Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Hydrochemical investigation at the Mizunami Underground Research Laboratory; Compilation of groundwater chemistry in the Mizunami group and Toki granite area (April, 2004 - March, 2008)

Sai, Masataka; Hagiwara, Hiroki; Matsushima, Hiroyuki*; Noda, Masatoshi*; Noda, Masaru*; Ando, Kenichi*; Tanaka, Tatsuya*; Ueda, Tadashi*; Honda, Yuko*; Mizuno, Takashi

JAEA-Data/Code 2010-010, 75 Pages, 2010/09

JAEA-Data-Code-2010-010.pdf:2.5MB

This report compiles data set of the groundwater chemistry obtained at Mizunami Underground Research Laboratory (MIU) between the fiscal year 2004 and the fiscal year 2007. These data includes groundwater chemistry of inflow in the shafts and sampled groundwater in the boreholes, which drilled from sub-stages of MIU and from surface (MSB-2, MSB-4, and MIZ-1). Basic information (e.g. sampling location, sampling date, sampling method, analytical method) are also described in terms of quality control and traceability.

Journal Articles

Decommissioning program of FUGEN and current activities

Tezuka, Masashi; Mizui, Hiroyuki; Matsushima, Akira; Nakamura, Yasuyuki; Hayashi, Hirokazu; Sano, Kazuya; Nanko, Takashi; Morishita, Yoshitsugu

Proceedings of International Conference on Advanced Nuclear Fuel Cycle; Sustainable Options & Industrial Perspectives (Global 2009) (CD-ROM), p.2815 - 2821, 2009/09

FUGEN is a proto-type heavy water moderated, boiling light water cooled, pressure tube type reactor with 165MWe and has been shut downed on Mar. 2003. Following the approval of decommissioning program in 2008, stage of FUGEN was changed to the decommissioning of the facilities. The program consists of following four periods; (1) Spent fuel transportation, (2) Periphery facilities dismantlement, (3) Reactor dismantlement and (4) Building demolition. It is expected that the whole decommissioning will be completed until 2028. As a part of the work in the spent fuel transportation period, the main steam system and the feeder water system etc. are being dismantled in the turbine building. The remaining tritium in the heavy water system is also being removed for facilitating the dismantlement of the heavy water system. Moreover, method on dismantlement of the reactor core is being studied with considering the process under the water for the radiation shielding and the dust suppression.

Oral presentation

3 (Records 1-3 displayed on this page)
  • 1