JAEA Reports

Fuel Unloading Operations -2019- in the decommissioning of prototype fast breeder reactor "Monju"

Yabe, Takanori; Murakami, Makio; Shiota, Yuki; Isobe, Yuta; Shiohama, Yasutaka; Hamano, Tomoharu; Takagi, Tsuyohiko; Nagaoki, Yoshihiro

JAEA-Technology 2022-002, 66 Pages, 2022/07

JAEA-Technology-2022-002.pdf:10.45MB

In the first stage of "Monju" decommissioning project, "Fuel Unloading Operations" have been carrying out. The operations consists of two processes. The first process is "Fuel Treatment and Storage" is that the fuel assemblies unloaded from the Ex-Vessel fuel Storage Tank are canned after sodium cleaning, and then transferred to the storage pool. The second process is "Fuel Unloading" that the fuel assemblies in the reactor core are replaced with dummy fuel assemblies and stored in the Ex-Vessel fuel Storage Tank. "Fuel Treatment and Storage" and "Fuel Unloading" are performed alternately until 370 fuel assemblies in the core and 160 fuel assemblies in the Ex-Vessel fuel Storage Tank are all transferred to the storage pool. In fiscal 2018, as "Fuel Treatment and Storage", 86 fuel assemblies were transferred to the storage pool. As "Fuel Unloading", 76 dummy fuel assemblies were stored in the Ex-Vessel fuel Storage Tank. In fiscal 2019, as "Fuel Unloading", 60 fuel assemblies and 40 blanket fuel assemblies were unloaded from the core. These assemblies were stored in the Ex-Vessel fuel Storage Tank, and dummy fuel assemblies were loaded into the core instead. During these operations, a total of 38 cases of alarming or equipment malfunctions classified into 24 types occurred. However, no significant events that menaces to safety have occurred. The operations were continued safely by removing the direct factors for the malfunctions in the equipment operation and performance.

JAEA Reports

Fuel unloading work in decommissioning of the prototype fast breeder reactor Monju; Fuel treatment and storage work in 2018 and 2019

Shiota, Yuki; Yabe, Takanori; Murakami, Makio; Isobe, Yuta; Sato, Masami; Hamano, Tomoharu; Takagi, Tsuyohiko; Nagaoki, Yoshihiro

JAEA-Technology 2022-001, 117 Pages, 2022/07

JAEA-Technology-2022-001.pdf:25.55MB

In the first stage of Monju decommissioning project, fuel unload work began to be carried out. There are two tasks in this work. One is fuel treatment and storage work that gets rid of sodium on the fuel assemblies unloaded from Ex-Vessel fuel Storage Tank (EVST) and carries it in the storage pool, and the other is fuel unloading that the fuel assemblies in the reactor core is replaced with dummy fuels and stored in EVST. Fuel treatment and storage work and fuel unloading work are performed alternately, and 370 bodies in the core and 160 pieces in EVST are all carried to the storage pool. 86 fuel assemblies was carried to the storage pool in fuel treatment and storage work in 2018 and 76 dummy fuels were stored in EVST for fuel unloading work. During the work, 86 types and 232 alarms / malfunctions occurred, but there was no impact on safety. There was one equipment's failure at gripper's claw open / close clutch of ex-vessel fuel transfer machine B, but it was repaired and restarted. Also it was eliminated the cause of problem or concession that the equipment failure due to the sticking of the sodium compound and continuous use of the equipment. Some problems related to system control occurred, but the work was done after checking the safety. With estimation of various troubles, reduction of frequency of trouble occurrence and minimization of impacts on schedule performed.