Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nakatani, Takayoshi; Shimizu, Ryo; Tazaki, Makiko; Kimura, Takashi; Hori, Masato
Dai-44-Kai Nihon Kaku Busshitsu Kanri Gakkai Nenji Taikai Kaigi Rombunshu (Internet), 3 Pages, 2023/11
no abstracts in English
Shimizu, Ryo; Nakatani, Takayoshi; Tazaki, Makiko; Kimura, Takashi; Hori, Masato
Dai-44-Kai Nihon Kaku Busshitsu Kanri Gakkai Nenji Taikai Kaigi Rombunshu (Internet), 4 Pages, 2023/11
no abstracts in English
Hori, Masato; Tazaki, Makiko; Shimizu, Ryo; Kimura, Takashi; Nakatani, Takayoshi
Proceedings of INMM & ESARDA Joint Annual Meeting 2023 (Internet), 8 Pages, 2023/05
To improve preparedness of future denuclearization, series of study to achieve effective and efficient denuclearization have been performed in JAEA. As part of this study, this paper focus on dismantlement and verification of potential uranium enrichment facility and potential nuclear material in the uranium enrichment facility, considering (a) peaceful use operation, (b) freeze, (c) disablement, (d) dismantlement, (e) removal from the state as potential options.
Tazaki, Makiko; Nakatani, Takayoshi; Shimizu, Ryo; Kimura, Takashi; Hori, Masato
Dai-43-Kai Nihon Kaku Busshitsu Kanri Gakkai Nenji Taikai Kaigi Rombunshu (Internet), 4 Pages, 2022/11
Denuclearization consists of (1) verification of nuclear activities prior to denuclearization, (2) freeze, disablement and decommissioning of nuclear weapons, nuclear materials such as HEU and Pu, their production facilities, including facilities and equipment, and their verification. In this study, as a premise for the denuclearization of nuclear materials and nuclear facilities, and with reference to the results of previous denuclearization case surveys and related literature, the denuclearization process and its options for technical measures are discussed and considered.
Nakatani, Takayoshi; Shimizu, Ryo; Tazaki, Makiko; Kimura, Takashi; Hori, Masato
Dai-43-Kai Nihon Kaku Busshitsu Kanri Gakkai Nenji Taikai Kaigi Rombunshu (Internet), 4 Pages, 2022/11
Denuclearization is the verification of nuclear development and the freezing, disabling, decommissioning, and verification of nuclear weapons, nuclear materials that can be used for nuclear weapons, and their manufacturing facilities, equipment, equipment, and materials. In this study, the technical process of measures and verification methods to effectively and efficiently achieve denuclearization at nuclear installations is examined and considered from a technical point of view.
Hori, Masato; Tazaki, Makiko; Nakatani, Takayoshi; Shimizu, Ryo; Kimura, Takashi
Dai-43-Kai Nihon Kaku Busshitsu Kanri Gakkai Nenji Taikai Kaigi Rombunshu (Internet), 4 Pages, 2022/11
no abstracts in English
Shimizu, Ryo; Nakatani, Takayoshi; Tazaki, Makiko; Kimura, Takashi; Hori, Masato
Dai-43-Kai Nihon Kaku Busshitsu Kanri Gakkai Nenji Taikai Kaigi Rombunshu (Internet), 3 Pages, 2022/11
no abstracts in English
Kimura, Takashi; Nakatani, Takayoshi; Shimizu, Ryo; Tazaki, Makiko; Hori, Masato
Dai-43-Kai Nihon Kaku Busshitsu Kanri Gakkai Nenji Taikai Kaigi Rombunshu (Internet), 4 Pages, 2022/11
no abstracts in English
Hori, Satoshi*; Kanno, Ryoji*; Kwon, O.*; Kato, Yuki*; Yamada, Takeshi*; Matsuura, Masato*; Yonemura, Masao*; Kamiyama, Takashi*; Shibata, Kaoru; Kawakita, Yukinobu
Journal of Physical Chemistry C, 126(22), p.9518 - 9527, 2022/06
Times Cited Count:10 Percentile:60.23(Chemistry, Physical)Naoi, Yosuke; Hori, Masato; Noro, Naoko
Proceedings of INMM 61st Annual Meeting (Internet), 9 Pages, 2020/07
As a COE of HRD on nuclear non-proliferation and nuclear security in the Asian region, good practices during the nine years since its establishment in 2010 will be presented.
Sasaki, Hirokazu*; Nishikubo, Hideo*; Nishida, Shinsuke*; Yamazaki, Satoshi*; Nakasaki, Ryusuke*; Isomatsu, Takemi*; Minato, Ryuichiro*; Kinugawa, Kohei*; Imamura, Akihiro*; Otomo, Shinya*; et al.
Furukawa Denko Jiho, (138), p.2 - 10, 2019/02
no abstracts in English
Shiba, Tomooki; Tomikawa, Hirofumi; Hori, Masato
Proceedings of IAEA Symposium on International Safeguards; Building Future Safeguards Capabilities (Internet), 6 Pages, 2018/11
Miyaji, Noriko; Vidaurre, J.; Hori, Masato; Rodriguez, P.; Robertson, K.*
Proceedings of IAEA Symposium on International Safeguards; Building Future Safeguards Capabilities (Internet), 5 Pages, 2018/11
Koizumi, Mitsuo; Seya, Michio; Tomikawa, Hirofumi; Hori, Masato; Naoi, Yosuke
Proceedings of INMM 59th Annual Meeting (Internet), 8 Pages, 2018/07
no abstracts in English
Nagatani, Taketeru; Komeda, Masao; Shiba, Tomooki; Nauchi, Yasushi*; Maeda, Makoto; Sagara, Hiroshi*; Kosuge, Yoshihiro*; Kureta, Masatoshi; Tomikawa, Hirofumi; Okumura, Keisuke; et al.
Energy Procedia, 131, p.258 - 263, 2017/12
Times Cited Count:10 Percentile:98.09(Energy & Fuels)Naito, Fujio*; Anami, Shozo*; Ikegami, Kiyoshi*; Uota, Masahiko*; Ouchi, Toshikatsu*; Onishi, Takahiro*; Oba, Toshiyuki*; Obina, Takashi*; Kawamura, Masato*; Kumada, Hiroaki*; et al.
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1244 - 1246, 2016/11
The proton linac installed in the Ibaraki Neutron Medical Research Center is used for production of the intense neutron flux for the Boron Neutron Capture Therapy (BNCT). The linac consists of the 3-MeV RFQ and the 8-MeV DTL. Design average beam current is 10mA. Target is made of Beryllium. First neutron production from the Beryllium target was observed at the end of 2015 with the low intensity beam as a demonstration. After the observation of neutron production, a lot of improvement s was carried out in order to increase the proton beam intensity for the real beam commissioning. The beam commissioning has been started on May 2016. The status of the commissioning is summarized in this report.
Nagatani, Taketeru; Komeda, Masao; Shiba, Tomooki; Maeda, Makoto; Nauchi, Yasushi*; Sagara, Hiroshi*; Kosuge, Yoshihiro*; Kureta, Masatoshi; Tomikawa, Hirofumi; Okumura, Keisuke; et al.
Proceedings of INMM 57th Annual Meeting (Internet), 10 Pages, 2016/07
Uesaka, Mitsuru*; Kobayashi, Hitoshi*; Kureta, Masatoshi; Nakatsuka, Shigehiro*; Nishimura, Kazuya*; Igashira, Masayuki*; Hori, Junichi*; Kiyanagi, Yoshiaki*; Tagi, Kazuhiro*; Seki, Toshichika*; et al.
Reviews of Accelerator Science and Technology, 8, p.181 - 207, 2015/00
We choose nuclear data and nuclear material inspection for energy application and nondestructive testing of explosive and hidden nuclear materials for security application. 90 keV electrostatic accelerators of deuterium are commercially available for nondestructive testing. For nuclear data measurement, electrostatic ion accelerators and L-band and S-band electron linear accelerators (linac) are used for the neutron source. Compact or mobile X-band electron linac neutron sources are under development. Compact proton linac neutron source is used for nondestructive testing especially water in solids. Several efforts for more neutron intensity using proton and deuteron accelerators are also introduced.
Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10
no abstracts in English
Kawamura, Masato*; Chishiro, Etsuji; Hori, Toshihiko; Shinozaki, Shinichi; Sato, Fumiaki; Fukui, Yuji*; Futatsukawa, Kenta*; Yamazaki, Masayoshi*; Sagawa, Ryu*; Miyajima, Noriyuki*; et al.
Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.605 - 607, 2014/06
This report describes the present status of the klystron power supply systems for the J-PARC linac. The systems for the 181 MeV linac were operated from September to May. A few breakdowns were occurred, and are described in this report. The new systems for the upgrade of the linac from 181MeV to 400 MeV have been installed until now, and the 3 HVDCPSs and the 3 anode modulators of the new systems have been operated. All the systems for 400 MeV linac will be operated in this autumn.