Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Watanabe, Tamaki*; Toyama, Takeshi*; Hanamura, Kotoku*; Imao, Hiroshi*; Kamigaito, Osamu*; Kamoshida, Atsushi*; Kawachi, Toshihiko*; Koyama, Ryo*; Sakamoto, Naruhiko*; Fukunishi, Nobuhisa*; et al.
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1105 - 1108, 2019/07
Upgrades for the RIKEN heavy-ion linac (RILAC) involving a new superconducting linac (SRILAC) are currently underway at the RIKEN radioactive isotope beam factory (RIBF). It is crucially important to develop nondestructive beam measurement diagnostics. We have developed a beam energy position monitor (BEPM) system which can measure not only the beam position but also the beam energy simultaneously by measuring the time of flight of the beam. We fabricated 11 BEPMs and completed the position calibration to obtain the sensitivity and offset for each BEPMs. The position accuracy has been achieved to be less than 0.1 mm by using the mapping measurement.
Hatakeyama, Shuichiro; Hayashi, Naoki; Arakawa, Dai*; Hashimoto, Yoshinori*; Hiramatsu, Shigenori*; Odagiri, Junichi*; Sato, Kenichiro*; Tejima, Masaki*; Tobiyama, Makoto*; Toyama, Takeshi*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2698 - 2700, 2010/05
The Data Acquisition System of Beam Position Monitors (BPMs) in J-PARC Main Ring are consist of 186 Linux-based Data Processing Circuits (BPMCs) and 12 EPICS IOCs. They are important tool to see the COD and turn-by-turn beam positions. This report describes the process of the data reconstruction which include how the various calibration constants are applied.
Tejima, Masaki*; Arakawa, Dai*; Hashimoto, Yoshinori*; Sato, Kenichiro*; Toyama, Takeshi*; Yamamoto, Noboru*; Hayashi, Naoki; Hanamura, Kotoku*
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.978 - 980, 2010/05
To maintain the beam orbit of beam transport line from RCS to MR in J-PARC (3-50BT), 14 beam position monitors (BPMs) were installed. Their signals gathered in the local control building (D01) have been measured by using 14 digitizing oscilloscopes. The data acquisition system have a performance of shot-by-shot measurement.
Toyama, Takeshi*; Arakawa, Dai*; Hiramatsu, Shigenori*; Igarashi, Susumu*; Lee, S.*; Matsumoto, Hiroshi*; Odagiri, Junichi*; Tejima, Masaki*; Tobiyama, Makoto*; Hashimoto, Yoshinori*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.981 - 983, 2010/05
Experiences of operating BPM's during beam commissioning at the J-PARC MR are reported. The subjects are: (1) bug report, statistics and especially the effect of a beam duct step, (2) position resolution estimation (30 micrometers with 1 sec averaging), (3) beam based alignment.