Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Design and renovation of heat transport system in the experimental fast reactor JOYO

Sumino, Kozo; Ashida, Takashi; Kawahara, Hirotaka; Ichige, Satoshi; Isozaki, Kazunori; Nakai, Satoru

Proceedings of Operating Nuclear Facility Safety(2004ONFS),p204-216, p.204 - 216, 2004/11

None

JAEA Reports

MK-III Function Tests in JOYO; Primary main Cooling Pump

Isozaki, Kazunori; Saito, Takakazu; Sumino, Kozo; Yamazaki, Yuji*; Karube, Koji; Terano, Toshihiro; Sakaba, Hideo; Nakai, Satoru

JNC TN9410 2004-014, 162 Pages, 2004/06

JNC-TN9410-2004-014.pdf:48.0MB

This technical report describes MK-III function tests on the primary main cooling pump. MK-III function tests (SKS-1) before MK-III core configuration completed from October 17, 2001 to October 23, 2001. MK-III function tests (SKS-2) after MK-III core configuration completed from January 27, 2003 to February 13, 2003. The results of function tests were shown as follows; (1) The primary main pump was confirmed to do stable control on both CAS (cascade) mode and MAN (manual) mode in the flow control system. And also this was confirmed no-emanation trend both flow and revolution per minute against flow step response, too. (2) The main motor was shifted run-back operation in about 54 seconds after scram. Run-back operation of the main motor (A) was 167m3/h with 117 rpm. 185 m$$^{3}$$/h with 118 rpm was the main motor (B). And they were controlled within the limit of run-back operational revolution 122 rpm $$pm$$ 8 rpm. The flow was confirmed to maintain in 10 percent and over of the rated flow. (3) Succeeding operation to the pony motor was confirmed to do in about 39 seconds after the primary main pump trip. The pony motor (A) operation was 180m3/h with 124rpm. 190 m$$^{3}$$/h with 123 rpm was the pony motor (B). They were enough satisfied with the forgiven revolution per minute which was 93 rpm and over. And the flow was confirmed to maintain in 10 percent and over of the rated flow. (4) Free flow coast down characteristic of the primary main pump was confirmed that time constant was 10 seconds at both the trip and run-back operation time of the primary main pump. (5) Over flow column sodium level of the main pump duty operation was NL-1,550 mm Na by column (A), NL-1,468mm Na by column (B). They were smaller than NL-1,581 mm Na by the design value. Pressure loss value of the new IHX had more conservative value than the design value. (6) The primary main pump was confirmed which the rated flow could be restored no-scram by the instantaneous power loss within 0.6 second.

Journal Articles

The Pressure tube inspection and integrity evalution in Fugen

Ishizuka, Nobuo; Takayama, Koichi; Nakai, Kozo

Proceedings of International Conference on Global Environment and Advanced Nuclear Power Plants (GENES4/ANP 2003) (Internet), 0 Pages, 2003/00

None

3 (Records 1-3 displayed on this page)
  • 1