Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nguyen, T. H.*; Le Ba, T.*; Tran, C. T.*; Nguyen, T. T.*; Doan, T. T. T.*; Do, V. K.; Watanabe, Masayuki; Pham, Q. M.*; Hoang, S. T.*; Nguyen, D. V.*; et al.
Hydrometallurgy, 213, p.105933_1 - 105933_11, 2022/08
Times Cited Count:9 Percentile:83.6(Metallurgy & Metallurgical Engineering)A continuous counter-current extraction for the selective recovery of thorium (Th) and uranium (U) from the Yen Phu (Vietnam) rare earth concentrate leach solutions was systematically studied. The primary amine N1923 was used as an extractant which was prepared in the isoparaffin IP-2028 diluent. Thorium and uranium were selectively recovered in a hydrometallurgical circuit established by continuous mixer-settler extraction, scrubbing, and back-extraction at the laboratory scale. The desired purity of Th and U can be achieved by managing the volume ratio of organic to aqueous phase (O/A ratio) in the corresponding steps. Highly pure Th and U were recovered from the pregnant back-extraction liquor and the raffinate, respectively, which have satisfactory properties for further processing of the subsequent nuclear materials.
Ideguchi, Eiji*; Kibdi, T.*; Dowie, J. T. H.*; Hoang, T. H.*; Kumar Raju, M.*; Aoi, Nori*; Mitchell, A. J.*; Stuchbery, A. E.*; Shimizu, Noritaka*; Utsuno, Yutaka; et al.
Physical Review Letters, 128(25), p.252501_1 - 252501_6, 2022/06
Times Cited Count:2 Percentile:46.35(Physics, Multidisciplinary)no abstracts in English
Hasegawa, Kunio; Li, Y.; Bezensek, B.*; Hoang, P. H.*; Rathbun, H. J.*
Journal of Pressure Vessel Technology, 138(1), p.011101_1 - 011101_8, 2016/02
Times Cited Count:1 Percentile:8.17(Engineering, Mechanical)Piping components in power plants may experience combined bending and torsion moments during operation. There is a lack of guidance for pipe evaluation for pipes with local wall thinning under the combined bending and torsion moments. ASME Code Section XI Working Group is currently developing fully plastic bending pipe evaluation procedures for pressurized piping components containing local wall thinning subjected to combined torsion and bending moments. Using elastic fully plastic finite element analyses, plastic collapse bending moments under torsion were obtained for 114.3 mm to 609.6 mm diameter pipes with various local wall thinning flaw sizes. The objective of this paper is to introduce an equivalent moment, which combines torsion and bending moments by a vector summation, and to establish the applicable range of wall thinning lengths, angles and depths, where the equivalent moments are equal to pure bending moments.
Hasegawa, Kunio*; Li, Y.; Bezensek, B.*; Hoang, P. H.*; Rathbun, H. J.*
Proceedings of 2014 ASME Pressure Vessels and Piping Conference (PVP 2014) (DVD-ROM), 10 Pages, 2014/07
Piping components in power plants may experience combined bending and torsion moments during operation. There is a lack of guidance for pipe evaluation for pipes with local wall thinning flaws under the combined bending and torsion moments. ASME BPV Code Section XI Working Group is currently developing fully plastic bending pipe evaluation procedures for pressurized piping components containing local wall thinning subjected to combined torsion and bending moments. Using elastic fully plastic finite element analyses, plastic collapse bending moments under torsions were obtained for 4 to 24 inch diameter pipes with various local wall thinning flaw sizes. The objective of this paper is to introduce an equivalent moment, which combines torsion and bending moments by a vector summation, and to establish the applicable range of wall thinning lengths, angles and depths, where the equivalent moments are equal to pure bending moments.
Jacquinot, J.*; Albajar, F.*; Beaumont, B.*; Becoulet, A.*; Bonicelli, T.*; Bora, D.*; Campbell, D.*; Chakraborty, A.*; Darbos, C.*; Decamps, H.*; et al.
Fusion Engineering and Design, 84(2-6), p.125 - 130, 2009/06
Times Cited Count:24 Percentile:82.29(Nuclear Science & Technology)The electron cyclotron (EC), ion cyclotron (IC), neutral beam (NB) and, lower hybrid (LH) systems for ITER have been reviewed in 2007/2008 in light of progress of physics and technology. Although the overall specifications are unchanged, notable changes have been approved. Firstly, the full 73MW should be commissioned and available on a routine basis before the D/T phase. Secondly, the possibility to operate the NB at full power during the hydrogen phase requiring new shine through protection; IC with 2 antennas with increased robustness; 2 MW transmission systems to provide an easier upgrading of the EC power; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognized.
Ideguchi, Eiji*; Kibdi, T.*; Dowie, J. T. H.*; Hoang, T. H.*; Kumar Raju, M.*; Akber, A. A.*; Bignell, L.*; Coombes, B.*; Eriksen, T. K.*; Gerathy, M. S. M.*; et al.
no journal, ,
no abstracts in English