Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Fujita, Yoshitaka; Hu, X.*; Takeuchi, Tomoaki; Takeda, Ryoma; Fujihara, Yasuyuki*; Yoshinaga, Hisao*; Hori, Junichi*; Suzuki, Tatsuya*; Suematsu, Hisayuki*; Ide, Hiroshi
KURNS Progress Report 2022, P. 110, 2023/07
no abstracts in English
Fujita, Yoshitaka; Seki, Misaki; Ngo, M. C.*; Do, T. M. D.*; Hu, X.*; Yang, Y.*; Takeuchi, Tomoaki; Nakano, Hiroko; Fujihara, Yasuyuki*; Yoshinaga, Hisao*; et al.
KURNS Progress Report 2021, P. 118, 2022/07
no abstracts in English
Seki, Misaki; Fujita, Yoshitaka; Fujihara, Yasuyuki*; Zhang, J.*; Yoshinaga, Hisao*; Sano, Tadafumi*; Hori, Junichi*; Nagata, Hiroshi; Otsuka, Kaoru; Omori, Takazumi; et al.
Genshiryoku Bakkuendo Kenkyu (CD-ROM), 29(1), p.2 - 9, 2022/06
no abstracts in English
Murase, Kiyoka*; Kataoka, Ryuho*; Nishiyama, Takanori*; Nishimura, Koji*; Hashimoto, Taishi*; Tanaka, Yoshimasa*; Kadokura, Akira*; Tomikawa, Yoshihiro*; Tsutsumi, Masaki*; Ogawa, Yasunobu*; et al.
Journal of Space Weather and Space Climate (Internet), 12, p.18_1 - 18_16, 2022/06
Times Cited Count:0 Percentile:0.01(Astronomy & Astrophysics)We identified two energetic electron precipitation (EEP) events during the growth phase of moderate substorms and estimated the mesospheric ionization rate for an EEP event for which the most comprehensive dataset from ground-based and space-born instruments was available. The mesospheric ionization signature reached below 70 km altitude and continued for ~15 min until the substorm onset, as observed by the PANSY radar and imaging riometer at Syowa Station in the Antarctic region. We also used energetic electron flux observed by the Arase and POES 15 satellites as the input for the air-shower simulation code PHITS to quantitatively estimate the mesospheric ionization rate. Combining the cutting-edge observations and simulations, we shed new light on the space weather impact of the EEP events during geomagnetically quiet times, which is important to understand the possible link between the space environment and climate.
Kondo, Yasuhiro; Hirano, Koichiro; Ito, Takashi; Kikuzawa, Nobuhiro; Kitamura, Ryo; Morishita, Takatoshi; Oguri, Hidetomo; Okoshi, Kiyonori; Shinozaki, Shinichi; Shinto, Katsuhiro; et al.
Journal of Physics; Conference Series, 1350, p.012077_1 - 012077_7, 2019/12
Times Cited Count:1 Percentile:51.21We have upgraded a 3-MeV linac at J-PARC. The ion source is same as the J-PARC linac's, and the old 30-mA RFQ is replaced by a spare 50-mA RFQ, therefore, the beam energy is 3 MeV and the nominal beam current is 50 mA. The main purpose of this system is to test the spare RFQ, but also used for testing of various components required in order to keep the stable operation of the J-PARC accelerator. The accelerator has been already commissioned, and measurement programs have been started. In this paper, present status of this 3-MeV linac is presented.
Kataoka, Ryuho*; Nishiyama, Takanori*; Tanaka, Yoshimasa*; Kadokura, Akira*; Uchida, Herbert Akihito*; Ebihara, Yusuke*; Ejiri, Mitsumu*; Tomikawa, Yoshihiro*; Tsutsumi, Masaki*; Sato, Kaoru*; et al.
Earth, Planets and Space (Internet), 71, p.9_1 - 9_10, 2019/01
Times Cited Count:7 Percentile:39.29(Geosciences, Multidisciplinary)Transient ionization of the mesosphere was detected at around 65 km altitude during the isolated auroral expansion occurred at 2221-2226 UT on June 30, 2017. A general-purpose Monte Carlo particle transport code PHITS suggested that significant ionization is possible in the middle atmosphere due to auroral X-rays from the auroral electrons of 10 keV.
Watanabe, Takashi*; Takeuchi, Tomoaki; Ozawa, Osamu*; Komanome, Hirohisa*; Akahori, Tomoyuki*; Tsuchiya, Kunihiko
Proceedings of 2017 International Image Sensor Workshop (IISW 2017) (Internet), p.206 - 209, 2017/05
no abstracts in English
Kondo, Yasuhiro; Asano, Hiroyuki*; Chishiro, Etsuji; Hirano, Koichiro; Ishiyama, Tatsuya; Ito, Takashi; Kawane, Yusuke; Kikuzawa, Nobuhiro; Meigo, Shinichiro; Miura, Akihiko; et al.
Proceedings of 28th International Linear Accelerator Conference (LINAC 2016) (Internet), p.298 - 300, 2017/05
We have constructed a linac for development of various accelerator components at J-PARC. The ion source is same as the J-PARC linac's, and the RFQ is a used one in the J-PARC linac. The beam energy is 3 MeV and nominal beam current is 30 mA. The accelerator has been already commissioned, and the first development program, laser-charge-exchange experiment for the transmutation experimental facility, has been started. In this paper, present status of this 3-MeV linac is presented.
Hirano, Koichiro; Asano, Hiroyuki; Ishiyama, Tatsuya; Ito, Takashi; Okoshi, Kiyonori; Oguri, Hidetomo; Kondo, Yasuhiro; Kawane, Yusuke; Kikuzawa, Nobuhiro; Sato, Yoshikatsu; et al.
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.310 - 313, 2016/11
We have used a beam scraper with the incident angle of 65deg to reduce the beam power deposition density in the MEBT between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC linac. The 65 scraper was irradiated by the H
beam up to particle number of 1.47E22. We observed a lot of surface projections with several hundred micrometers high in the beam irradiation damage on the scraper by using the laser microscope. In order to study the limits of scrapers, we constructed a new 3 MeV linac at J-PARC. We will conduct the scraper irradiation test at the end of this year.
Kondo, Yasuhiro; Morishita, Takatoshi; Yamazaki, Saishun; Hori, Toshihiko; Sawabe, Yuki; Chishiro, Etsuji; Fukuda, Shimpei; Hasegawa, Kazuo; Hirano, Koichiro; Kikuzawa, Nobuhiro; et al.
Physical Review Special Topics; Accelerators and Beams, 17(12), p.120101_1 - 120101_8, 2014/12
Times Cited Count:6 Percentile:43.85(Physics, Nuclear)We performed a beam test of a new radio frequency quadrupole linac (RFQ III) for the beam current upgrade of the Japan Proton Accelerator Research Complex. First, the conditioning of RFQ III was conducted, and after 20 h of conditioning, RFQ III became very stable with a nominal peak power and duty factor of 400 kW and 1.5%, respectively. An off-line beam test was subsequently conducted before installation in the accelerator tunnel. The transmission, transverse emittance, and energy spread of the 50-mA negative hydrogen beam from RFQ III were measured and compared with simulation results. The experiment and simulation results showed good agreement; therefore, we conclude that the performance of RFQ III conforms to its design.
Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10
no abstracts in English
Futatsukawa, Kenta*; Ikegami, Masanori*; Ito, Yuichi; Kikuzawa, Nobuhiro; Sato, Fumiaki; Shinozaki, Shinichi; Suzuki, Takahiro*; Chishiro, Etsuji; Hirano, Koichiro; Fang, Z.*; et al.
Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1149 - 1153, 2014/06
no abstracts in English
Mitsuda, Tomoaki*; Kobayashi, Ippei*; Kosugi, Shinya*; Fujita, Naoki*; Saito, Yuichi; Hori, Fuminobu*; Semboshi, Satoshi*; Kaneno, Yasuyuki*; Nishida, Kenji*; Soneda, Naoki*; et al.
Nuclear Instruments and Methods in Physics Research B, 272, p.49 - 52, 2012/02
Times Cited Count:7 Percentile:49.32(Instruments & Instrumentation)Mitsuda, Tomoaki*; Kobayashi, Ippei*; Kosugi, Shinya*; Fujita, Naoki*; Saito, Yuichi; Hori, Fuminobu*; Semboshi, Satoshi*; Kaneno, Yasuyuki*; Nishida, Kenji*; Soneda, Naoki*; et al.
Journal of Nuclear Materials, 408(2), p.201 - 204, 2011/01
Times Cited Count:11 Percentile:64.98(Materials Science, Multidisciplinary)Konomura, Mamoru; Ogawa, Takashi; Okano, Yasushi; Yamaguchi, Hiroyuki; Murakami, Tsutomu; Takaki, Naoyuki; Nishiguchi, Youhei; Sugino, Kazuteru; Naganuma, Masayuki; Hishida, Masahiko; et al.
JNC TN9400 2004-035, 2071 Pages, 2004/06
The attractive concepts for Sodium-, lead-bismuth-, helium- and water-cooled FBRs have been created through using typical plant features and employing advanced technologies. Efforts on evaluating technological prospects of feasibility have been paid for these concepts. Also, it was comfirmed if these concepts satisfy design requierments of capability and performance presumed in the feasibilty study on commertialization of Fast Breeder Reactor Systems. As results, it was concluded that the selection of sodium-cooled reactor was most rational for practical use of FBR technologies in 2015.
Fujita, Yoshitaka; Seki, Misaki; Fujihara, Yasuyuki*; Suzuki, Tatsuya*; Yoshinaga, Hisao*; Takeuchi, Tomoaki; Nakano, Hiroko; Hori, Junichi*; Suematsu, Hisayuki*; Ide, Hiroshi
no journal, ,
no abstracts in English