Daisuke*; Asaka, Toru*; Fukuda, Koichiro*; Ohara, Takashi; Munakata, Koji*; Ishikawa, Yoshihisa*
Journal of the Physical Society of Japan, 89(3), p.034601_1 - 034601_5, 2020/03
Times Cited Count:0 Percentile:0(Physics, Multidisciplinary)Fujii, Kotaro*; Yashima, Masatomo*; Hibino, Keisuke*; Shiraiwa, Masahiro*; Fukuda, Koichiro*; Nakayama, Susumu*; Ishizawa, Nobuo*; Hanashima, Takayasu*; Ohara, Takashi
Journal of Materials Chemistry A, 6(23), p.10835 - 10846, 2018/06
Times Cited Count:12 Percentile:61.53(Chemistry, Physical)Kondo, Yasuhiro; Morishita, Takatoshi; Yamazaki, Saishun; Hori, Toshihiko; Sawabe, Yuki; Chishiro, Etsuji; Fukuda, Shimpei; Hasegawa, Kazuo; Hirano, Koichiro; Kikuzawa, Nobuhiro; et al.
Physical Review Special Topics; Accelerators and Beams, 17(12), p.120101_1 - 120101_8, 2014/12
Times Cited Count:6 Percentile:47.51(Physics, Nuclear)We performed a beam test of a new radio frequency quadrupole linac (RFQ III) for the beam current upgrade of the Japan Proton Accelerator Research Complex. First, the conditioning of RFQ III was conducted, and after 20 h of conditioning, RFQ III became very stable with a nominal peak power and duty factor of 400 kW and 1.5%, respectively. An off-line beam test was subsequently conducted before installation in the accelerator tunnel. The transmission, transverse emittance, and energy spread of the 50-mA negative hydrogen beam from RFQ III were measured and compared with simulation results. The experiment and simulation results showed good agreement; therefore, we conclude that the performance of RFQ III conforms to its design.
Kawane, Yusuke*; Miura, Akihiko; Miyao, Tomoaki*; Hirano, Koichiro; Sugimura, Takashi*; Kato, Yuko; Sawabe, Yuki; Fukuda, Shimpei; Ouchi, Nobuo
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1288 - 1291, 2014/10
In the J-PARC Linac, because an upgrading of a beam current up to 50mA using an RF-driven ion source and a new RFQ Linac cavity is in progress, we have developed a new frontend equipments. In order to protect the scraper against 50 mA, we need to observe the temperature and to avoid the excess heat loading of the scraper surface and to count the irradiated beam particles. We also monitor the beam transmission between the upstream and downstream of the chopper cavity to check the chopping errors using the beam current monitors. We fabricated the interlock system for the temperature, irradiated particle numbers and beam transmission. And we tested them in the test stand with actual beam. This paper describes the interlock system and their test results.
Yamazaki, Yoshio; Hirano, Koichiro*; Fukuda, Satoshi*; Takano, Mikio*; Araki, Sakae*; Terunuma, Nobuhiro*; Urakawa, Junji*
Proceedings of 9th European Particle Accelerator Conference (EPAC 2004), 0 Pages, 2004/07
Focusing on the cover layer materials (as the Radon Barrier Materials), which could have the effect to restrain the radon from scattering into the air and the effect of the radiation shielding, we produced the radon barrier materials with crude bentonite on an experimental basis, using the rotary type comprehensive unit for grinding and mixing, through which we carried out the evaluation of the characteristics thereof.