Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 116

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Continuous acceleration of soil heterotrophic respiration over 16 years of soil warming in a sub-boreal forested peatland

Ma, R.*; Takagi, Kentaro*; Kondo, Toshiaki*; Koarashi, Jun; Atarashi-Andoh, Mariko; Kobayashi, Makoto*; Aguilos, M.*; Ryhti-Laine, K.*; Sun, L.*; Takahashi, Yoshiyuki*; et al.

Soil Biology & Biochemistry, 221, p.110212_1 - 110212_10, 2026/10

 Times Cited Count:0 Percentile:0.00(Soil Science)

Journal Articles

Progressive release of long-stored carbon from tropical peatland disturbances

Koarashi, Jun; Ito, Masayuki*; Atarashi-Andoh, Mariko; Kokubu, Yoko; Matsueda, Makoto; Kusin, K.*; Jaya, A.*; Dohong, S.*; Hirano, Takashi*

Nature Communications (Internet), 17, p.4369_1 - 4369_9, 2026/05

 Times Cited Count:0 Percentile:0.00(Multidisciplinary Sciences)

Tropical peatlands are globally important, millennia-old carbon sinks, yet unprecedented human-driven degradation is triggering alarming carbon emissions. Comprehensive quantification of carbon dynamics across the disturbance sequence, from peat swamp forests to drained and fire-impacted peatlands, remains a critical knowledge gap. Here we show that over 18 years (1996-2014), drainage and subsequent peat fires released approximately 30-41 kg C m$$^{-2}$$ from peatlands in Central Kalimantan, Indonesia, using radiocarbon dating of peat profiles and groundwater dissolved organic carbon. Drainage contributed 5-11 kg C m$$^{-2}$$, primarily from centuries- to millennium-old, previously waterlogged peat. Fires released 23-32 kg C m$$^{-2}$$ from peat accumulated over the past 3,000 years, initiating progressive oxidative decomposition of older peat. Extrapolation to Indonesia's disturbed peatlands suggests a release of 0.81-3.70 Gt between 1996 and 2014, with ongoing decomposition releasing an additional 0.03-0.08 Gt C annually, accelerating the impact on the global carbon balance.

Journal Articles

J-PARC LINAC 50 Hz operation verification study

Kondo, Yasuhiro; Chimura, Motoki; Cicek, E.*; Fukui, Yuji*; Futatsukawa, Kenta*; Fuwa, Yasuhiro; Goto, Rikuto*; Hirano, Koichiro; Ishikawa, Masaki*; Ito, Takashi; et al.

Proceedings of 22nd Annual Meeting of Particle Accelerator Society of Japan (Internet), p.124 - 129, 2026/03

Various upgrade plans of the J-PARC linac are underway, and repetition-rate doubling project is one of the most important part. Currently, the linac supplies a 400~MeV H$$^-$$ ion beam to the 3~GeV synchrotron (RCS) at a repetition rate of 25~Hz. However, to deliver the beam to both RCS and proton-beam irradiation facility under planning, it is necessary to raise the repetition rate from 25~Hz to 50~Hz. Prior to construction of the beamline to the irradiation facility, we conducted a verification of the 50~Hz operation of all the linac apparatus simultaneously within the current operational limits in May 2025. And also, the verification of the 50~Hz operation of the particle counter system, which is one of the most important safety device of the J-PARC accelerator, was conducted. As a result, any significant problems were not found out, and it is now ready for the upcoming 50~Hz-beam acceleration demonstration. This paper describes this details of the demonstration of the 50~Hz operation, without beam acceleration, of the J-PARC linac.

Journal Articles

Progress in linac beam commissioning for high-intensity operations for J-PARC power upgrades

Liu, Y.*; Otani, Masashi*; Miyao, Tomoaki*; Nakazawa, Yuga*; Shibata, Takanori*; Nammo, Kesao*; Fang, Z.*; Futatsukawa, Kenta*; Fukui, Yuji*; Mizobata, Satoshi*; et al.

Proceedings of 16th International Particle Accelerator Conference (IPAC25) (Internet), p.855 - 857, 2025/11

Journal Articles

Investigation of an Rf window for the J-PARC DTL

Arai, Sora; Ito, Takashi; Hirano, Koichiro

Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.455 - 458, 2023/11

A drift tube linac (DTL) is used in the J-PARC linac. An event occurred in the DTL cavity where the arc sensor module frequently detected electrical discharges. The area of discharge was the ceramic surface of the RF window. When removed and checked, there were discharge marks on the vacuum seal material and ceramic. In addition, dust had accumulated inside of the DTL. Discharge marks were observed using a laser microscope. Melting marks were found on the surface of the vacuum sealant, and adhesions were found on the surface of the ceramic. The relative permittivity and dielectric loss tangent of the removed ceramics were measured using a cavity resonator. The relative permittivity did not change, but the dielectric loss tangent increased the longer it was used.

Journal Articles

Cavity cleaning for suppression of multipactor occured at J-PARC SDTL

Ito, Takashi; Morishita, Takatoshi; Hirano, Koichiro; Kitamura, Ryo; Kobayashi, Fuminori; Arai, Sora; Nammo, Kesao*; Nemoto, Yasuo*; Kosaka, Satoshi*

Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.193 - 196, 2023/01

The SDTL, which is the main accelerator of the J-PARC linac, has been experiencing a problem in which power cannot be supplied to the SDTL cavity due to an increase in reflected power near the operating power for some of the SDTLs. After investigating the cavity interior and conducting simulations, it was determined that the cause of the problem was multipactors generated on the cavity inner walls. To solve this problem, we have implemented several countermeasures for SDTL cavities, the most effective of which was a cleaning of the inner surface of the cavity. We have cleaned the cavities with acetone, dilute sulfuric acid, and dilute hydrochloric acid, and have been able to eliminate most of the defects in six cavities, including two cavities that were in particularly bad condition. This paper reports on the details of the cleaning of the inner surface of the SDTL cavities that have been carried out so far.

Journal Articles

Bayesian uncertainty evaluation of Charpy ductile-to-brittle transition temperature for reactor pressure vessel steels

Takamizawa, Hisashi; Nishiyama, Yutaka; Hirano, Takashi*

Proceedings of ASME 2020 Pressure Vessels and Piping Conference (PVP 2020) (Internet), 7 Pages, 2020/08

no abstracts in English

Journal Articles

Upgrade of the 3-MeV linac for testing of accelerator components at J-PARC

Kondo, Yasuhiro; Hirano, Koichiro; Ito, Takashi; Kikuzawa, Nobuhiro; Kitamura, Ryo; Morishita, Takatoshi; Oguri, Hidetomo; Okoshi, Kiyonori; Shinozaki, Shinichi; Shinto, Katsuhiro; et al.

Journal of Physics; Conference Series, 1350, p.012077_1 - 012077_7, 2019/12

 Times Cited Count:3 Percentile:75.19(Physics, Particles & Fields)

We have upgraded a 3-MeV linac at J-PARC. The ion source is same as the J-PARC linac's, and the old 30-mA RFQ is replaced by a spare 50-mA RFQ, therefore, the beam energy is 3 MeV and the nominal beam current is 50 mA. The main purpose of this system is to test the spare RFQ, but also used for testing of various components required in order to keep the stable operation of the J-PARC accelerator. The accelerator has been already commissioned, and measurement programs have been started. In this paper, present status of this 3-MeV linac is presented.

Journal Articles

Status of 3 MeV beam scrapers for the J-PARC LINAC

Hirano, Koichiro; Sugimura, Takashi*; Kurihara, Toshikazu*

Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.324 - 328, 2018/08

We could use a 3 MeV beam scraper without a problem for five months when the scraper received to 1.3 times as high as a normal average beam current of the scraper in 1MW beam operation. The peak temperature on the scraper surface was 1800$$^{circ}$$C. Irradiation damage caused by the 3 MeV beam with particle number of 3E22 was 700 $$mu$$m depth. We study scraper materials which can withstand the current density higher than carbon composite used in the scraper because almost all beams can be irradiated to the scraper in 1 MW beam operation. Beam irradiation tests have been performed about graphene and tungsten as scraper materials with high heat conductivity. This paper describes beam irradiation test of the 3 MeV beam scraper and scraper materials.

Journal Articles

Negative hydrogen ion beam irradiation experiments of beam scrapers using the J-PARC 3 MeV-Linac

Hirano, Koichiro; Ishiyama, Tatsuya; Kurihara, Toshikazu*; Sugimura, Takashi*; Maruta, Tomofumi*

Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.847 - 852, 2017/12

Beam scrapers made of carbon composite have been used in the MEBT1 between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC Linac. We have conducted the scraper irradiation test with the 3 MeV linac. The test piece of the scraper was irradiated by the H$$^{-}$$ beam up to particle number of 1.2E20. We measured the surface temperature of more than 3000$$^{circ}$$C using a high-speed radiation thermometer and observed the irradiation damage on the scraper by using the laser microscope. When the surface temperature exceeded 2900$$^{circ}$$C, the ionic current of carbon and the irradiation damage on the surface of the test piece rapidly increased. This paper describes beam irradiation test results of the scraper.

Journal Articles

A 3 MeV linac for development of accelerator components at J-PARC

Kondo, Yasuhiro; Asano, Hiroyuki*; Chishiro, Etsuji; Hirano, Koichiro; Ishiyama, Tatsuya; Ito, Takashi; Kawane, Yusuke; Kikuzawa, Nobuhiro; Meigo, Shinichiro; Miura, Akihiko; et al.

Proceedings of 28th International Linear Accelerator Conference (LINAC 2016) (Internet), p.298 - 300, 2017/05

We have constructed a linac for development of various accelerator components at J-PARC. The ion source is same as the J-PARC linac's, and the RFQ is a used one in the J-PARC linac. The beam energy is 3 MeV and nominal beam current is 30 mA. The accelerator has been already commissioned, and the first development program, laser-charge-exchange experiment for the transmutation experimental facility, has been started. In this paper, present status of this 3-MeV linac is presented.

Journal Articles

Development of a vertical collimator at the mebt1 of J-PARC linac

Sugimura, Takashi*; Maruta, Tomofumi*; Hirano, Koichiro

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.307 - 309, 2016/11

There is an upgrade plan of J-PARC (Japan Proton Accelerator Research Complex) Linac from currently operated beam parameters such as, beam current of 40 mA, beam pulse width of 0.5msec and repetition of 25 Hz, to 50 mA, 0.5msec and 50 Hz, respectively. To reduce beam loss during a beam acceleration is a must task to accelerate a high power beam. At J-PARC Linac, a beam from an ion source followed by RFQ (Radio Frequency Quadrupole) injected into a series of DTLs (Drift Tube Linac) through a MEBT1 (Medium Energy Beam Transport 1), where a beam matching and a beam pulse forming are carried out at the beam energy of 3 MeV. There are some locally activated spots in DTL area at the current beam power level so that some kind of mitigation measure is required. Beam simulation results show that the beam loss at the DTL area can be reduced if there is a pair of vertical beam collimators. This paper reports a design and fabrication status of new vertical collimators.

Journal Articles

Long distant microscope observation of radiation damage (blistering); Laser reflection microscope

Kurihara, Toshikazu*; Kobayashi, Hitoshi*; Sugimura, Takashi*; Hirano, Koichiro

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.814 - 816, 2016/11

A problem of irradiation damage is the one observed in each part of a component of particle accelerators; accelerating tubs, scrapers, monitors and neutron targets. In-situ observation by an actual proton accelerator is made our last target. We observed the radiation damage of the various materials used by particle accelerators. From the distant place the target which is in the high radiation area, we propose the method to get information from the catoptric light from the target using a laser as a light source. A principle of this observation method as well as generating process of blisterings and limitation of this method will be reported.

Journal Articles

Development of beam scrapers using a 3-Mev linac at J-PARC

Hirano, Koichiro; Asano, Hiroyuki; Ishiyama, Tatsuya; Ito, Takashi; Okoshi, Kiyonori; Oguri, Hidetomo; Kondo, Yasuhiro; Kawane, Yusuke; Kikuzawa, Nobuhiro; Sato, Yoshikatsu; et al.

Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.310 - 313, 2016/11

We have used a beam scraper with the incident angle of 65deg to reduce the beam power deposition density in the MEBT between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC linac. The 65$$^{circ}$$ scraper was irradiated by the H$$^{-}$$ beam up to particle number of 1.47E22. We observed a lot of surface projections with several hundred micrometers high in the beam irradiation damage on the scraper by using the laser microscope. In order to study the limits of scrapers, we constructed a new 3 MeV linac at J-PARC. We will conduct the scraper irradiation test at the end of this year.

Journal Articles

Development of RF chopper system at J-PARC Linac, 2

Hirano, Koichiro; Kondo, Yasuhiro; Kawane, Yusuke; Shinozaki, Shinichi; Miura, Akihiko; Morishita, Takatoshi; Sawabe, Yuki; Sugimura, Takashi*; Naito, Fujio*; Fang, Z.*; et al.

Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.944 - 947, 2015/09

Two RF-deflecting cavities as a chopper and a beam scraper have been used in the MEBT1 between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC Linac. We replaced with a newly fabricated RF chopper to decrease beam loss for the operation with 50 mA. We installed two new scrapers to absorb the higher power of the deflected beam by the RF chopper. This paper describes the RF chopper system and beam irradiation test results of the scraper.

Journal Articles

Operating status of the ACS in the J-PARC linac

Nemoto, Yasuo; Tamura, Jun; Ito, Takashi; Morishita, Takatoshi; Hirano, Koichiro; Kondo, Yasuhiro; Oguri, Hidetomo; Sugimura, Takashi*; Nammo, Kesao*; Ao, Hiroyuki*

Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1101 - 1104, 2015/09

In J-PARC linac, ACS (Annular-ring Coupled Structure) has been operating for one and a half years. Through the long term operation, the ACS cavities have been well conditioned. Therefore, the vacuum pressure of the ACS was reduced to 1$$times$$10$$^{-7}$$Pa, which is much lower than the required value, and RF trip rate was steadily decreased. At present, the ACS continues to be stably operating without sacrificing the operating time of the J-PARC accelerator complex. The vacuum leaks caused by the generated crack in the aluminum chain clamps in the ACS beam line have happened five times in the past. To prevent the same situation from occurring, we replaced all the aluminum clamps to the stainless steel clamps. The residual radiation between each ACS cavity is considerably high. It is considered that the CT monitors, which have smaller aperture than that of other instruments in the beam line, contributes to the residual radiation. We are trying to reduce the residual radiation by enlarging the monitor's aperture and by replacing the unused monitors to the titanium ducts in this summer shutdown period.

Journal Articles

The Heat transfer analysis for a new large entry angled scraper for J-PARC Linac

Sugimura, Takashi*; Hirano, Koichiro

Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.954 - 957, 2015/09

The beam power of 1MW is a design specification of J-PARC. Therefore the beam current upgrade to 50 mA in the injector linac is indispensable. The scrapers installed in the linac have been took waste beam out of RFQ since last summer. They consist of Carbon composite surface plates and Copper block with cooling-water channel. The deterioration of thermal conducting has been observed during daily operation. Thus, a newly designed scraper with a large entry angle of 67 $$^{circ}$$ is introduced as countermeasures. This paper reports the results of numeric simulations of the new scrapers and their installation schedule.

Journal Articles

Beam test of a new radio frequency quadrupole linac for the Japan Proton Accelerator Research Complex

Kondo, Yasuhiro; Morishita, Takatoshi; Yamazaki, Saishun; Hori, Toshihiko; Sawabe, Yuki; Chishiro, Etsuji; Fukuda, Shimpei; Hasegawa, Kazuo; Hirano, Koichiro; Kikuzawa, Nobuhiro; et al.

Physical Review Special Topics; Accelerators and Beams, 17(12), p.120101_1 - 120101_8, 2014/12

 Times Cited Count:8 Percentile:47.12(Physics, Nuclear)

We performed a beam test of a new radio frequency quadrupole linac (RFQ III) for the beam current upgrade of the Japan Proton Accelerator Research Complex. First, the conditioning of RFQ III was conducted, and after 20 h of conditioning, RFQ III became very stable with a nominal peak power and duty factor of 400 kW and 1.5%, respectively. An off-line beam test was subsequently conducted before installation in the accelerator tunnel. The transmission, transverse emittance, and energy spread of the 50-mA negative hydrogen beam from RFQ III were measured and compared with simulation results. The experiment and simulation results showed good agreement; therefore, we conclude that the performance of RFQ III conforms to its design.

Journal Articles

Interlock system of beam line for beam current upgrade

Kawane, Yusuke*; Miura, Akihiko; Miyao, Tomoaki*; Hirano, Koichiro; Sugimura, Takashi*; Kato, Yuko; Sawabe, Yuki; Fukuda, Shimpei; Ouchi, Nobuo

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1288 - 1291, 2014/10

In the J-PARC Linac, because an upgrading of a beam current up to 50mA using an RF-driven ion source and a new RFQ Linac cavity is in progress, we have developed a new frontend equipments. In order to protect the scraper against 50 mA, we need to observe the temperature and to avoid the excess heat loading of the scraper surface and to count the irradiated beam particles. We also monitor the beam transmission between the upstream and downstream of the chopper cavity to check the chopping errors using the beam current monitors. We fabricated the interlock system for the temperature, irradiated particle numbers and beam transmission. And we tested them in the test stand with actual beam. This paper describes the interlock system and their test results.

Journal Articles

Present status of J-PARC linac

Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.

Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10

no abstracts in English

116 (Records 1-20 displayed on this page)