Watanabe, Yasuhiro; Yanagibashi, Takanori; Komatsuzaki, Makoto*
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1024 - 1028, 2023/10
J-PARC RCS accelerates a high-intensity proton beam from 400 MeV to 3 GeV at a repetition rate of 25 Hz. The main magnet system of the RCS is composed of a family of dipole magnets and seven families of quadrupole magnets excited by eight independent resonant circuits. The current control system of the main magnet power supply requires high-precision tracking control between different magnet families. The original control system of the main magnet power supply had been operated without major problems for fifteen years since the start of operation of the RCS, while the control system component is obsolete. We developed a new power supply controller based on SoC FPGA. The controller consists of a main board and four daughter boards and all functions required for current control of the power supply are installed in a 19-inch rack 2U control unit.
Hamaguchi, Takumi; Yamada, Junya; Komatsuzaki, Naoya*; Hatakeyama, Takumi; Seya, Natsumi; Muto, Yasunobu; Miyauchi, Hideaki; Hashimoto, Makoto
JAEA-Technology 2022-038, 65 Pages, 2023/03
New regulatory requirements were developed taking into account the lessons-learnt from the accident at Fukushima Daiichi Nuclear Power Station on March 2011. The new regulatory standards required that monitoring posts should be diversified in transmission systems and equipped with backup power supply equipment for design basis accidents. In this report, we look back on the history of monitoring posts in Oarai Research and Development Institute, explained the application for the permission of reactor installment license, application for approval of the design and construction method, pre-use operator's inspection and improvement design of monitoring posts. This report also includes about inspection based on act on special measures concerning nuclear emergency preparedness and the installation of KURAMA-II, which was carried out in conjunction with the improvement of monitoring post for new regulatory standards. As an appendix, application document for approval of the design and construction method are included.
Hidaka, Akihide; Uesaka, Mitsuru*; Komatsuzaki, Tsuneo*; Takahashi, Makoto*; Okajima, Shigeaki; Uno, Masayoshi*
no journal, ,
no abstracts in English