Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

On maximizing the ICRF antenna loading for ITER plasmas

Mayoral, M.-L.*; Bobkov, V.*; Colas, L.*; Goniche, M.*; Hosea, J.*; Kwak, J. G.*; Pinsker, R.*; Moriyama, Shinichi; Wukitch, S.*; Baity, F. W.*; et al.

Proceedings of 23rd IAEA Fusion Energy Conference (FEC 2010) (CD-ROM), 11 Pages, 2011/03

For any given ICRF antenna design for ITER, the maximum achievable power strongly depends on the density profiles in the SOL. It has been suggested that gas injection can be used to modify the SOL profiles and thus minimize the sensitivity of the ICRF coupling to variations in the density at the edge of the confined plasma. Recently joint experiments coordinated by the ITPA were performed to characterize further this method. An increase in SOL density during gas injection led to improved coupling for all tokamaks in this multi-machine comparison. The effectiveness of using gas injection over a wide range of conditions, as a tool to tailor the edge density in front of the ICRF antennas, is documented for different gas inlet location and plasma configurations. In addition, any deleterious effects on the confinement and interaction with the antenna near-field are not investigated.

Journal Articles

Progress on the heating and current drive systems for ITER

Jacquinot, J.*; Albajar, F.*; Beaumont, B.*; Becoulet, A.*; Bonicelli, T.*; Bora, D.*; Campbell, D.*; Chakraborty, A.*; Darbos, C.*; Decamps, H.*; et al.

Fusion Engineering and Design, 84(2-6), p.125 - 130, 2009/06

 Times Cited Count:24 Percentile:82.29(Nuclear Science & Technology)

The electron cyclotron (EC), ion cyclotron (IC), neutral beam (NB) and, lower hybrid (LH) systems for ITER have been reviewed in 2007/2008 in light of progress of physics and technology. Although the overall specifications are unchanged, notable changes have been approved. Firstly, the full 73MW should be commissioned and available on a routine basis before the D/T phase. Secondly, the possibility to operate the NB at full power during the hydrogen phase requiring new shine through protection; IC with 2 antennas with increased robustness; 2 MW transmission systems to provide an easier upgrading of the EC power; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognized.

2 (Records 1-2 displayed on this page)
  • 1