Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Handling of HTTR second driver fuel elements in assembling and storage working

Tomimoto, Hiroshi; Kato, Yasushi; Owada, Hiroyuki; Sato, Nao; Shimazaki, Yosuke; Kozawa, Takayuki; Shinohara, Masanori; Hamamoto, Shimpei; Tochio, Daisuke; Nojiri, Naoki; et al.

JAEA-Technology 2009-025, 29 Pages, 2009/06

JAEA-Technology-2009-025.pdf:21.78MB

The first driver fuel of the HTTR (High Temperature Engineering test Reactor) was loaded in 1998 and the HTTR reached first criticality state in the same year. The HTTR has been operated using the first driver fuel for a decade. In Fuel elements assembling, 4770 of fuel rods which consist of 12 kinds of enrichment uranium are loaded into 150 fuel graphite blocks for HTTR second driver fuel elements. Measures of prevention of fuel rod miss loading, are employed in fuel design. Additionally, precaution of fuel handling on assembling are considered. Reception of fuel rods, assembling of fuel elements and storage of second driver fuels in the fresh fuel storage rack in the HTTR were started since June, 2008. Assembling, storage and pre-service inspection were divided into three parts. The second driver fuel assembling was completed in September, 2008. This report describes concerns of fuel handling on assembling and storage work for the HTTR fuel elements.

Journal Articles

None

Ojima, Hisao; Hayashi, Shotaro; Kawano, Takayuki

Nihon Genshiryoku Gakkai-Shi, 31(11), 1273 Pages, 1989/11

 Times Cited Count:0 Percentile:0.01(Nuclear Science & Technology)

Journal Articles

None

Kawano, Takayuki; *; *

Kinzoku, 50(12), p.43 - 48, 1980/12

Oral presentation

Preparation for ITER CS conductor fabrication

Hamada, Kazuya; Nunoya, Yoshihiko; Takahashi, Yoshikazu; Isono, Takaaki; Nabara, Yoshihiro; Hemmi, Tsutomu; Matsui, Kunihiro; Kawano, Katsumi; Ebisawa, Noboru; Oshikiri, Masayuki; et al.

no journal, , 

The ITER Central Solenoid (CS) conductor is composed of 576 Nb$$_{3}$$Sn superconducting strands and 288 Cu strands assembled together into a multistage cable and protected by a circle-in-square jacket with the outer dimension of 49 mm $$times$$ 49 mm. In R&D to prepare for the ITER CS conductor manufacturing, full size conductor performance test and jacket welding test and mechanical tests have been performed. In the presentation, the R&D activities are presented, showing that as a result of this R&D, the CS conductor manufacturing technologies have been confirmed to start the procurement of the CS conductor.

4 (Records 1-4 displayed on this page)
  • 1