Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 156

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Pd nanoparticles on the outer surface of microporous aluminosilicates for the direct alkylation of benzenes using alkanes

Misaki, Satoshi*; Miwa, Hiroko*; Ito, Takashi; Yoshida, Takefumi*; Hasegawa, Shingo*; Nakamura, Yukina*; Tokutake, Shunta*; Takabatake, Moe*; Shimomura, Koichiro*; Chun, W.-J.*; et al.

ACS Catalysis, 13(18), p.12281 - 12287, 2023/09

 Times Cited Count:1 Percentile:46.87(Chemistry, Physical)

Journal Articles

Development of a bunch-width monitor for low-intensity muon beam below a few MeV

Sue, Yuki*; Yotsuzuka, Mai*; Futatsukawa, Kenta*; Hasegawa, Kazuo; Iijima, Toru*; Iinuma, Hiromi*; Inami, Kenji*; Ishida, Katsuhiko*; Kawamura, Naritoshi*; Kitamura, Ryo; et al.

Physical Review Accelerators and Beams (Internet), 23(2), p.022804_1 - 022804_7, 2020/02

 Times Cited Count:2 Percentile:25.94(Physics, Nuclear)

A destructive monitor to measure the longitudinal bunch width of a low-energy and low-intensity muon beam was developed. This bunch-width monitor (BWM) employed microchannel plates to detect a single muon with high time resolution. In addition, constant-fraction discriminators were adopted to suppress the time-walk effect. The time resolution was measured to be 65 ps in rms using a picosecond-pulsed laser. This resolution satisfied the requirements of the muon linac of the J-PARC E34 experiment. We measured the bunch width of negative-muonium ions accelerated with a radio-frequency quadrupole using the BWM. The bunch width was successfully measured to be $$sigma$$ 54 $$pm$$ 11 ns, which is consistent with the simulation.

Journal Articles

Negative muonium ion production with a C12A7 electride film

Otani, Masashi*; Fukao, Yoshinori*; Futatsukawa, Kenta*; Kawamura, Naritoshi*; Matoba, Shiro*; Mibe, Tsutomu*; Miyake, Yasuhiro*; Shimomura, Koichiro*; Yamazaki, Takayuki*; Hasegawa, Kazuo; et al.

Journal of Physics; Conference Series, 1350, p.012067_1 - 012067_6, 2019/12

 Times Cited Count:2 Percentile:73.22(Physics, Particles & Fields)

Negative muonium atom ($$mu^+$$e$$^-$$e$$^-$$, Mu$$^-$$) has unique features stimulating potential interesting for several scientific fields. Since its discovery in late 1980's in vacuum, it has been discussed that the production efficiency would be improved using a low-work function material. C12A7 was a well-known insulator as a constituent of alumina cement, but was recently confirmed to exhibit electric conductivity by electron doping. The C12A7 electride has relatively low-work function (2.9 eV). In this paper, the negative muonium production measurement with several materials including a C12A7 electride film will be presented. Measured production rate of the Mu$$^-$$ were 10$$^{-3}$$/s for all the Al, electride, and SUS target. Significant enhancement on electride target was not observed, thus it is presumed that the surface condition should be more carefully treated. There was no material dependence of the Mu$$^-$$ averaged energy: it was 0.2$$pm$$0.1keV.

Journal Articles

Bunch size measurement with high time resolution for RF accelerated muon beam

Sue, Yuki*; Iijima, Toru*; Inami, Kenji*; Yotsuzuka, Mai*; Iinuma, Hiromi*; Nakazawa, Yuga*; Otani, Masashi*; Kawamura, Naritoshi*; Shimomura, Koichiro*; Futatsukawa, Kenta*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.55 - 60, 2019/07

The result of bunch size measurement of muon accelerated by RFQ up to 89 keV is presented in this paper. A four-stage muon linac for precise measurement of muon property is under construction in the J-PARC. The demonstration of the first muon RF acceleration with an RFQ linac was conducted and the transverse profile of the accelerated muons was measured in 2017. As one of the remaining issues for the beam diagnostic system, the longitudinal beam profile after the RFQ should be measured to match the profile to the designed acceptance of the subsequent accelerator. For this purpose, the new longitudinal beam monitor using the microchannel plate is under development. The time resolution of the monitor aims to be around 30 to 40 ps corresponding to 1% of a period of an operating frequency of the accelerator, which is 324 MHz. On November 2018, the bunch size of accelerated negative muonium ion of 89 keV with the RFQ was measured using this monitor at the J-PARC MLF. The measured bunch width is $$0.54pm0.13$$ ns, which is consistent with the simulation.

Journal Articles

Development of the longitudinal beam profile monitor with high time resolution for realization of low-emittance muon beam in the J-PARC E34 muon g-2/EDM experiment

Yotsuzuka, Mai*; Iijima, Toru*; Iinuma, Hiromi*; Inami, Kenji*; Otani, Masashi*; Kawamura, Naritoshi*; Kitamura, Ryo; Kondo, Yasuhiro; Saito, Naohito; Shimomura, Koichiro*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.814 - 817, 2019/07

The J-PARC E34 experiment aims to measure the muon anomalous magnetic moment and the electric dipole moment with a high precision. In this experiment, thermal muonium is produced and ionized by laser resonance to generate ultra-slow muons, which are then accelerated in a multistage muon linac. In order to satisfy the experimental requirements, suppression of the emittance growth during the acceleration is necessary. Because the main cause of the emittance growth is beam mismatching between the accelerating stages, the transverse and longitudinal beam monitoring is important. The longitudinal beam monitor has to measure the bunch length with the resolution equivalent to tens of picoseconds, which is 1% of the acceleration phase of 324 MHz. In addition, it should be sensitive to single muon because the beam intensity is limited during the commissioning phase. To realize above requirements, we are developing a longitudinal beam monitor with a micro channel plate, and the test bench to evaluate the monitor performance. So far, the time resolution of the beam monitor was obtained to be 65 ps in RMS including the jitter on the test bench. We also succeeded in measuring the longitudinal bunch size of the muon beam accelerated by RFQ using the beam monitor. In this paper, the results of the performance evaluation for this beam monitor are reported.

Journal Articles

Development of the longitudinal beam monitor with high time resolution for a muon linac in the J-PARC E34 experiment

Yotsuzuka, Mai*; Iijima, Toru*; Inami, Kenji*; Sue, Yuki*; Iinuma, Hiromi*; Nakazawa, Yuga*; Saito, Naohito; Hasegawa, Kazuo; Kondo, Yasuhiro; Kitamura, Ryo; et al.

Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.2571 - 2574, 2019/06

The J-PARC E34 experiment aims to measure the muon anomalous magnetic moment and the electric dipole moment with a high precision. In this experiment, thermal muonium is produced and ionized by laser resonance to generate ultra-slow muons, which are then accelerated in a multistage muon linac. In order to satisfy the experimental requirements, suppression of the emittance growth during the acceleration is necessary. Because the main cause of the emittance growth is beam mismatching between the accelerating stages, the transverse and longitudinal beam monitoring is important. The longitudinal beam monitor has to measure the bunch length with the resolution equivalent to tens of picoseconds, which is 1% of the acceleration phase of 324 MHz. In addition, it should be sensitive to single muon because the beam intensity is limited during the commissioning phase. To realize above requirements, we are developing a longitudinal beam monitor with a micro channel plate, and the test bench to evaluate the monitor performance. So far, the time resolution of the beam monitor was obtained to be 65 ps in RMS including the jitter on the test bench. We also succeeded in measuring the longitudinal bunch size of the muon beam accelerated by RFQ using the beam monitor. Further improvement of the measurement system is needed to guarantee the required accuracy. In this paper, the results of the performance evaluation for this beam monitor are reported.

Journal Articles

Discussion on translational research of drug product for targeted alpha therapy, 2

Yano, Tsuneo*; Hasegawa, Koki*; Sato, Tatsuhiko; Hachisuka, Akiko*; Fukase, Koichi*; Hirabayashi, Yoko*

Iyakuhin Iryo Kiki Regyuratori Saiensu, 50(3), p.122 - 134, 2019/03

This report provides an overview of alpha-particle-emitting radiopharmaceuticals applied by micro-dosimetry.

Journal Articles

Muon profile measurement after acceleration with a radio-frequency quadrupole linac

Otani, Masashi*; Sue, Yuki*; Fukao, Yoshinori*; Futatsukawa, Kenta*; Kawamura, Naritoshi*; Mibe, Tsutomu*; Miyake, Yasuhiro*; Shimomura, Koichiro*; Yamazaki, Takayuki*; Iijima, Toru*; et al.

Journal of Physics; Conference Series, 1067(5), p.052012_1 - 052012_7, 2018/09

 Times Cited Count:1 Percentile:47.2(Physics, Particles & Fields)

We have measured the muon beam profile after acceleration using a radio frequency quadrupole linac (RFQ). Positive muons are injected to an aluminum degrader and negative muoniums (Mu$$^{-}$$) are generated. The generated Mu$$^{-}$$s are extracted by an electrostatic lens and accelerated to 89 keV by the RFQ. The accelerated Mu$$^{-}$$s are transported to a beam profile monitor (BPM) through a quadrupole magnet pair and a bending magnet. The BPM consists of a micro-channel plate, a phospher screen, and a CCD camera. Measured profile in the vertical direction is consistent to the simulation. This profile measurement is one of milestones for realizing a muon linac for measurement of the muon anomalous magnetic moment at the Japan Proton Accelerator Research Complex.

Journal Articles

First muon acceleration using a radio-frequency accelerator

Bae, S.*; Choi, H.*; Choi, S.*; Fukao, Yoshinori*; Futatsukawa, Kenta*; Hasegawa, Kazuo; Iijima, Toru*; Iinuma, Hiromi*; Ishida, Katsuhiko*; Kawamura, Naritoshi*; et al.

Physical Review Accelerators and Beams (Internet), 21(5), p.050101_1 - 050101_6, 2018/05

 Times Cited Count:15 Percentile:77.82(Physics, Nuclear)

Muons have been accelerated by using a radio-frequency accelerator for the first time. Negative muonium atoms (Mu$$^{-}$$), which are bound states of positive muons and two electrons, are generated from through the electron capture process in an aluminum degrader. The generated Mu$$^{-}$$'s are initially electrostatically accelerated and injected into a radio-frequency quadrupole linac (RFQ). In the RFQ, the Mu$$^{-}$$'s are accelerated to 89 keV. The accelerated Mu$$^{-}$$'s are identified by momentum measurement and time of flight. This compact muon linac opens the door to various muon accelerator applications including particle physics measurements and the construction of a transmission muon microscope.

Journal Articles

Retreat from stress; Rattling in a planar coordination

Suekuni, Koichiro*; Lee, C. H.*; Tanaka, Hiromi*; Nishibori, Eiji*; Nakamura, Atsushi*; Kasai, Hidetaka*; Mori, Hitoshi*; Usui, Hidetomo*; Ochi, Masayuki*; Hasegawa, Takumi*; et al.

Advanced Materials, 30(13), p.1706230_1 - 1706230_6, 2018/03

 Times Cited Count:51 Percentile:89.35(Chemistry, Multidisciplinary)

Thermoelectric materials for highly efficient devices must satisfy conflicting requirements of high electrical conductivity and low thermal conductivity. In this paper, we studied the crystal structure and phonon dynamics of tetrahedrites (Cu,Zn)$$_{12}$$(Sb,As)$$_{4}$$S$$_{13}$$. The results revealed that the Cu atoms in a planar coordination are rattling, which effectively scatter phonons. These findings provide a new strategy for the development of highly efficient thermoelectric materials with planar coordination.

Journal Articles

Current preparation and prospects of the muon acceleration test with RFQ in J-PARC

Kitamura, Ryo*; Otani, Masashi*; Kondo, Yasuhiro; Bae, S.*; Choi, S.*; Fukao, Yoshinori*; Futatsukawa, Kenta*; Hasegawa, Kazuo; Iinuma, Hiromi*; Ishida, Katsuhiko*; et al.

Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.100 - 103, 2017/12

Muon acceleration is an important technique in exploring the new frontier of physics. A new measurement of the muon dipole moments is planned in J-PARC using the muon linear accelerator. The low-energy (LE) muon source using the thin metal foil target and beam diagnostic system were developed for the world's first muon acceleration. Negative muonium ions from the thin metal foil target as the LE muon source was successfully observed. Also the beam profile of the LE positive muon was measured by the LE-dedicated beam profile monitor. The muon acceleration test using a Radio-Frequency Quadrupole linac (RFQ) is being prepared as the first step of the muon accelerator development. In this paper, the latest status of the first muon acceleration test is described.

Journal Articles

First trial of the muon acceleration for J-PARC muon g-2/EDM experiment

Kitamura, Ryo*; Otani, Masashi*; Fukao, Yoshinori*; Kawamura, Naritoshi*; Mibe, Tsutomu*; Miyake, Yasuhiro*; Shimomura, Koichiro*; Kondo, Yasuhiro; Hasegawa, Kazuo; Bae, S.*; et al.

Proceedings of 8th International Particle Accelerator Conference (IPAC '17) (Internet), p.2311 - 2313, 2017/06

Muon acceleration is an important technique in exploring the new frontier of physics. A new measurement of the muon dipole moments is planned in J-PARC using the muon linear accelerator. The low-energy (LE) muon source using the thin metal foil target and beam diagnostic system were developed for the world's first muon acceleration. Negative muonium ions from the thin metal foil target as the LE muon source was successfully observed. Also the beam profile of the LE positive muon was measured by the LE-dedicated beam profile monitor. The muon acceleration test using a Radio-Frequency Quadrupole linac (RFQ) is being prepared as the first step of the muon accelerator development. In this paper, the latest status of the first muon acceleration test is described.

Journal Articles

Muon acceleration using an RFQ

Kondo, Yasuhiro; Hasegawa, Kazuo; Otani, Masashi*; Mibe, Tsutomu*; Fukao, Yoshinori*; Kawamura, Naritoshi*; Miyake, Yasuhiro*; Shimomura, Koichiro*; Kitamura, Ryo*; Ishida, Katsuhiko*; et al.

Proceedings of 28th International Linear Accelerator Conference (LINAC 2016) (Internet), p.992 - 995, 2017/05

The muon linear accelerator for the muon g-2/EDM experiment in J-PARC is being developed. As the first step of the muon acceleration, the muon acceleration with J-PARC RFQ (Radio-Frequency Quadrupole)-II plans to be demonstrated at H-line of J-PARC MLF. The slow muon will be obtained by the deceleration using the thin metal foil target in the RFQ acceleration test. The intensity of the decelerated muon by the thin metal foil was measured. Based on this result, the beam intensity in the RFQ test at H-line is estimated to be a few /sec. The particle simulation of the RFQ and the following beam diagnostics system is conducted, and it is shown that the emittance measurement at the RFQ exit using the micro-channel plate based beam profile monitor is feasible.

Journal Articles

Current status of the muon initial acceleration with RFQ for muon g-2/EDM experiment

Kitamura, Ryo*; Otani, Masashi*; Fukao, Yoshinori*; Kawamura, Naritoshi*; Mibe, Tsutomu*; Miyake, Yasuhiro*; Shimomura, Koichiro*; Kondo, Yasuhiro; Hasegawa, Kazuo; Ishida, Katsuhiko*; et al.

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.476 - 479, 2016/11

The muon linear accelerator for the muon g-2/EDM experiment in J-PARC is being developed. As the first step of the muon acceleration, the muon acceleration with J-PARC RFQ (Radio-Frequency Quadrupole)-II plans to be demonstrated at H-line of J-PARC MLF. The slow muon will be obtained by the deceleration using the thin metal foil target in the RFQ acceleration test. The intensity of the decelerated muon by the thin metal foil was measured. Based on this result, the beam intensity in the RFQ test at H-line is estimated to be a few /sec. The particle simulation of the RFQ and the following beam diagnostics system is conducted, and it is shown that the emittance measurement at the RFQ exit using the micro-channel plate based beam profile monitor is feasible.

Journal Articles

Study on flaw-to-surface proximity rule for transforming subsurface flaws to surface flaws based on fatigue crack growth experiments

Hasegawa, Kunio; Li, Y.; Saito, Koichi*

Journal of Pressure Vessel Technology, 137(4), p.041101_1 - 041101_7, 2015/08

 Times Cited Count:3 Percentile:16.43(Engineering, Mechanical)

If a subsurface flaw is located near a component surface, the subsurface flaw is transformed to a surface flaw in accordance with a flaw-to-surface proximity rule. The re-characterization process from subsurface to surface flaw is adopted in all fitness-for-service (FFS) codes. However, the concrete criteria of the re-characterizations are different among the FFS codes. Cyclic tensile experiment was conducted on a carbon steel flat plate with a subsurface flaw at ambient temperature. The objective of the paper is to compare the experiment and calculation of fatigue crack growth behavior for a subsurface flaw and the transformed surface flaw, and to describe the validity of the flaw-to-surface proximity rule defined by ASME Code Section XI, JSME S NA1 Code and other codes.

Journal Articles

On-site background measurements for the J-PARC E56 experiment; A Search for the sterile neutrino at J-PARC MLF

Ajimura, Shuhei*; Bezerra, T. J. C.*; Chauveau, E.*; Enomoto, T.*; Furuta, Hisataka*; Harada, Masahide; Hasegawa, Shoichi; Hiraiwa, T.*; Igarashi, Yoichi*; Iwai, Eito*; et al.

Progress of Theoretical and Experimental Physics (Internet), 2015(6), p.063C01_1 - 063C01_19, 2015/06

 Times Cited Count:6 Percentile:45.25(Physics, Multidisciplinary)

The J-PARC E56 experiment aims to search for sterile neutrinos at the J-PARC Materials and Life Science Experimental Facility (MLF). In order to examine the feasibility of the experiment, we measured the background rates of different detector candidate sites, which are located at the third floor of the MLF, using a detector consisting of plastic scintillators with a fiducial mass of 500 kg. The gammas and neutrons induced by the beam as well as the backgrounds from the cosmic rays were measured, and the results are described in this article.

Journal Articles

Beam test of a new radio frequency quadrupole linac for the Japan Proton Accelerator Research Complex

Kondo, Yasuhiro; Morishita, Takatoshi; Yamazaki, Saishun; Hori, Toshihiko; Sawabe, Yuki; Chishiro, Etsuji; Fukuda, Shimpei; Hasegawa, Kazuo; Hirano, Koichiro; Kikuzawa, Nobuhiro; et al.

Physical Review Special Topics; Accelerators and Beams, 17(12), p.120101_1 - 120101_8, 2014/12

 Times Cited Count:6 Percentile:42.9(Physics, Nuclear)

We performed a beam test of a new radio frequency quadrupole linac (RFQ III) for the beam current upgrade of the Japan Proton Accelerator Research Complex. First, the conditioning of RFQ III was conducted, and after 20 h of conditioning, RFQ III became very stable with a nominal peak power and duty factor of 400 kW and 1.5%, respectively. An off-line beam test was subsequently conducted before installation in the accelerator tunnel. The transmission, transverse emittance, and energy spread of the 50-mA negative hydrogen beam from RFQ III were measured and compared with simulation results. The experiment and simulation results showed good agreement; therefore, we conclude that the performance of RFQ III conforms to its design.

Journal Articles

Present status of J-PARC linac

Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10

no abstracts in English

Journal Articles

JT-60SA assembly and metrology

Suzuki, Sadaaki; Yagyu, Junichi; Masaki, Kei; Nishiyama, Tomokazu; Nakamura, Shigetoshi; Saeki, Hisashi; Hoshi, Ryo; Sawai, Hiroaki; Hasegawa, Koichi; Arai, Takashi; et al.

NIFS-MEMO-67, p.266 - 271, 2014/02

no abstracts in English

Journal Articles

Assembly study for JT-60SA tokamak

Shibanuma, Kiyoshi; Arai, Takashi; Hasegawa, Koichi; Hoshi, Ryo; Kamiya, Koji; Kawashima, Hisato; Kubo, Hirotaka; Masaki, Kei; Saeki, Hisashi; Sakurai, Shinji; et al.

Fusion Engineering and Design, 88(6-8), p.705 - 710, 2013/10

 Times Cited Count:10 Percentile:61.16(Nuclear Science & Technology)

156 (Records 1-20 displayed on this page)