Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Lokotko, T.*; Leblond, S.*; Lee, J.*; Doornenbal, P.*; Obertelli, A.*; Poves, A.*; Nowacki, F.*; Ogata, Kazuyuki*; Yoshida, Kazuki; Authelet, G.*; et al.
Physical Review C, 101(3), p.034314_1 - 034314_7, 2020/03
Times Cited Count:12 Percentile:72.23(Physics, Nuclear)The structures of the neutron-rich Co isotopes were investigated via (
) knockout reactions at the Radioactive Isotope Beam Factory, RIKEN. Level schemes were reconstructed using the
coincidence technique, with tentative spin-parity assignments based on the measured inclusive and exclusive cross sections. Comparison with shell-model calculations suggests coexistence of spherical and deformed shapes at low excitation energies in the
Co isotopes.
Hayashi, Koichi*; Oyama, Kenji*; Happo, Naohisa*; Matsushita, Tomohiro*; Hosokawa, Shinya*; Harada, Masahide; Inamura, Yasuhiro; Nitani, Hiroaki*; Shishido, Toetsu*; Yubuta, Kunio*
Science Advances (Internet), 3(8), p.e1700294_1 - e1700294_7, 2017/08
Kanemura, Takuji; Kondo, Hiroo; Hoashi, Eiji*; Suzuki, Sachiko*; Yamaoka, Nobuo*; Horiike, Hiroshi*; Furukawa, Tomohiro; Hirakawa, Yasushi; Ida, Mizuho; Matsushita, Izuru*; et al.
Fusion Engineering and Design, 88(9-10), p.2547 - 2551, 2013/10
Times Cited Count:4 Percentile:30.88(Nuclear Science & Technology)In the Engineering Validation and Engineering Design Activities (EVEDA) project of the International Fusion Materials Irradiation Facility (IFMIF), thickness variation of a liquid lithium (Li) jet simulating the IFMIF Li target is to be measured in the EVEDA Li Test Loop. This paper presents fabrication and performance tests results of a contact-type liquid level sensor for measuring the jet thickness variation. The sensor can detect contacts between a probe and Li, and analysis of the contact signals yields average jet thickness and amplitude distribution. One of the key fabrication requirements is to drive the probe by 0.1 mm step with positioning precision of 0.01 mm under the vacuum condition of 10Pa. To achieve such requirements, a high torque motor reducer and a friction-reduced ball screw were selected. As a result of the performance tests, the measurement results of the positioning resolution and precision were 0.1 mm and 0.01 mm, respectively.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Kanemura, Takuji; Ida, Mizuho; Watanabe, Kazuyoshi; Nakamura, Kazuyuki; Horiike, Hiroshi*; Yamaoka, Nobuo*; Matsushita, Izuru*; et al.
Proceedings of 24th IAEA Fusion Energy Conference (FEC 2012) (CD-ROM), 8 Pages, 2013/03
Construction and initial performance tests of EVEDA (Engineering Validation and Engineering Design Activities) Lithium Test Loop (ELTL) were completed and therefore one of the major milestones in the engineering validation toward IFMIF (International Fusion Materials Irradiation Facility) was accomplished. The ELTL, which holds 2.5-ton Li, is a proto-type of a Li target facility of the IFMIF and is the largest-ever liquid lithium loop in the history of the fusion research.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Iuchi, Hiroshi; Kanemura, Takuji; Ida, Mizuho; Watanabe, Kazuyoshi; Horiike, Hiroshi*; Yamaoka, Nobuo*; Matsushita, Izuru*; et al.
Fusion Engineering and Design, 87(5-6), p.418 - 422, 2012/08
Times Cited Count:28 Percentile:86.89(Nuclear Science & Technology)The EVEDA Li test loop (ELTL) successfully completed its construction and installation of a total of 2.5-ton Li in the frame work of the IFMIF/EVEDA as one of the ITER-BA. The construction was started on Nov. 2009 in the Oarai site of the Japan Atomic Energy Agency and completed on the middle of Nov. 2010 after passing an authority inspection by a fire department in Oarai town. Subsequently, the 2.5-ton Li was installed to the ELTL by using a glove box. The nitrogen concentration in the 2.5-ton Li was found to be 127 wppm.
Kanemura, Takuji; Kondo, Hiroo; Suzuki, Sachiko*; Hoashi, Eiji*; Yamaoka, Nobuo*; Horiike, Hiroshi*; Furukawa, Tomohiro; Ida, Mizuho; Nakamura, Kazuyuki; Matsushita, Izuru*; et al.
Fusion Science and Technology, 62(1), p.258 - 264, 2012/07
Times Cited Count:4 Percentile:30.61(Nuclear Science & Technology)In the Engineering Validation and Engineering Design Activities (EVEDA) project of the International Fusion Materials Irradiation Facility (IFMIF), which is one of the Broader Approach (BA) activities, thickness variation of a liquid lithium (Li) jet simulating the IFMIF Li target is planned to be measured in the EVEDA Li Test Loop (ELTL). For this purpose, a contact-type liquid level sensor was developed, which can detect contacts between a probe and Li. Analysis of the contact signals yields average jet thickness and amplitude distribution. One of the key development requirements is to drive the probe by 0.1 mm step with positioning accuracy of 0.01 mm under the vacuum condition of 10Pa. To satisfy such a requirement, the sensor's own weight load and moment load were calculated, and based on those calculation results a powerful motor and a friction-reduced ball screw were selected and strong structure was adopted. We have successfully completed the design work of the sensor.
Hayashi, Koichi*; Happo, Naohisa*; Hosokawa, Shinya*; Hu, W.; Matsushita, Tomohiro*
Journal of Physics; Condensed Matter, 24(9), p.093201_1 - 093201_15, 2012/03
Times Cited Count:94 Percentile:60.91(Physics, Condensed Matter)Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Nakamura, Kazuyuki; Ida, Mizuho; Watanabe, Kazuyoshi; Kanemura, Takuji; Wakai, Eiichi; Horiike, Hiroshi*; Yamaoka, Nobuo*; et al.
Nuclear Fusion, 51(12), p.123008_1 - 123008_12, 2011/12
Times Cited Count:40 Percentile:82.03(Physics, Fluids & Plasmas)The Engineering Validation and Engineering Design Activity (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF) is proceeded as one of the ITER Broader Approach (BA) activities. The EVEDA Li test loop (ELTL) is aimed at validating stability of the Li target and feasibility of a Li purification system as the key issues. In this paper, the design of the ELTL especially of a target assembly in which the Li target is produced by the contraction nozzle is presented.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Iuchi, Hiroshi; Kanemura, Takuji; Ida, Mizuho; Watanabe, Kazuyoshi; Horiike, Hiroshi*; Yamaoka, Nobuo*; Matsushita, Izuru*; et al.
Proceedings of Plasma Conference 2011 (PLASMA 2011) (CD-ROM), 2 Pages, 2011/11
The EVEDA Li test loop (ELTL) successfully completed its construction and commissioning in the frame work of the IFMIF/EVEDA as one of the ITER-BA. The construction was started on Nov. 2009 in the O-arai site of the Japan Atomic Energy Agency and completed on the middle of Nov. 2010. In the commissioning conducted subsequently, the following tests were performed: (1) Li ingots installation into the ELTL, (2) Li charging and draining operation, (3) Li circulation tests. In a final phase of the circulation test, stable liquid Li flow at a velocity of 5 m/s was successfully achieved.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Iuchi, Hiroshi; Ida, Mizuho; Yagi, Juro*; Suzuki, Akihiro*; Fukada, Satoshi*; Matsushita, Izuru*; Nakamura, Kazuyuki
Fusion Engineering and Design, 86(9-11), p.2437 - 2441, 2011/10
Times Cited Count:23 Percentile:83.48(Nuclear Science & Technology)Engineering Validation and Engineering Design Activities (EVEDA) for The International Fusion Materials Irradiation Facility (IFMIF) were started from July 2007 under an international agreement called ITER Broader Approach. As a major Japanese activity, EVEDA Li test loop (ELTL) to simulate hydraulic and impurity conditions of IFMIF has already designed and is under construction, in which feasibility of hydraulic stability of the liquid Li target, the purification systems of hot traps are major key issues to be validated in this loop. This paper focuses on the purification systems of the ELTL. Design of a cold trap and hot traps are discussed in this paper.
Furukawa, Tomohiro; Kondo, Hiroo; Hirakawa, Yasushi; Kato, Shoichi; Matsushita, Izuru*; Ida, Mizuho; Nakamura, Kazuyuki
Fusion Engineering and Design, 86(9-11), p.2433 - 2436, 2011/10
Times Cited Count:13 Percentile:67.73(Nuclear Science & Technology)In order to obtain the engineering data on the lithium target system, which is the neutron source of the International Fusion Material Irradiation Facility (IFMIF), the design and fabrication of the IFMIF/EVEDA Lithium Test Loop are being carried out under the Engineering Validation and Engineering Design Activity (EVEDA). The loop will hold 2.5 tons of lithium. Since lithium is specified by Japanese law as a dangerous substance, countermeasures which assumed a lithium leak incident and various abnormal issues are indispensable. This paper describes about the safety principles and measures for lithium leaks of the IFMIF/EVEDA lithium test loop decided under the detailed design process.
Kanemura, Takuji; Kondo, Hiroo; Sugiura, Hirokazu*; Horiike, Hiroshi*; Yamaoka, Nobuo*; Furukawa, Tomohiro; Ida, Mizuho; Matsushita, Izuru*; Nakamura, Kazuyuki
Proceedings of 19th International Conference on Nuclear Engineering (ICONE-19) (CD-ROM), 7 Pages, 2011/10
Regarding R&Ds on the International Fusion Materials Irradiation Facility (IFMIF), validation of hydraulic stability of a liquid Li jet simulating the IFMIF Li target is of crucial importance and thus, is planned to be performed using EVEDA Li test loop. This paper presents diagnostics of the Li jet to be implemented in validation tests of the jet stability. In the tests, the following physical parameters need to be measured; thickness of the jet; height, length and frequency of free-surface waves; and Li evaporation rate. A high-speed video (HSV) camera is planned to be used for understanding of detailed structure of free-surface waves, and the HSV images are to be analyzed to obtain wave velocity and frequency. To measure jet thickness and wave height, a contact-type liquid level sensor is to be used. With regard to Li evaporation rate, deposition of Li on the specimens installed near the free surface is to be measured. In addition, frequency change of a crystal quartz will be utilized.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Iuchi, Hiroshi; Ida, Mizuho; Watanabe, Kazuyoshi; Kanemura, Takuji; Horiike, Hiroshi*; Yamaoka, Nobuo*; Matsushita, Izuru*; et al.
Proceedings of 19th International Conference on Nuclear Engineering (ICONE-19) (CD-ROM), 7 Pages, 2011/10
Engineering Validation and Engineering Design Activities (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF) were started from July 2007 under an international agreement called ITER Broader Approach. As a major Japanese activity, EVEDA Li test loop (ELTL) to simulate hydraulic and impurity conditions of IFMIF has already designed and is under construction, in which feasibility of hydraulic stability of the liquid Li target, the purification systems of hot traps are major key issues to be validated in this loop. This paper presents the engineering design of the main electro-magnetic pump of the ELTL including the pressure drop calculation and evaluation of the cavitation inception.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Ida, Mizuho; Matsushita, Izuru*; Horiike, Hiroshi*; Kanemura, Takuji; Sugiura, Hirokazu*; Yagi, Juro*; Suzuki, Akihiro*; et al.
Journal of Engineering for Gas Turbines and Power, 133(5), p.052910_1 - 052910_6, 2010/12
Times Cited Count:7 Percentile:37.44(Engineering, Mechanical)As a major Japanese activity for the IFMIF/EVEDA, EVEDA Li Test Loop (ELTL) to simulate hydraulic and impurity conditions of IFMIF is under design and preparation for fabrication. Feasibility of hydraulic stability of the liquid Li target and the purification systems of hot traps are major key issues to be validated. This paper presents the current status of the design and construction of the EVEDA Li Test Loop. Detail designs of the loop components such as the target assembly, tanks, an electro-magnetic pump and flow meter and a cold trap for purification system are described in addition to the flow diagnostics system and the hot traps.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Nakamura, Hiroo*; Ida, Mizuho; Watanabe, Kazuyoshi; Miyashita, Makoto*; Horiike, Hiroshi*; Yamaoka, Nobuo*; Kanemura, Takuji; et al.
Proceedings of 23rd IAEA Fusion Energy Conference (FEC 2010) (CD-ROM), 8 Pages, 2010/10
The Engineering Validation and Engineering Design Activity (EVEDA) for the International Fusion Materials Irradiation Facility (IFMIF) is proceeded as one of the ITER Broader Approach (BA) activities. The EVEDA Li test loop (ELTL) is aimed at validating stability of the Li target and feasibility of a Li purification system as the key issues. In this paper, the design of the ELTL especially of a target assembly in which the Li target is produced by the contraction nozzle is presented.
Kondo, Hiroo; Furukawa, Tomohiro; Hirakawa, Yasushi; Matsushita, Izuru*; Ida, Mizuho; Horiike, Hiroshi*; Kanemura, Takuji; Sugiura, Hirokazu*; Yagi, Juro*; Suzuki, Akihiro*; et al.
Proceedings of 18th International Conference on Nuclear Engineering (ICONE-18) (CD-ROM), 9 Pages, 2010/05
IFMIF is a neutron source aimed at producing an intense high energy neutron flux for testing candidate fusion reactor materials. Under Broader Approach activities, Engineering Validation and Engineering Design Activities (EVEDA) of IFMIF started on July 2007. Regarding to the lithium (Li) target facility, design and construction of EVEDA Li Test Loop is a major activity and is in progress. The detail design was started at the early 2009. Fabrication of the loop was started at middle of 2009, and completion is planned at the end of Feb. 2011.
Sakanaka, Shogo*; Akemoto, Mitsuo*; Aoto, Tomohiro*; Arakawa, Dai*; Asaoka, Seiji*; Enomoto, Atsushi*; Fukuda, Shigeki*; Furukawa, Kazuro*; Furuya, Takaaki*; Haga, Kaiichi*; et al.
Proceedings of 1st International Particle Accelerator Conference (IPAC '10) (Internet), p.2338 - 2340, 2010/05
Future synchrotron light source using a 5-GeV energy recovery linac (ERL) is under proposal by our Japanese collaboration team, and we are conducting R&D efforts for that. We are developing high-brightness DC photocathode guns, two types of cryomodules for both injector and main superconducting (SC) linacs, and 1.3 GHz high CW-power RF sources. We are also constructing the Compact ERL (cERL) for demonstrating the recirculation of low-emittance, high-current beams using above-mentioned critical technologies.
Matsushita, Tomohiro*; Guo, F. Z.*; Agui, Akane; Matsui, Fumihiko*; Daimon, Hiroshi*
Materia, 45(11), p.791 - 796, 2006/11
no abstracts in English
Agui, Akane; Mizumaki, Masaichiro*; Asahi, Toru*; Sayama, Junichi*; Matsumoto, Koji*; Morikawa, Tsuyoshi*; Matsushita, Tomohiro*; Osaka, Tetsuya*; Miura, Yoshimasa*
Journal of Alloys and Compounds, 408-412, p.741 - 745, 2006/02
Times Cited Count:7 Percentile:45.51(Chemistry, Physical)no abstracts in English
Tanaka, Hitoshi*; Takao, Masaru*; Matsushita, Tomohiro*; Aoyagi, Hideki*; Takeuchi, Masao*; Agui, Akane; Yoshigoe, Akitaka; Nakatani, Takeshi
Hoshako, 19(1), p.27 - 32, 2006/01
no abstracts in English