Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Watanabe, Kaho; Nishiyama, Yutaka; Imahashi, Masaki; Taguchi, Yuji; Iitsuka, Yoshinobu; Ouchi, Takuya; Inoue, Shuichi; Kozawa, Takayuki; Nemoto, Takahiro; Sugaya, Takashi; et al.
JAEA-Testing 2025-001, 56 Pages, 2025/11
There is an emergency response team against 7 nuclear facilities (JRR-3 in Nuclear Science Research Institute, Tokai Reprocessing Plant (TRP) in Nuclear Fuel Cycle Engineering Laboratories, JMTR, HTTR and Joyo in Oarai Research and Development Institute, Prototype Fast Breeder Reactor Monju, Fugen Decommissioning Engineering Center) accidents of Japan Atomic Energy Agency (JAEA). The team is in Naraha Center for Remote Control Technology Development (NARREC). On site surveys which are about the situations and the access entering route of the 7 site emergencies were conducted by the team in 2021. And the results of the surveys made the team get two Spot (quadrupedal robots) in 2022. This is because the team thought using Spot gave operators the less exposure than using crawler robots which had been belonged to the team. After that it was confirmed that the Spot have the ability to respond to the emergency on the route of each facility in 2023. This report shows the results of the Spot's run function (= shooting videos, running oversteps, running up and down stairs, and so on) confirmation about 6 facilities (JRR-3, JMTR, HTTR, Joyo, Monju and Fugen).
Fukushima, Manabu; Owada, Minoru; Ota, Kazunori; Takeuchi, Masaki; Goto, Shingo; Imahashi, Masaki; Terakado, Yoshibumi
JAEA-Technology 2010-028, 24 Pages, 2010/09
The cooling tower of the JRR-3's secondary cooling system is used to emit the heat from the core into the atmosphere. The appropriate maintenance of the cooling tower has helped the safe and stable reactor operation. Temperature of the secondary coolant had controlled constantly by changing the number of cooling fans. But, just after the number of fans changed, the temperature changed transiently and consequently the reactor thermal power changed. In order to amend this some weakness, the control system has improved to change the speed of fans constantly. The maintenance and improvement activities with the records of inspection are compiled to be utilized for future work.
Ota, Kazunori; Ikekame, Yoshinori; Owada, Minoru; Fukushima, Manabu; Oba, Toshinobu; Takeuchi, Masaki; Imahashi, Masaki; Murayama, Yoji
JAEA-Technology 2008-023, 31 Pages, 2008/03
JRR-3 uses shell and tube heat exchangers. The secondary coolant flushes into the tubes and the primary coolant flows outside of the tubes. The heat exchangers are cleaned with the ball-cleaning method, which is a method to clean inside of the tubes by passing the sponge balls with secondary coolant. Decline in the performance of heat exchanger could rise temperature of the primary coolant and then influence the safe and stable reactor operation. The effective way of ball-cleaning for JRR-3 heat exchangers is examined based on past cleaning data. The results show the optimal ball size and the way to determine the cleaning time.
Ishizaki, Katsuhiko; Ota, Kazunori; Takeuchi, Masaki; Imahashi, Masaki; Fukushima, Manabu
no journal, ,
no abstracts in English
Imahashi, Masaki; Oba, Toshinobu; Oki, Keiichi; Suzuki, Makoto; Hayashi, Kazuhiko
no journal, ,
no abstracts in English