Refine your search:     
Report No.
 - 
Search Results: Records 1-18 displayed on this page of 18
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Engineering validation and engineering design of lithium target facility in IFMIF/EVEDA project

Wakai, Eiichi; Kondo, Hiroo; Kanemura, Takuji; Furukawa, Tomohiro; Hirakawa, Yasushi; Watanabe, Kazuyoshi; Ida, Mizuho*; Ito, Yuzuru; Niitsuma, Shigeto; Edao, Yuki; et al.

Fusion Science and Technology, 66(1), p.46 - 56, 2014/07

 Times Cited Count:4 Percentile:30.8(Nuclear Science & Technology)

Journal Articles

Development of lithium target system in engineering validation and engineering design activity of the International Fusion Materials Irradiation Facility (IFMIF/EVEDA)

Wakai, Eiichi; Kondo, Hiroo; Sugimoto, Masayoshi; Fukada, Satoshi*; Yagi, Juro*; Ida, Mizuho; Kanemura, Takuji; Furukawa, Tomohiro; Hirakawa, Yasushi; Watanabe, Kazuyoshi; et al.

Purazuma, Kaku Yugo Gakkai-Shi, 88(12), p.691 - 705, 2012/12

AA2012-1008.pdf:2.42MB

no abstracts in English

Journal Articles

Transverse beam matching and orbit corrections at J-PARC LINAC

Sako, Hiroyuki; Ueno, Akira; Okawa, Tomohiro*; Kondo, Yasuhiro; Morishita, Takatoshi; Ikegami, Masanori*; Akikawa, Hisashi*

Proceedings of 24th International Linear Accelerator Conference (LINAC 2008) (CD-ROM), p.260 - 262, 2009/00

In designed very high intensity proton beam of J-PARC LINAC, precise control of transverse beam dynamics is extremely important for suppression of beam loss. We present results of transverse beam matching and orbit corrections. Excellent matching performance has been achieved with mismatch factor less than 5% at beam current of 5 to 30 mA. Orbit deviations were suppressed within 1mm in horizontal and vertical directions in the whole LINAC.

Journal Articles

Beam energy measurement at J-PARC linac

Sato, Susumu; Igarashi, Zenei*; Tomisawa, Tetsuo; Miura, Akihiko; Ueno, Akira; Sako, Hiroyuki; Morishita, Takatoshi; Kondo, Yasuhiro; Shen, G.; Akikawa, Hisashi*; et al.

Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.500 - 502, 2008/00

no abstracts in English

Journal Articles

Commissioning strategies for J-PARC linac and L3BT

Ikegami, Masanori*; Lee, S.*; Akikawa, Hisashi*; Igarashi, Zenei*; Kondo, Yasuhiro; Okawa, Tomohiro; Ueno, Akira; Sako, Hiroyuki; Ao, Hiroyuki; Sato, Susumu; et al.

KEK Proceedings 2006-15 (CD-ROM), p.347 - 349, 2007/03

We plan to start the beam commissioning of J-PARC linac with reduced energy of 181 MeV in the end of this year. Detailed commissioning strategies for the linac and the succeeding beam transport line, to which we refer as L3BT or Linac-to-3-GeV-synchrotron Beam Transport, will be presented in this talk. The emphasis will be put on the commissioning procedures for two debuncher cavities and a transverse collimator system located in L3BT, because they are key elements in determining the final beam quality at the injection point to the succeeding 3-GeV synchrotron. The unique design and features of the collimator system are also presented.

Journal Articles

Upgrade of beam diagnostics in LEBT and MEBT of J-PARC LINAC

Sato, Susumu; Tomisawa, Tetsuo; Kondo, Yasuhiro; Ueno, Akira; Akikawa, Hisashi*; Igarashi, Zenei*; Lee, S.*; Kubota, Chikashi*; Ikegami, Masanori*

Proceedings of 23rd International Linear Accelerator Conference (LINAC 2006) (CD-ROM), p.268 - 270, 2007/00

In the J-PARC LINAC, upgrade of beam diagnostics of LEBT and MEBT is taken. Three beam current monitors and two beam phase monitors are added. In the LEBT and MEBT section, large number of accelerator devices are placed. Therefore to save the space, several modifications are needed, for example, additional monitors need to be welded with each other. Those details of the upgrade of beam diagnostics system are described.

JAEA Reports

Report of investigation on malfunction of reserved shutdown system in HTTR

Hamamoto, Shimpei; Iigaki, Kazuhiko; Shimizu, Atsushi; Sawahata, Hiroaki; Kondo, Makoto; Oyama, Sunao; Kawano, Shuichi; Kobayashi, Shoichi; Kawamoto, Taiki; Suzuki, Hisashi; et al.

JAEA-Technology 2006-030, 58 Pages, 2006/03

JAEA-Technology-2006-030.pdf:10.69MB

During normal operation of High Temperature engineering Test Reactor (HTTR) in Japan Atomic Energy Agency (JAEA), the reactivity is controlled by the Control Rods (CRs) system which consists of 32 CRs (16 pairs) and 16 Control Rod Drive Mechanisms (CRDMs). The CR system is located in stand-pipes accompanied by the Reserved Shutdown System (RSS). In the unlikely event that the CRs fail to be inserted, the RSS is provided to insert B$$_{4}$$C/C pellets into the core. The RSS shall be designed so that the reactor should be held subcriticality from any operation condition by dropping in the pellets. The RSS consists of B$$_{4}$$C/C pellets, hoppers which contain the pellets, electric plug, driving mechanisms, guide tubes and so on. In accidents when the CRs cannot be inserted, an electric plug is pulled out by a motor and the absorber pellets fall into the core by gravity. A trouble, malfunction of one RSS out of sixteen, occurred during a series of the pre-start up checks of HTTR on February 21, 2005. We investigated the cause of the RSS trouble and took countermeasures to prevent the issue. As the result of investigation, the cause of the trouble was attributed to the following reason: In the motor inside, The Oil of grease of the multiplying gear flowed down from a gap of the oil seal which has been deformed and was mixed with abrasion powder of brake disk. Therefore the adhesive mixture prevented a motor from rotating.

Journal Articles

Investigation of photo neutralization efficiency of high intensity H$$^{-}$$ beam with Nd:YAG laser in J-PARC

Tomisawa, Tetsuo; Akikawa, Hisashi; Sato, Susumu; Ueno, Akira; Kondo, Yasuhiro; Oigawa, Hiroyuki; Sasa, Toshinobu; Hasegawa, Kazuo; Lee, S.*; Igarashi, Zenei*; et al.

Proceedings of 7th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC 2005), p.275 - 277, 2005/00

The photo neutralization method with Nd:YAG laser for negative hydrogen ions has been expected as an available candidate for the transverse beam profile measurement. The fraction of photo detached electron can also be used for charge exchange procedure to extract very low power proton beam for Transmutation Experimental Facility in J-PARC. The laser system has advantages of maintenance and radiation hardness in high intensity proton accelerators. In order to establish the low power beam extraction system and beam profile monitor, the photo neutralization efficiency must be surveyed in practical beam line with high intensity H$$^{-}$$ beam. In this paper, an experimental set-up and preliminary results of photo neutralization method for intense H$$^{-}$$ beam in J-PARC MEBT1 are described.

Journal Articles

Beam commissioning of the J-PARC linac DTL1 at KEK

Kondo, Yasuhiro; Akikawa, Hisashi; Anami, Shozo*; Asano, Hiroyuki*; Fukui, Yuji*; Igarashi, Zenei*; Ikegami, Kiyoshi*; Ikegami, Masanori*; Ito, Takashi; Kawamura, Masato*; et al.

Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.156 - 158, 2004/08

A commissioning of the J-PARC linac DTL1 is now under way at KEK. A 30mA H$$^{-}$$ beam was accelerated to 19.7-MeV, and 100% transmission was obtained with a 20-msec-pulse-width and 12.5-Hz-repetition beam. In this paper, present status of the DTL1 commissioning and preliminary results of the commissioning, such as emittance measurements, are presented.

Journal Articles

Systematic calibration of beam position monitor at J-PARC LINAC

Sato, Susumu; Tomisawa, Tetsuo; Hiroki, Fumio; Lee, S.*; Igarashi, Zenei*; Ikegami, Masanori*; Ueno, Akira; Kondo, Yasuhiro; Hasegawa, Kazuo; Toyama, Takeshi*; et al.

Proceedings of 1st Annual Meeting of Particle Accelerator Society of Japan and 29th Linear Accelerator Meeting in Japan, p.467 - 469, 2004/08

As a joint project of KEK and JAERI, a MW class of high intensity proton accelerator (J-PARC), consisting of Linac, 3 GeV-RCS, 50 GeV-MR, is under construction. For this accelerator, it is required to minimize the beam loss (typically, lower than0.1$$sim$$1 W/m at the linac). To achieve the requirement, beam trajectory needs to be controlled with accuracy of some 100 $$mu$$m. The first stage of the acceleration (up to 181 MeV during the first stage of construction) is done by linac. The beam position monitor (BPM) in the linac utilizes 4 stripline pickups (50 ohm) on the beam transportation chamber. In this paper, systematic calibration of the BPM is described.

JAEA Reports

None

Kondo, Toshiyuki; Ikeda, Hisashi

PNC TN8410 90-044, 291 Pages, 1990/03

PNC-TN8410-90-044.pdf:5.18MB

None

Oral presentation

Feedback reactivity in the experimental fast reactor Joyo, 3; Analysis of power reactivity coefficient considering fuel irradiation behavior in Joyo

Kondo, Ryo*; Ninokata, Hisashi*; Maeda, Shigetaka; Aoyama, Takafumi

no journal, , 

no abstracts in English

Oral presentation

The Operational results of adsorption system for radioactive liquid waste at MOX Fuel Facility

Aoki, Isao; Minouchi, Hiroyuki; Kondo, Hisashi; Usui, Kazuya

no journal, , 

no abstracts in English

Oral presentation

Inspection and repair techniques in reactor vessel of sodium cooled fast reactor, 8-2; Removal of cover gas boundary components on rotating plug of Joyo

Okuda, Eiji; Fujinaka, Hideaki; Suzuki, Toshiaki; Shimizu, Hisashi*; Kondo, Katsumi*

no journal, , 

no abstracts in English

Oral presentation

Progress and scheme of IFMIF/EVEDA project; Lithium target facility

Wakai, Eiichi; Watanabe, Kazuyoshi; Ida, Mizuho*; Kondo, Hiroo; Kanemura, Takuji; Niitsuma, Shigeto*; Fujishiro, Koji; Ito, Yuzuru; Nakaniwa, Koichi; Sugimoto, Masayoshi; et al.

no journal, , 

Oral presentation

Status of lithium target facility development in IFMIF/EVEDA project

Wakai, Eiichi; Kondo, Hiroo; Kanemura, Takuji; Furukawa, Tomohiro; Hirakawa, Yasushi; Nakaniwa, Koichi; Ito, Yuzuru; Tanaka, Hiroshi; Tsuji, Yoshiyuki*; Ito, Takahiro*; et al.

no journal, , 

no abstracts in English

Oral presentation

The Countermeasures of SBO by taking account of HTTR characteristics

Kondo, Makoto; Homma, Fumitaka; Sawahata, Hiroaki; Hirato, Yoji; Kawamoto, Taiki; Suzuki, Hisashi; Ono, Masato

no journal, , 

no abstracts in English

Oral presentation

R&D of lithium target and test facilities for the fusion neutron source

Wakai, Eiichi; Kondo, Hiroo; Kanemura, Takuji; Hirakawa, Yasushi; Furukawa, Tomohiro; Kikuchi, Takayuki; Ito, Yuzuru*; Hoashi, Eiji*; Yoshihashi, Sachiko*; Horiike, Hiroshi*; et al.

no journal, , 

no abstracts in English

18 (Records 1-18 displayed on this page)
  • 1