Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Wakai, Eiichi; Kim, B. J.; Nozawa, Takashi; Kikuchi, Takayuki; Hirano, Michiko*; Kimura, Akihiko*; Kasada, Ryuta*; Yokomine, Takehiko*; Yoshida, Takahide*; Nogami, Shuhei*; et al.
Proceedings of 24th IAEA Fusion Energy Conference (FEC 2012) (CD-ROM), 6 Pages, 2013/03
El-Guebaly, L. A.*; Massaut, V.*; Tobita, Kenji; Cadwallader, L.*
Fusion Engineering and Design, 83(7-9), p.928 - 935, 2008/12
Times Cited Count:26 Percentile:83.5(Nuclear Science & Technology)After decades of designing fusion power plants, it is timely to develop a new framework for managing the activated materials that will be generated during plant operation and after decommissioning. This will clearly demonstrate that scientists developing fusion processes and facilities will be dealing with the back end from the beginning of the conceptual design of power plants. It is becoming evident that future regulations for geological burial will be upgraded to assure tighter environmental controls. Beginning in the mid 1980s and continuing to the present, numerous fusion designs examined replacing the disposal option with more environmentally attractive approaches, redirecting their attention to recycling and clearance while continuing the development of materials with low activation potential.
Matsumoto, Hiroshi; Knaster, J.*; Heidinger, R.*; Sugimoto, Masayoshi; Ibarra, A.*; Mosnier, A.*; Heinzel, V.*; Massaut, V.*; Micciche, G.*; Mslang, A.*
no journal, ,
The International Fusion Materials Irradiation Facility (IFMIF) Engineering Design and Engineering Validation Activities (EVEDA) started in 2007 under the framework of the Broader Approach (BA) Agreement between EU and Japan with the objective of developing a complete engineering design of the IFMIF together with accompanying sub projects to validate the major elements of the technologies essential for the IFMIF Plant. The validation sub projects include design and construction of the prototype deuteron beam accelerator, Lithium Loop Test Facility, and irradiation test of samples in Rigs for High Flux Test Modules. The recent achievements from these activities will be presented.