Refine your search:     
Report No.
 - 
Search Results: Records 1-20 displayed on this page of 36

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

The Muon linac project at J-PARC

Kondo, Yasuhiro; Kitamura, Ryo; Fuwa, Yasuhiro; Morishita, Takatoshi; Moriya, Katsuhiro; Takayanagi, Tomohiro; Otani, Masashi*; Cicek, E.*; Ego, Hiroyasu*; Fukao, Yoshinori*; et al.

Proceedings of 31st International Linear Accelerator Conference (LINAC 2022) (Internet), p.636 - 641, 2022/09

The muon linac project for the precise measurement of the muon anomalous magnetic and electric dipole moments, which is currently one of the hottest issues of the elementary particle physics, is in progress at J-PARC. The muons from the J-PARC muon facility are once cooled to room temperature, then accelerated up to 212 MeV with a normalized emittance of 1.5 $$pi$$ mm mrad and a momentum spread of 0.1%. Four types of accelerating structures are adopted to obtain the efficient acceleration with a wide beta range from 0.01 to 0.94. The project is moving into the construction phase. We already demonstrated the re-acceleration scheme of the decelerated muons using a 324-MHz RFQ in 2017. The high-power test of the 324-MHz Interdigital H-mode (IH) DTL using a prototype cavity was performed in 2021. The fabrication of the first module of 14 modules of the 1296-MHz Disk and Washer (DAW) CCL will be done to confirm the production process. Moreover, the final design of the travelling wave accelerating structure for the high beta region is also proceeding. In this paper, the recent progress toward the realization of the world first muon linac will be presented.

Journal Articles

Development of a bunch-width monitor for low-intensity muon beam below a few MeV

Sue, Yuki*; Yotsuzuka, Mai*; Futatsukawa, Kenta*; Hasegawa, Kazuo; Iijima, Toru*; Iinuma, Hiromi*; Inami, Kenji*; Ishida, Katsuhiko*; Kawamura, Naritoshi*; Kitamura, Ryo; et al.

Physical Review Accelerators and Beams (Internet), 23(2), p.022804_1 - 022804_7, 2020/02

 Times Cited Count:2 Percentile:20.86(Physics, Nuclear)

A destructive monitor to measure the longitudinal bunch width of a low-energy and low-intensity muon beam was developed. This bunch-width monitor (BWM) employed microchannel plates to detect a single muon with high time resolution. In addition, constant-fraction discriminators were adopted to suppress the time-walk effect. The time resolution was measured to be 65 ps in rms using a picosecond-pulsed laser. This resolution satisfied the requirements of the muon linac of the J-PARC E34 experiment. We measured the bunch width of negative-muonium ions accelerated with a radio-frequency quadrupole using the BWM. The bunch width was successfully measured to be $$sigma$$ 54 $$pm$$ 11 ns, which is consistent with the simulation.

Journal Articles

Negative muonium ion production with a C12A7 electride film

Otani, Masashi*; Fukao, Yoshinori*; Futatsukawa, Kenta*; Kawamura, Naritoshi*; Matoba, Shiro*; Mibe, Tsutomu*; Miyake, Yasuhiro*; Shimomura, Koichiro*; Yamazaki, Takayuki*; Hasegawa, Kazuo; et al.

Journal of Physics; Conference Series, 1350, p.012067_1 - 012067_6, 2019/12

 Times Cited Count:3 Percentile:78.54(Physics, Particles & Fields)

Negative muonium atom ($$mu^+$$e$$^-$$e$$^-$$, Mu$$^-$$) has unique features stimulating potential interesting for several scientific fields. Since its discovery in late 1980's in vacuum, it has been discussed that the production efficiency would be improved using a low-work function material. C12A7 was a well-known insulator as a constituent of alumina cement, but was recently confirmed to exhibit electric conductivity by electron doping. The C12A7 electride has relatively low-work function (2.9 eV). In this paper, the negative muonium production measurement with several materials including a C12A7 electride film will be presented. Measured production rate of the Mu$$^-$$ were 10$$^{-3}$$/s for all the Al, electride, and SUS target. Significant enhancement on electride target was not observed, thus it is presumed that the surface condition should be more carefully treated. There was no material dependence of the Mu$$^-$$ averaged energy: it was 0.2$$pm$$0.1keV.

Journal Articles

Development of the longitudinal beam profile monitor with high time resolution for realization of low-emittance muon beam in the J-PARC E34 muon g-2/EDM experiment

Yotsuzuka, Mai*; Iijima, Toru*; Iinuma, Hiromi*; Inami, Kenji*; Otani, Masashi*; Kawamura, Naritoshi*; Kitamura, Ryo; Kondo, Yasuhiro; Saito, Naohito; Shimomura, Koichiro*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.814 - 817, 2019/07

The J-PARC E34 experiment aims to measure the muon anomalous magnetic moment and the electric dipole moment with a high precision. In this experiment, thermal muonium is produced and ionized by laser resonance to generate ultra-slow muons, which are then accelerated in a multistage muon linac. In order to satisfy the experimental requirements, suppression of the emittance growth during the acceleration is necessary. Because the main cause of the emittance growth is beam mismatching between the accelerating stages, the transverse and longitudinal beam monitoring is important. The longitudinal beam monitor has to measure the bunch length with the resolution equivalent to tens of picoseconds, which is 1% of the acceleration phase of 324 MHz. In addition, it should be sensitive to single muon because the beam intensity is limited during the commissioning phase. To realize above requirements, we are developing a longitudinal beam monitor with a micro channel plate, and the test bench to evaluate the monitor performance. So far, the time resolution of the beam monitor was obtained to be 65 ps in RMS including the jitter on the test bench. We also succeeded in measuring the longitudinal bunch size of the muon beam accelerated by RFQ using the beam monitor. In this paper, the results of the performance evaluation for this beam monitor are reported.

Journal Articles

Bunch size measurement with high time resolution for RF accelerated muon beam

Sue, Yuki*; Iijima, Toru*; Inami, Kenji*; Yotsuzuka, Mai*; Iinuma, Hiromi*; Nakazawa, Yuga*; Otani, Masashi*; Kawamura, Naritoshi*; Shimomura, Koichiro*; Futatsukawa, Kenta*; et al.

Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.55 - 60, 2019/07

The result of bunch size measurement of muon accelerated by RFQ up to 89 keV is presented in this paper. A four-stage muon linac for precise measurement of muon property is under construction in the J-PARC. The demonstration of the first muon RF acceleration with an RFQ linac was conducted and the transverse profile of the accelerated muons was measured in 2017. As one of the remaining issues for the beam diagnostic system, the longitudinal beam profile after the RFQ should be measured to match the profile to the designed acceptance of the subsequent accelerator. For this purpose, the new longitudinal beam monitor using the microchannel plate is under development. The time resolution of the monitor aims to be around 30 to 40 ps corresponding to 1% of a period of an operating frequency of the accelerator, which is 324 MHz. On November 2018, the bunch size of accelerated negative muonium ion of 89 keV with the RFQ was measured using this monitor at the J-PARC MLF. The measured bunch width is $$0.54pm0.13$$ ns, which is consistent with the simulation.

Journal Articles

Development of the longitudinal beam monitor with high time resolution for a muon linac in the J-PARC E34 experiment

Yotsuzuka, Mai*; Iijima, Toru*; Inami, Kenji*; Sue, Yuki*; Iinuma, Hiromi*; Nakazawa, Yuga*; Saito, Naohito; Hasegawa, Kazuo; Kondo, Yasuhiro; Kitamura, Ryo; et al.

Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.2571 - 2574, 2019/06

The J-PARC E34 experiment aims to measure the muon anomalous magnetic moment and the electric dipole moment with a high precision. In this experiment, thermal muonium is produced and ionized by laser resonance to generate ultra-slow muons, which are then accelerated in a multistage muon linac. In order to satisfy the experimental requirements, suppression of the emittance growth during the acceleration is necessary. Because the main cause of the emittance growth is beam mismatching between the accelerating stages, the transverse and longitudinal beam monitoring is important. The longitudinal beam monitor has to measure the bunch length with the resolution equivalent to tens of picoseconds, which is 1% of the acceleration phase of 324 MHz. In addition, it should be sensitive to single muon because the beam intensity is limited during the commissioning phase. To realize above requirements, we are developing a longitudinal beam monitor with a micro channel plate, and the test bench to evaluate the monitor performance. So far, the time resolution of the beam monitor was obtained to be 65 ps in RMS including the jitter on the test bench. We also succeeded in measuring the longitudinal bunch size of the muon beam accelerated by RFQ using the beam monitor. Further improvement of the measurement system is needed to guarantee the required accuracy. In this paper, the results of the performance evaluation for this beam monitor are reported.

Journal Articles

A Bunch structure measurement of muons accelerated by RFQ using a longitudinal beam-profile monitor with high time resolution

Sue, Yuki*; Iijima, Toru*; Inami, Kenji*; Yotsuzuka, Mai*; Futatsukawa, Kenta*; Kawamura, Naritoshi*; Mibe, Tsutomu*; Miyake, Yasuhiro*; Otani, Masashi*; Hasegawa, Kazuo; et al.

Proceedings of 10th International Particle Accelerator Conference (IPAC '19) (Internet), p.37 - 40, 2019/06

The result of bunch size measurement of muon accelerated by RFQ up to 89 keV is presented in this paper. A four-stage muon linac for precise measurement of muon property is under construction in the J-PARC. The demonstration of the first muon RF acceleration with an RFQ linac was conducted and the transverse profile of the accelerated muons was measured in 2017. As one of the remaining issues for the beam diagnostic system, the longitudinal beam profile after the RFQ should be measured to match the profile to the designed acceptance of the subsequent accelerator. For this purpose, the new longitudinal beam monitor using the microchannel plate is under development. The time resolution of the monitor aims to be around 30 to 40 ps corresponding to 1% of a period of an operating frequency of the accelerator, which is 324 MHz. On November 2018, the bunch size of accelerated negative muonium ion of 89 keV with the RFQ was measured using this monitor at the J-PARC MLF. The measured bunch width is $$0.54pm0.13$$ ns, which is consistent with the simulation.

Journal Articles

Benchmark tests of newly-evaluated data of $$^{235}$$U for CIELO project using integral experiments of uranium-fueled FCA assemblies

Fukushima, Masahiro; Kitamura, Yasunori*; Yokoyama, Kenji; Iwamoto, Osamu; Nagaya, Yasunobu; Leal, L. C.*

Proceedings of International Conference on the Physics of Reactors; Unifying Theory and Experiments in the 21st Century (PHYSOR 2016) (USB Flash Drive), p.605 - 619, 2016/05

A nuclear data of $$^{235}$$U has been recently evaluated for the CIELO (Collaborative International Evaluated Library Organization) project. We tested the newly-evaluated data of $$^{235}$$U using integral experiments of the Fast Critical Assembly (FCA) performed at JAEA. We selected two integral data of uranium-fueled FCA assemblies; one is the sodium-void reactivity worth of FCA XXVII-1 assembly and the other is the criticalities of the seven assemblies of FCA IX. The benchmark tests support the evaluation done in the resonance regions. However, the $$^{235}$$U capture cross section above the unresolved resonance range needs further investigation.

Journal Articles

Full-coherent free electron laser seeded by 13th- and 15th-order harmonics of near-infrared femtosecond laser pulses

Sato, Takahiro*; Iwasaki, Atsushi*; Owada, Shigeki*; Yamanouchi, Kaoru*; Takahashi, Eiji*; Midorikawa, Katsumi*; Aoyama, Makoto; Yamakawa, Koichi; Togashi, Tadashi*; Fukami, Kenji*; et al.

Journal of Physics B; Atomic, Molecular and Optical Physics, 46(16), p.164006_1 - 164006_6, 2013/08

 Times Cited Count:3 Percentile:18.26(Optics)

By introducing 13th- (61.7 nm) and 15th-order harmonics (53.4 nm) of femtosecond laser pulses at 800 nm into an undulator of SCSS (SPring-8 Compact SASE Source) test accelerator at RIKEN, these harmonic pulses were amplified by a factor of more than 10$$^{2}$$ with a high contrast ratio through the interaction between accelerated electron bunches and the harmonic pulses. From numerical simulations of the amplification processes of high-order harmonic pulses in the undulator, optimum conditions of the electron bunch duration interacting with the high-order harmonic pulses were investigated for generating full-coherent and intense pulses in the extreme ultraviolet wavelength region.

Journal Articles

Extreme ultraviolet free electron laser seeded with high-order harmonic of Ti:sapphore laser

Togashi, Tadashi*; Takahashi, Eiji*; Midorikawa, Katsumi*; Aoyama, Makoto; Yamakawa, Koichi; Sato, Takahiro*; Iwasaki, Atsushi*; Owada, Shigeki*; Okino, Tomoya*; Yamanouchi, Kaoru*; et al.

Optics Express (Internet), 19(1), p.317 - 324, 2011/01

 Times Cited Count:97 Percentile:96.10(Optics)

The 13th harmonic of a Ti:sapphire (Ti:S) laser in the plateau region was injected as a seeding source to a 250-MeV free-electron-laser (FEL) amplifier. When the amplification conditions were fulfilled, strong enhancement of the radiation intensity by a factor of 650 was observed. The random and uncontrollable spikes, which appeared in the spectra of the Self-Amplified Spontaneous Emission (SASE) based FEL radiation without the seeding source, were found to be suppressed drastically to form to a narrow-band, single peak profile at 61.2 nm. The properties of the seeded FEL radiation were well reproduced by numerical simulations. We discuss the future precept of the seeded FEL scheme to the shorter wavelength region.

Journal Articles

Pulse neutron experiment for accelerator-driven system, 2

Nishihara, Kenji; Sugawara, Takanori; Tsujimoto, Kazufumi; Kitamura, Yasunori; Pyeon, C. H.*

KURRI Progress Report 2009, P. 201, 2010/10

The regression method for pulse neutron source (PNS) experiment has been developed to monitor sub-criticality of an accelerator-driven system (ADS). This method is applicable for PNS experiment with bad experimental conditions, such as high repetition of neutron source that makes the alpha-fitting method difficult to determine delayed neutron level. In the present study, the regression method was verified using the KUCA-A core with various sub-critical levels induced by DT neutrons with several numbers of repetitions. As a result, the discrepancy of $$k$$$$_{eff}$$ and count rates between experiment and the regression method was observed for the low repetitions. Further investigation for background is necessary in next study.

Journal Articles

Shaking table tests with large test specimens of seismically isolated FBR plants, 3; Ultimate behavior of upper structure and rubber bearings

Yabana, Shuichi*; Kanazawa, Kenji*; Nagata, Seiji*; Kitamura, Seiji; Sano, Takeshi*

Proceedings of 2009 ASME Pressure Vessels and Piping Division Conference (PVP 2009) (CD-ROM), 9 Pages, 2009/07

Journal Articles

Seismic transient change of natural frequency estimation by adaptive filtering scheme

Kirita, Fumio; Kanazawa, Kenji*; Kitamura, Haruyuki*

Proceedings of 14th World Conference on Earthquake Engineering (WCEE-14) (CD-ROM), 8 Pages, 2008/10

This paper presents a new system identification procedure for a time-varying system to estimate natural frequency transition of a building from a strong seismic motion record, named as "Adaptive Forward-Backward Kalman Filter (AFB-KF)". The AFB-KF is compared to the conventional Kalman Filter in the below three points: (1) Forgetting factor for covariance functions to track time-varying structural parameters rapidly, (2) Time-backward estimation scheme and global iteration scheme of the forward and backward processes to estimate unknown initial value of structural parameters, (3) The time series renewal algorithm of statistical properties by reflecting the previous analysis information to improve the identification accuracy. It is useful to accurately identify from natural frequency transition of a building during an earthquake for structural health monitoring which evaluates structural integrity.

Journal Articles

Development of elevated temperature structural design standard and three-dimensional seismic isolation technology for advanced nuclear power plant

Inoue, Kazuhiko*; Shibamoto, Hiroshi*; Takahashi, Kenji; Ikutama, Shinya*; Morishita, Masaki; Aoto, Kazumi; Kasahara, Naoto; Asayama, Tai; Kitamura, Seiji

Nihon Genshiryoku Gakkai-Shi, 48(5), p.333 - 338, 2006/05

no abstracts in English

Journal Articles

Experimental study on vertical component isolation system

Shigeki, Okamura; Kitamura, Seiji; Takahashi, Kenji

Transactions of 18th International Conference on Structural Mechanics in Reactor Technology (SMiRT-18), 0 Pages, 2005/08

In Japan, several kinds of three-dimensional seismic isolation system for next-generation nuclear power plant such as fast reactors have been studied in recent years. We proposed a structural concept of a vertical component isolation system, assuming a building adopting a horizontal base isolation system. In this concept, a reactor vessel and major primary components are suspended from a large common deck supported by isolation devices consisting of large coned disk springs. In order to verify the isolation performance of the vertical component isolation system, 1/8 series of shaking table tests using a scale model were conducted. The test model was composed of 4 vertical isolation devices, common deck and horizontal load suspension system which supports the horizontal load by the earthquake. For the design earthquake, the system smoothly operated, and sufficient isolation characteristics were shown. The examination on the horizontal load suspension system was carried out. The simulation analysis results matched well the test results, so the validity of the design technique was able to be verified. As the result, the prospect that the vertical isolation system applied to the FBR plant could technically realize was obtained.

JAEA Reports

Study on three-dimensional seismic isolation structure

Morishita, Maaki; Kitamura, Seiji; Takahashi, Kenji; Inoue, Kazuhiko*; Kato, Asao*; Fushimi, Minoru*

JNC TY9400 2005-010, 1150 Pages, 2005/07

Japan Nuclear Cycle Development Institute (JNC) and Japan Atomic Power Company (JAPC) launched joint research programs on structural design and three-dimentional seismic isolation technologies, as a part of the supporting R&D activities for the feasibility studeies on commercialized fast breeder reactor cycle systems. A reserch project by JAPC under the auspices of the Ministry of Economy,Trade, and Industry (METI) with technical support by JNC is included in this joint study. This report contains the results of the reserch on the structural design technology. The reserch is reported in the following orderes, (1) Development till fiscal 2004, (2) Study on the 3-dimentional base isolation system (fiscal 2005), (3) Study on the guideline of 3-dimentional base isolation system, (4) Study on the vertical isolation system for main equiptment (fiscal 2005), (5) Study on the guideline of the vertical isolation system for main equipment.

Journal Articles

Development of vertical component isolation system with coned disk springs for FBR plant

Kitamura, Seiji; Okamura, Shigeki; Takahashi, Kenji; Kamishima, Yoshio*; Somaki, Takahiro*; Morishita, Masaki

Proceedings of 9th World Seminar on Seismic Isolation, Energy Dissipation and Active Vibration Control of Structures (CD-ROM), p.209 - 216, 2005/00

A structural concept of a vertical component isolation system for fast reactors, assuming a building adopting a horizontal base isolation system, has been studied. In this concept, a reactor vessel and major primary components are suspended from a large common deck supported by vertical isolation devices consisting of large coned disk springs. We designed the isolation device, which could be achieved vertical isolation frequency of 1 Hz and damping ratio of 20 %. Full scale coned disk spring and damper performance tests were carried out to verify the validity of design equations. And a series of shaking table test using a 1/8 scale model was performed. The test results fit well the simulation analysis results, so the validity of the design methods was able to be verified. The prospect that the vertical component isolation system applied to the FBR plant could technically realize was obtained.

JAEA Reports

Study on Advanced Structural Design for Commercialized Fast Breeder Reactors

Morishita, Masaki; Kitamura, Seiji; Takahashi, Kenji; Inoue, Kazuhiko; Kida, Masanori; Moro, Satoshi*; Kato, Asao*; Fushimi, Minoru*

JNC TY9400 2004-028, 921 Pages, 2004/11

Japan Nuclear Cycle Development Institute (JNC) and Japan Atomic Power Company (JAPC) launched joint research programs on structural design and three-dimensional seismic isolation technologies, as part of the supporting R&D activities for the feasibility studies on commercialized fast breeder reactor cycle systems. A research project by JAPC under the auspices of the Ministry of Economy, Trade, and Industry (METI) with technical support by JNC is included in this joint study. This report contains the results of the research on the structural design technology. The research scope was identified as (1) Study on Developing Program, (2) Study on 3-dimentional Entire Building Base Isolation System, and (3) Study on Vertical Isolation System for Main Equipment, and the results of this year's studies are summarized as follows. (1) Study on Developing Program -Performance Requirements for 3-dimensional Isolation Devices "The behavior of a three-dimensional isolated reactor building" and "amenity under the strong wind load" were studied in order to set up performance requirements for the three-dimensional isolation system. Consequently, it was proved for the former subject that the structure of horizontal base-dimensional isolated building was applicable to 3-D isolated building and for the latter that amenity of the operator in the 3-D isolated reactor building is not affected under the strong wind. -Development Targets and Schedules for Three-dimensional Isolation Deviece In order to select the development candidate of the three dimensional isolation devices, "evaluation items and criteria" and "technical guideline on seismic three-dimensional isolation system" were studied. For the former subject, detailed requirements to the component in the reactor building were studied based on the 2002 fiscal year result and embodied.(2) Study on 3-dimentional Entire Building Base Isolation System -The 3 system concepts nominated on 2001, "Hydraulic system", "Fiber reinforced air sp

Journal Articles

Experimental study on vertical component seismic isolation system with coned disk spring

Kitamura, Seiji; Shigeki, Okamura; Kenji, Takahashi

Proceedings of 2005 ASME International Mechanical Engineering Congress and Exposition (CD-ROM), 0 Pages, 2004/07

Several kinds of three-dimensional seismic isolation system for next-generation nuclear power plant such as fast reactors have been studied in recent years. We proposed a structural concept of a vertical component isolation system, assuming a building adopting a horizontal base isolation system. In this concept, a reactor vessel and major primary components are suspended from a large common deck supported by isolation devices consisting of large coned disk springs. In order to verify the isolation performance of the vertical component isolation system, 1/8 series of shaking table tests using a scale model were conducted. The test model was composed of 4 vertical isolation devices, common deck and horizontal load suspension system. For the design earthquake, the system smoothly operated, and sufficient isolation characteristics were shown. The simulation analysis results matched well the test results, so the validity of the design technique was able to be verified. As the result, the prospect that the vertical isolation system applied to the FBR plant could technically realize was obtained.

Journal Articles

Realistic Safety Margin Analysis of Monju Based on Plant Performance Measurements

Yamada, Fumiaki; Kitamura, Kenji*

Proceedings of 12th International Conference on Nuclear Engineering (ICONE-12) (CD-ROM), 0 Pages, 2004/04

None

36 (Records 1-20 displayed on this page)