Kobayashi, Hideharu; Naruse, Keiji; Hirako, Kazuhito; Sawazaki, Hiromasa; Goto, Takehiro; Obata, Ikuhito; Matsui, Kazuaki
Proceedings of 31st International Conference on Nuclear Engineering (ICONE31) (Internet), 9 Pages, 2024/11
The prototype fast breeder reactor MONJU is a loop-type sodium-cooled nuclear reactor to be decommissioned in Japan. Japan Atomic Energy Agency (JAEA) started decommissioning of MONJU in 2018, and will complete four phases of the decommissioning in about 30 years. The first Phase is the Fuel Assembly Removal Period, during which secondary sodium was drained, the fuel assemblies in the reactor core were removed and put in the storage in the spent fuel pool, and the distribution of contamination in buildings, components, equipment, etc. was evaluated. In the second Phase, the Preparation for dismantling period, the neutron shields in the reactor core will be moved and put in the storage in the spent fuel pool in preparation for the dismantling of the sodium equipment, the transport of sodium, and the dismantling and removal of the water and steam power generation system. We also continue to assess the distribution of contamination in buildings, components, equipments, etc. The third Phase is the Decommissioning Period I, which includes the dismantling of sodium equipment, the transport of spent fuel, and the removal of the water and steam power generation equipment. The final Phase is the Decommissioning Period II. The radiation controlled area will be freed and all the buildings will be dismantled and removed. This paper provides an overview of MONJU decommissioning, the results of its First Phase, and details of the second Phase, which is currently underway.
Naruse, Keiji; Matsui, Kazuaki; Obata, Ikuhito; Sawazaki, Hiromasa; Goto, Takehiro; Jo, Takahisa
no journal, ,
no abstracts in English
Nishino, Yuki; Kuramoto, Shimpei; Naruse, Keiji; Nishino, Hajime; Goto, Takehiro; Takeuchi, Toru
no journal, ,
no abstracts in English
Ono, Fumiyasu; Fukushima, Tsubasa; Naruse, Keiji; Matsui, Kazuaki; Obata, Ikuhito; Sawazaki, Hiromasa; Goto, Takehiro; Jo, Takahisa; Uchihashi, Masaya
no journal, ,
By storing fuel assemblies in the fuel pond in Phase 1, MONJU eliminates the residual risk of fuel assemblies remaining in the core, which holds chemically active liquid sodium, and from April 2023, Have moved to Phase 2 of decommissioning. As the decommissioning progresses, plant risks will continue to change. Therefore, we will organize the plant status at each Phase of decommissioning and formulate the concept of performance maintenance facilities for MONJU, which will be necessary in Phase 2, and Performance maintenance facilities were Reconsidered.