Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Proton chelating ligands drive improved chemical separations for rhodium

Narita, Hirokazu*; Nicolson, R. M.*; Motokawa, Ryuhei; Ito, Fumiyuki*; Morisaku, Kazuko*; Goto, Midori*; Tanaka, Mikiya*; Heller, W. T.*; Shiwaku, Hideaki; Yaita, Tsuyoshi; et al.

Inorganic Chemistry, 58(13), p.8720 - 8734, 2019/07

 Times Cited Count:14 Percentile:69.69(Chemistry, Inorganic & Nuclear)

JAEA Reports

Environmental research for Horonobe Underground Research Project (Contract research)

Ichiyasu, Kenji; Ueda, Noritaka*; Ito, Takahisa*; Nakadate, Fumiyuki*; Yamakoshi, Chizuru*

JAEA-Research 2006-041, 71 Pages, 2006/06

JAEA-Research-2006-041.pdf:10.97MB

Since a development scale of Horonobe Underground Research Project is small, this research would permit under the Environmental Impact Assessment Low and the Basic Environment Ordinance of Hokkaido Prefecture. However, because of consideration of recent general social trends, environmental monitoring research was carried out to know this influence. Noise and vibration measurement was conducted at four points around the research area. Water quality measurement was conducted at two points. Fisheries research was conducted throughout the river. Plant community research according to the Blaun-Blanquet technique (1964) was conducted at two points in the area where rectangular divisions (quadrate) were set. And also, growing condition survey on Hai-dojoh-tsunagi was conducted. This Hai-dojoh-tsunagi is regarded as endangered species in Hokkaido, had been transplanted as an environment protection measure in 2003. In addition, the research places and the methods were made to be the same as that of the past (2004 and 2005) researches. From these results, the influence on the environment after construction and the progress after conduction of measure for protecting environment were checked. Consequently, the influence of construction was not found at present time. Therefore the measure was judged enough to protect environment. After this construction, the environmental monitoring research should be carrying out to check the influence and it would be necessary to conduct the quick and suitable measure to avoid or mitigate the influence.

JAEA Reports

Environmental research For Horonobe Deep Underground Research Project

Ueda, Noritaka*; Ito, Takahisa*; Nakadate, Fumiyuki*; Fujita, Rei*

JNC TJ5420 2004-006, 64 Pages, 2005/03

JNC-TJ5420-2004-006.pdf:10.73MB

Since a development scale of Horonobe Deep Underground Research is small, this research would permit under the Environmental Impact Assessment Low and the Basic Environment Ordinance of Hokkaido Prefecture. However, because of consideration of recent general social trends, environmental monitoring research was carried out to know this influence.Noise and vibration measurement was conducted at four points around the research area. Water quality measurement was conducted at two points (upper and lower region of Shimizusawa river flowing through the area). Fisheries research was conducted throughout the river and resulted in finding 8 species (including 6 species regarded as endangered). Plant community research according to the Blaun-Blanquet technique (1964) was conducted at two points in the area where rectangular divisions (quadrate) were set.And also, growing condition survey on Hai-dozyoh-tsunagi (Torreyochloa viridis) was conducted. This Hai-dozyoh-tsunagi is regarded as endangered species in Hokkaido, had been transplanted as an environment protection measure in 2003. From these results, the influence on the environment after construction and the progress after conduction of measure for protecting environment were checked. Consequently, the influence of construction was not found at present time. Therefore the measure was judged enough to protect environment.After this construction, the environmental monitoring research should be carrying out to check the influence and it would be necessary to conduct the quick and suitable measure to avoid or mitigate the influence.

JAEA Reports

None

Ueda, Noritaka*; Yoneda, Yutaka*; Nakadate, Fumiyuki*; Ito, Takahisa*; Murakami, Tomoko*

JNC TJ5420 2003-001, 120 Pages, 2004/03

JNC-TJ5420-2003-001.pdf:10.38MB

4 (Records 1-4 displayed on this page)
  • 1