Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Tamura, Fumihiko; Okita, Hidefumi; Hotchi, Hideaki*; Saha, P. K.; Meigo, Shinichiro; Yoshii, Masahito*; Omori, Chihiro*; Yamamoto, Masanobu; Seiya, Kiyomi*; Sugiyama, Yasuyuki*; et al.
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.64 - 68, 2023/11
The J-PARC 3GeV synchrotron (RCS) provides high intensity proton beams to the Materials and Life Science Experimental Facility (MLF) and the Main Ring (MR). The harmonic number (h) of the RCS is 2 and the RCS normally accelerates two bunches. For some experiments at the MLF, a single bunch is preferred. In this case, one of the rf bucket is filled with protons and the other is empty. Therefore the beam intensity is halved. If the RCS can accelerate with h=1, the intensity per bunch can be doubled, enabling to provide single bunch beams to the MLF with the maximum intensity. This possibly increases the MR beam power by injecting high intensity single bunches eight times. In this presentation, we report mainly on the consideration of h=1 acceleration in the RCS by longitudinal simulations.
Saha, P. K.; Harada, Hiroyuki; Okabe, Kota; Okita, Hidefumi; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yoshimoto, Masahiro; Hotchi, Hideaki*
Proceedings of 68th ICFA Advanced Beam Dynamics Workshop on High Intensity and High Brightness Hadron Beams (HB2023) (Internet), p.147 - 152, 2023/10
Yamamoto, Kazami; Moriya, Katsuhiro; Okita, Hidefumi; Yamada, Ippei; Chimura, Motoki; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Masanobu; Morishita, Takatoshi; et al.
Proceedings of 68th ICFA Advanced Beam Dynamics Workshop on High Intensity and High Brightness Hadron Beams (HB2023) (Internet), p.270 - 273, 2023/10
The 3-GeV rapid-cycling synchrotron at the Japan Pro-ton Accelerator Research Complex was designed to provide 1-MW proton beams to the following facilities. Thanks to the improvement works of the accelerator system, we successfully accelerate 1-MW beam with quite small beam loss. Currently, the beam power of RCS is limited by the lack of anode current in the RF cavity system rather than the beam loss. Recently we developed a new acceleration cavity that can accelerate a beam with less anode current. This new cavity enables us not only to reduce requirement of the anode power supply but also to accelerate more than 1-MW beam. We have started to consider the way to achieve beyond 1-MW beam acceleration. So far, it is expected that up to 1.5-MW beam can be accelerated after replacement of the RF cavity. We have also continued study to achieve more than 2 MW beam in J-PARC RCS.
Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Yoshimoto, Masahiro; Hotchi, Hideaki*
Journal of Physics; Conference Series, 2420, p.012040_1 - 012040_7, 2023/01
Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Yoshimoto, Masahiro; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Hatakeyama, Shuichiro; Moriya, Katsuhiro; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1 - 5, 2023/01
Yamamoto, Kazami; Kinsho, Michikazu; Hayashi, Naoki; Saha, P. K.; Tamura, Fumihiko; Yamamoto, Masanobu; Tani, Norio; Takayanagi, Tomohiro; Kamiya, Junichiro; Shobuda, Yoshihiro; et al.
Journal of Nuclear Science and Technology, 59(9), p.1174 - 1205, 2022/09
Times Cited Count:7 Percentile:72.25(Nuclear Science & Technology)In the Japan Proton Accelerator Research Complex, the purpose of the 3 GeV rapid cycling synchrotron (RCS) is to accelerate a 1 MW, high-intensity proton beam. To achieve beam operation at a repetition rate of 25 Hz at high intensities, the RCS was elaborately designed. After starting the RCS operation, we carefully verified the validity of its design and made certain improvements to establish a reliable operation at higher power as possible. Consequently, we demonstrated beam operation at a high power, namely, 1 MW. We then summarized the design, actual performance, and improvements of the RCS to achieve a 1 MW beam.
Saha, P. K.; Yoshimoto, Masahiro; Okabe, Kota; Harada, Hiroyuki; Tamura, Fumihiko; Hotchi, Hideaki*
Proceedings of 12th International Particle Accelerator Conference (IPAC 21) (Internet), p.590 - 593, 2021/08
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
JPS Conference Proceedings (Internet), 33, p.011018_1 - 011018_6, 2021/03
no abstracts in English
Tamura, Fumihiko; Yamamoto, Masanobu; Yoshii, Masahito*; Sugiyama, Yasuyuki*; Hotchi, Hideaki; Saha, P. K.; Yoshimoto, Masahiro; Harada, Hiroyuki
JPS Conference Proceedings (Internet), 33, p.011021_1 - 011021_6, 2021/03
Chopped beam injection is employed in the J-PARC RCS to avoid the longitudinal beam losses. A fast beam chopper is installed in the MEBT section of the linac. The chopper is driven by the gate pulses sent from the LLRF control system of the RCS. The delay from the zero crossing of the RCS rf and the width are set so that the beam pulse is injected into the proper phase position of the rf bucket. A unique feature of the J-PARC chopper gate pulse generation is thinning of the pulses. The thinning is useful to control the beam intensity without changing much the condition of the longitudinal painting. Also, the beam macro pulse can be trimmed down to a single intermediate pulse by setting the parameters. In this poster, we present the overview of the generation of the chopper gate pulse in the LLRF control system and various beam commissioning results utilizing the flexibility of it. Also, we discuss the upgrade of the chopper gate pulse generation.
Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Yoshimoto, Masahiro; et al.
Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.209 - 213, 2020/09
The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, just before the summer shutdown period, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. First trial was 1-hour continuous operation in July 2018, and second trial was 10-hours continuous in July 2019. In both cases, we achieved almost stable operation. Furthermore, in June 2020, we tried to operate continuously for over 40 hours. But in this case, some trouble occurred and the operation was frequently suspended. Through these continuous operation trials, we have identified issues for stable operation of 1 MW. In this presentation, we will report the results of 1-MW continuous operation and issues obtained from these results.
Saha, P. K.; Yoshimoto, Masahiro; Hatakeyama, Shuichiro; Hotchi, Hideaki; Harada, Hiroyuki; Tamura, Fumihiko; Yamamoto, Kazami; Yamazaki, Yoshio; Kinsho, Michikazu; Irie, Yoshiro*
Physical Review Accelerators and Beams (Internet), 23(8), p.082801_1 - 082801_13, 2020/08
Times Cited Count:4 Percentile:40.64(Physics, Nuclear)Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
Journal of Instrumentation (Internet), 15(7), p.P07022_1 - P07022_16, 2020/07
Times Cited Count:4 Percentile:18.10(Instruments & Instrumentation)no abstracts in English
Hotchi, Hideaki
Physical Review Accelerators and Beams (Internet), 23(5), p.050401_1 - 050401_13, 2020/05
Times Cited Count:10 Percentile:64.40(Physics, Nuclear)no abstracts in English
Hotchi, Hideaki; Harada, Hiroyuki; Takayanagi, Tomohiro
Journal of Physics; Conference Series, 1350, p.012102_1 - 012102_5, 2019/11
Times Cited Count:1 Percentile:49.48(Physics, Particles & Fields)Hotchi, Hideaki; Harada, Hiroyuki; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yoshimoto, Masahiro
Kasokuki, 16(2), p.109 - 118, 2019/07
no abstracts in English
Hotchi, Hideaki; Harada, Hiroyuki; Hayashi, Naoki; Kinsho, Michikazu; Okabe, Kota; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yamamoto, Masanobu; et al.
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.574 - 578, 2019/07
no abstracts in English
Hotchi, Hideaki
FAS Dayori (Internet), (18), p.20 - 26, 2019/06
no abstracts in English
Saha, P. K.; Hotchi, Hideaki; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Watanabe, Yasuhiro; Takayanagi, Tomohiro
Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.171 - 173, 2019/06
Hotchi, Hideaki; Harada, Hiroyuki; Takayanagi, Tomohiro
Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.2009 - 2012, 2019/06
Hotchi, Hideaki; Harada, Hiroyuki
Proceedings of 15th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.371 - 375, 2018/08
no abstracts in English