Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Fuwa, Yasuhiro; Shinozaki, Shinichi; Chishiro, Etsuji; Hirane, Tatsuya; Fang, Z.*; Fukui, Yuji*; Futatsukawa, Kenta*; Mizobata, Satoshi*; Iwama, Yuhei*; Sato, Yoshikatsu*; et al.
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.611 - 613, 2019/10
In the J-PARC linac, a proton accelerator is operated using 45 units of 324 MHz and 972 MHz klystrons. In the future stabilization and advancement of the accelerator, it is important to acquire the klystron output characteristics near the maximum output accurately. In order to understand this characteristics, measurement of the characteristics of the replaced klystron for some reason such as discharge, as well as the new klystron. However, such measurements have not been performed because of the risk of damage including peripheral equipment due to discharge and the temporal interference with the operation of the accelerator. Therefore, we set up a klystron test stand in the linac building and measured the high-voltage characteristics and input/output characteristics of the klystron under various operating parameters. By using this measurement result, the characteristics of klystron can be obtained before installation, and it becomes possible to determine the optimum operation parameters and make effective plan of klystron replacements. In addition, basic data for predicting the degradation tendency of klystron was acquired by comparing the characteristics of the used and used klystron.
Kondo, Yasuhiro; Asano, Hiroyuki*; Chishiro, Etsuji; Hirano, Koichiro; Ishiyama, Tatsuya; Ito, Takashi; Kawane, Yusuke; Kikuzawa, Nobuhiro; Meigo, Shinichiro; Miura, Akihiko; et al.
Proceedings of 28th International Linear Accelerator Conference (LINAC 2016) (Internet), p.298 - 300, 2017/05
We have constructed a linac for development of various accelerator components at J-PARC. The ion source is same as the J-PARC linac's, and the RFQ is a used one in the J-PARC linac. The beam energy is 3 MeV and nominal beam current is 30 mA. The accelerator has been already commissioned, and the first development program, laser-charge-exchange experiment for the transmutation experimental facility, has been started. In this paper, present status of this 3-MeV linac is presented.
Hirano, Koichiro; Asano, Hiroyuki; Ishiyama, Tatsuya; Ito, Takashi; Okoshi, Kiyonori; Oguri, Hidetomo; Kondo, Yasuhiro; Kawane, Yusuke; Kikuzawa, Nobuhiro; Sato, Yoshikatsu; et al.
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.310 - 313, 2016/11
We have used a beam scraper with the incident angle of 65deg to reduce the beam power deposition density in the MEBT between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC linac. The 65 scraper was irradiated by the H beam up to particle number of 1.47E22. We observed a lot of surface projections with several hundred micrometers high in the beam irradiation damage on the scraper by using the laser microscope. In order to study the limits of scrapers, we constructed a new 3 MeV linac at J-PARC. We will conduct the scraper irradiation test at the end of this year.
Wakai, Eiichi; Kondo, Hiroo; Kanemura, Takuji; Furukawa, Tomohiro; Hirakawa, Yasushi; Watanabe, Kazuyoshi; Ida, Mizuho*; Ito, Yuzuru; Niitsuma, Shigeto; Edao, Yuki; et al.
Fusion Science and Technology, 66(1), p.46 - 56, 2014/07
Times Cited Count:4 Percentile:30.92(Nuclear Science & Technology)Okumura, Susumu; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; Yuri, Yosuke; Nara, Takayuki; et al.
JAEA-Review 2012-046, JAEA Takasaki Annual Report 2011, P. 172, 2013/01
The AVF cyclotron was operated from May 9th in fiscal 2011 and all the planned experiments on April were cancelled due to scheduled blackouts originated from the Great East Japan Earthquake. The total operation time amounted to 3,038.4 hours. The extended operation from Friday evening to Saturday evening was carried out eight times in order to supply the cancellation on April. The regular yearly overhaul and maintenance were carried out.
Wakai, Eiichi; Kondo, Hiroo; Sugimoto, Masayoshi; Fukada, Satoshi*; Yagi, Juro*; Ida, Mizuho; Kanemura, Takuji; Furukawa, Tomohiro; Hirakawa, Yasushi; Watanabe, Kazuyoshi; et al.
Purazuma, Kaku Yugo Gakkai-Shi, 88(12), p.691 - 705, 2012/12
no abstracts in English
Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; Yuri, Yosuke; et al.
JAEA-Review 2011-043, JAEA Takasaki Annual Report 2010, P. 172, 2012/01
no abstracts in English
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Nakamura, Kazuyuki; Ida, Mizuho; Watanabe, Kazuyoshi; Kanemura, Takuji; Wakai, Eiichi; Horiike, Hiroshi*; Yamaoka, Nobuo*; et al.
Nuclear Fusion, 51(12), p.123008_1 - 123008_12, 2011/12
Times Cited Count:39 Percentile:82.4(Physics, Fluids & Plasmas)The Engineering Validation and Engineering Design Activity (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF) is proceeded as one of the ITER Broader Approach (BA) activities. The EVEDA Li test loop (ELTL) is aimed at validating stability of the Li target and feasibility of a Li purification system as the key issues. In this paper, the design of the ELTL especially of a target assembly in which the Li target is produced by the contraction nozzle is presented.
Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; Yuri, Yosuke; et al.
JAEA-Review 2010-065, JAEA Takasaki Annual Report 2009, P. 180, 2011/01
no abstracts in English
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Nakamura, Hiroo*; Ida, Mizuho; Watanabe, Kazuyoshi; Miyashita, Makoto*; Horiike, Hiroshi*; Yamaoka, Nobuo*; Kanemura, Takuji; et al.
Proceedings of 23rd IAEA Fusion Energy Conference (FEC 2010) (CD-ROM), 8 Pages, 2010/10
The Engineering Validation and Engineering Design Activity (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF) is proceeded as one of the ITER Broader Approach (BA) activities. The EVEDA Li test loop (ELTL) is aimed at validating stability of the Li target and feasibility of a Li purification system as the key issues. In this paper, the design of the ELTL especially of a target assembly in which the Li target is produced by the contraction nozzle is presented.
Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; Yuri, Yosuke; et al.
JAEA-Review 2008-055, JAEA Takasaki Annual Report 2007, P. 190, 2008/11
no abstracts in English
Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; et al.
JAEA-Review 2007-060, JAEA Takasaki Annual Report 2006, P. 204, 2008/03
no abstracts in English
Yuyama, Takahiro; Nara, Takayuki; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Ishizaka, Tomohisa; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; Yuri, Yosuke; et al.
Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.259 - 261, 2008/00
no abstracts in English
Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; Yuri, Yosuke; Yokota, Wataru; et al.
JAEA-Review 2006-042, JAEA Takasaki Annual Report 2005, P. 196, 2007/02
no abstracts in English
Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Fukuda, Mitsuhiro; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; Nakamura, Yoshiteru; et al.
JAEA-Review 2005-001, TIARA Annual Report 2004, P. 370, 2006/01
no abstracts in English
Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Fukuda, Mitsuhiro; Okumura, Susumu; Miyawaki, Nobumasa; Nakamura, Yoshiteru; Akaiwa, Katsuhiro*; et al.
Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.209 - 211, 2004/08
no abstracts in English
Nakamura, Yoshiteru; Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Tamura, Hiroyuki; Kurashima, Satoshi; Yokota, Wataru; Okumura, Susumu; Fukuda, Mitsuhiro; Akaiwa, Katsuhiro*; et al.
Proceedings of 13th Symposium on Accelerator Science and Technology, p.193 - 195, 2001/00
The AVF cyclotron system at JAERI Takasaki has been smoothly operated without serious troubles since the first beam extraction in March, 1991. A yearly operation time is about 3200 hours on an average for recent eight years. In last two years, we performed some improvements and developments as followings: stabilization of the cyclotron beam by addition on an exclusive cooling system, designing and investigation of the flat-top system using fifth-harmonic RF, reconstruction of the rotary shutter for radiation shielding and reinforcement of the magnetic channel and its power supply. Furthermore, the renewal of main circulation pump for cooling system, replacement of shunt resistor in the power supplies and re-alignment of the several magnets along the trunk beam transport line were also carried out.
Agematsu, Takashi; Arakawa, Kazuo; Ishiro, Satoshi*
JAERI-Review 99-025, TIARA Annual Report 1998, p.257 - 258, 1999/10
no abstracts in English
Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yokota, Wataru; Fukuda, Mitsuhiro*; Okumura, Susumu; Miyawaki, Nobumasa; Kashiwagi, Hirotsugu; et al.
no journal, ,
no abstracts in English
Nara, Takayuki; Agematsu, Takashi; Ishibori, Ikuo; Kurashima, Satoshi; Yoshida, Kenichi; Yuyama, Takahiro; Ishizaka, Tomohisa; Yokota, Wataru; Okumura, Susumu; Miyawaki, Nobumasa; et al.
no journal, ,
no abstracts in English