Rodriguez, D.; Tanigawa, Masafumi; Nishimura, Kazuaki; Mukai, Yasunobu; Nakamura, Hironobu; Kurita, Tsutomu; Takamine, Jun; Suzuki, Satoshi*; Sekine, Megumi; Rossi, F.; et al.
Journal of Nuclear Science and Technology, 55(7), p.792 - 804, 2018/07
Times Cited Count:0 Percentile:0.01(Nuclear Science & Technology)Nuclear material in reprocessing facilities is safeguarded by random sample verification with additional continuous monitoring applied to solution masses and volume in important tanks to maintain continuity-of-knowledge of process operation. Measuring the unique rays of each solution as the material flows through pipes connecting all tanks and process apparatuses could potentially improve process monitoring by verifying the compositions in real time. We tested this
ray pipe-monitoring method using plutonium-nitrate solution transferred between tanks at the PCDF-TRP. The
rays were measured using a lanthanum-bromide detector with a list-mode data acquisition system to obtain both time and energy of
-ray. The analysis and results of this measurement demonstrate an ability to determine isotopic composition, process timing, flow rate, and volume of solution flowing through pipes, introducing a viable capability for process monitoring safeguards verification.
Mukai, Yasunobu; Nakamichi, Hideo; Kobayashi, Daisuke; Nishimura, Kazuaki; Fujisaku, Sakae; Tanaka, Hideki; Isomae, Hidemi; Nakamura, Hironobu; Kurita, Tsutomu; Iida, Masayoshi*; et al.
Proceedings of 2017 International Congress on Advances in Nuclear Power Plants (ICAPP 2017) (CD-ROM), 8 Pages, 2017/04
TRP has stored the plutonium in solution state for long-term since the last PCDF operation in 2007 was finished. After the great east Japan earthquake in 2011, JAEA had investigated the risk against potential hazard of these solutions which might lead to make hydrogen explosion and/or boiling of the solution accidents with the release of radioactive materials to the public when blackout. To reduce the risk for storing Pu solution (about 640 kg Pu), JAEA planned to perform the process operation for the solidification and stabilization of the solution by converted into MOX powder at PCDF in 2013. In order to perform PCDF operation without adaption of new safety regulation, JAEA conducted several safety measures such as emergency safety countermeasures, necessary security and safeguards (3S) measures with understanding of NRA. As a result, the PCDF operation had stared on 28th April, 2014, and successfully completed to convert MOX powder on 3rd August, 2016 for about 2 years as planned.
Nishimura, Kazuaki; Kato, Yoshiyuki; Kimura, Yuichi; Yoshimoto, Katsunobu; Komatsuzaki, Mai*; Kawasaki, Satoshi*
no journal, ,
no abstracts in English
Numata, Shinji; Nishimura, Kazuaki; Nakamichi, Hideo; Tanaka, Hideki; Kurita, Tsutomu
no journal, ,
no abstracts in English
Nishimura, Kazuaki; Tanaka, Hideki; Kobayashi, Daisuke; Suzuki, Shohei; Numata, Shinji; Nakamichi, Hideo; Kurita, Tsutomu; Iida, Masayoshi*; Tajiri, Kazuma*; Sukegawa, Katsumi*
no journal, ,
no abstracts in English