Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Data acquisition system of 324MHz klystron test stand at J-PARC linac

Fukui, Yuji*; Anami, Shozo*; Yamaguchi, Seiya*; Fang, Z.*; Kawamura, Masato*; Nammo, Kesao*; Mikawa, Masahiko*; Kadokura, Eiichi*; Suzuki, Hiroyuki; Hori, Toshihiko; et al.

Proceedings of 3rd Annual Meeting of Particle Accelerator Society of Japan and 31st Linear Accelerator Meeting in Japan (CD-ROM), p.403 - 405, 2006/00

The J-PARC (Japan Proton Accelerator Research Complex) Linac consists of RFQ, DTL1-3 and SDTL1-15, and they are driven by 324 MHz klystron. To install the 324 MHz klystron in each cavity appropriately, we measured the RF characteristic of klystron, and acquired various parameters by klystron high power examination at test station. In this paper, we will describe the data acquisition system used by this examination.

Journal Articles

Status of RF system for the J-PARC linac

Chishiro, Etsuji; Hori, Toshihiko*; Kobayashi, Tetsuya; Suzuki, Hiroyuki*; Suganuma, Kazuaki; Yamazaki, Masayoshi*; Anami, Shozo*; Fang, Z.*; Fukuda, Shigeki*; Fukui, Yuji*; et al.

Proceedings of 2nd Annual Meeting of Particle Accelerator Society of Japan and 30th Linear Accelerator Meeting in Japan, p.236 - 238, 2005/07

no abstracts in English

Journal Articles

Characteristics of low level RF system for DTL1 beam commissioning of J-PARC linac

Kobayashi, Tetsuya; Suzuki, Hiroyuki*; Anami, Shozo*; Yamaguchi, Seiya*; Kawamura, Masato*; Fukui, Yuji*; Kadokura, Eiichi*; Kamikubota, Norihiko*; Takagi, Makoto*; Yoshida, Susumu*; et al.

Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.314 - 316, 2004/08

The beam study of the low-energy front of J-PARC linac has been in progress in the KEK site. Last year, DTL1 (the first tank of three DTL's) was installed in addition to RFQ and the Medium Energy Beam Transport line, and the beam commissioning up to 20MeV has been performed successfully. In this paper, the low level RF (LLRF) System for this beam test is summarized and the performance of the RF feed back control system and monitor system of the phase and amplitude of the accelerating fields (324 MHz) is presented. It was found that the feed back system for Bunchers is also necessary to stabilize and to compensate for the beam induced fields.

3 (Records 1-3 displayed on this page)
  • 1