Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kawamura, Masato*; Chishiro, Etsuji; Hori, Toshihiko; Shinozaki, Shinichi; Sato, Fumiaki; Fukui, Yuji*; Futatsukawa, Kenta*; Yamazaki, Masayoshi*; Sagawa, Ryu*; Miyajima, Noriyuki*; et al.
Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.605 - 607, 2014/06
This report describes the present status of the klystron power supply systems for the J-PARC linac. The systems for the 181 MeV linac were operated from September to May. A few breakdowns were occurred, and are described in this report. The new systems for the upgrade of the linac from 181MeV to 400 MeV have been installed until now, and the 3 HVDCPSs and the 3 anode modulators of the new systems have been operated. All the systems for 400 MeV linac will be operated in this autumn.