Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Removal techniques for contaminated analytical Grove Box with nuclear fuel materials

Yokochi, Masaru; Goto, Yuichi; Kuno, Sorato; Suzuki, Yoshimasa; Yamamoto, Masahiko; Taguchi, Shigeo; Usui, Masato*; Onose, Taku*; Miyamoto, Toshihiko*; Mori, Eito*

Nihon Hozen Gakkai Dai-21-Kai Gakujutsu Koenkai Yoshishu, 4 Pages, 2025/07

Analysis facility in Tokai Reprocessing Plant, which is shifted to decommissioning stage, have been installed about 60 Grove Boxes to handling the nuclear fuel materials. Of these, progressing an aging accompanied by long use for 20 years more than half. This time, removal the special Grove Box that equipped the Thermal Ionization Mass Spectrometry, necessary safeguard analysis for nuclear fuel materials. This report summarized the removal techniques of the special Grove Box, the number of working days, workers and amount of waste generated in this removal work.

JAEA Reports

Analysis work on flush-out of plutonium and uranium for decommissioning of main plant in Tokai Reprocessing Plant

Sato, Hinata; Mori, Amami; Kuno, Sorato; Horigome, Kazushi; Goto, Yuichi; Yamamoto, Masahiko; Taguchi, Shigeo

JAEA-Technology 2024-011, 56 Pages, 2024/10

JAEA-Technology-2024-011.pdf:2.5MB

Flush-out, which recovers remaining nuclear materials in the process and transfer it to a highly radioactive liquid waste storage tank, has been performed at main plant of Tokai Reprocessing Plant. The flush-out has been composed from three steps: first step is to remove of spent fuel sheared powder, second step is to collect plutonium solution stored in the process, and third step is to convert uranium solution into uranium trioxide powder. The first step of flush-out activity has been completed in 2022. Second and third steps of flush-out have been completed from March 2023 to February 2024. Process control analysis has been performed for operation of the facility, and material accountancy analysis has been performed to control the accountancy of nuclear materials. In addition, related analytical work such as pretreatment for transporting inspection samples for safeguards analysis laboratories in IAEA has been also performed. This report describes results of analytical work performed in collections of plutonium and uranium solutions in second and third steps of the flush-out, including calibration of analytical equipment, waste generation, and education and training of analytical operator.

2 (Records 1-2 displayed on this page)
  • 1