Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kamiya, Junichiro; Abe, Kazuhide; Fujimori, Shinichi; Fukuda, Tatsuo; Kobata, Masaaki; Morohashi, Yuko; Tsuda, Yasutaka; Yamada, Ippei; Yoshigoe, Akitaka
e-Journal of Surface Science and Nanotechnology (Internet), 22(4), p.316 - 326, 2024/08
The activation and deterioration mechanisms of the Ti-Zr-V non-evaporable getter (NEG) coating have been investigated. Operando analysis of the surface chemical composition change of the Ti-Zr-V coating was performed by the synchrotron radiation photoelectron spectroscopy (SRPES) during the process of raising the sample temperature to 250
C, corresponding to the activation process of NEG coating. The surface oxidation process was also characterized by the SRPES during the injection of O_2 gas into the chamber while keeping the sample temperature at 250
C, corresponding to the deterioration process of NEG coating, i.e. surface oxidation and oxygen diffusion to the coating interior. The depth profile of the oxidized sample was measured with X-ray photoelectron spectroscopy. The results shows, in the activation process, the surface Zr gets the oxygen from the oxides of Ti and V at the first stage, resulting in the metallic Ti and V on the surface, and the oxygen of the Zr-oxide and/or Zr sub-oxides diffuse to the interior of the coating in the continuous temperature rise, resulting in the metallic Zr on the surface. It is further suggested that the deterioration of the Ti-Zr-V NEG coating means the Zr and secondary Ti are oxidized deep into the coating, resulting in the restriction of the oxygen migration from the NEG compositions on the surface and consequently the lack of surface metallization.
Nakano, Hideto; Fuwa, Yasuhiro; Shinozaki, Shinichi; Mizobata, Satoshi*
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.577 - 578, 2023/11
In the J-PARC linac, klystrons are used as RF source. To improve the stability of RF power supply, the replacement of klystrons with semiconductor amplifiers is under consideration. Since the output of a semiconductor amplifier is relatively small, klystrons were installed in high power sections. Progresses of semiconductor production technology have allowed to manufacture semiconductor amplifiers that are expected be practical use. In the J-PARC linac, the installation in a debuncher 2 cavity with relatively small output power is planed. Characteristics test of a prototype semiconductor amplifier were conducted before full scale installation.
P
studied by soft X-ray photoemission spectroscopyKawasaki, Ikuto; Kobata, Masaaki; Fujimori, Shinichi; Takeda, Yukiharu; Yamagami, Hiroshi; Hedo, Masato*; Nakama, Takao*; Onuki, Yoshichika*
Physical Review B, 104(16), p.165124_1 - 165124_8, 2021/10
Times Cited Count:1 Percentile:4.12(Materials Science, Multidisciplinary)Fuwa, Yasuhiro; Ono, Ayato; Takayanagi, Tomohiro; Shinozaki, Shinichi; Mizobata, Satoshi*; Fang, Z.*
Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.780 - 782, 2020/09
In the J-PARC linac, High Voltage DC power supplies (HVDC) to drive klystrons. These HVDCs are modulating-anode power supplies with a rated voltage of 110 kV and are operated by connecting up to four klystrons to a single HVDC. Since multiple klystrons are driven by a single HVDC, a voltage droop in the capacitor bank of the HVDC occurs in the beam pulse. This effect causes a decrease in the output power of the klystron. Half of the existing HVDC in J-PARC were installed at the J-PARC construction, and the other half were installed at the LINAC 400 MeV upgrade, and the capacitors show signs of age-related degradation. In the near future, the capacitors will be necessary to be replaced partially or completely. On the replacement of the capacitors, it will be necessary to re-evaluate the operating behavior of the HVDC when the capacitor bank configuration is changed. In this presentation, we evaluated the effect of the voltage droop on the klystron with the present configuration and the effect of changing the capacitor bank configuration with numerical and experimental results, and we discussed the countermeasure for the stable beam operation.
studied by soft X-ray angle-resolved photoemission spectroscopyKawasaki, Ikuto; Kobata, Masaaki; Fujimori, Shinichi; Takeda, Yukiharu; Yamagami, Hiroshi; Nakamura, Ai*; Iha, Wataru*; Hedo, Masato*; Nakama, Takao*; Onuki, Yoshichika*
Journal of the Physical Society of Japan, 89(4), p.044704_1 - 044704_6, 2020/04
Times Cited Count:3 Percentile:23.86(Physics, Multidisciplinary)Fuwa, Yasuhiro; Shinozaki, Shinichi; Chishiro, Etsuji; Hirane, Tatsuya; Fang, Z.*; Fukui, Yuji*; Futatsukawa, Kenta*; Mizobata, Satoshi*; Iwama, Yuhei*; Sato, Yoshikatsu*; et al.
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.611 - 613, 2019/10
In the J-PARC linac, a proton accelerator is operated using 45 units of 324 MHz and 972 MHz klystrons. In the future stabilization and advancement of the accelerator, it is important to acquire the klystron output characteristics near the maximum output accurately. In order to understand this characteristics, measurement of the characteristics of the replaced klystron for some reason such as discharge, as well as the new klystron. However, such measurements have not been performed because of the risk of damage including peripheral equipment due to discharge and the temporal interference with the operation of the accelerator. Therefore, we set up a klystron test stand in the linac building and measured the high-voltage characteristics and input/output characteristics of the klystron under various operating parameters. By using this measurement result, the characteristics of klystron can be obtained before installation, and it becomes possible to determine the optimum operation parameters and make effective plan of klystron replacements. In addition, basic data for predicting the degradation tendency of klystron was acquired by comparing the characteristics of the used and used klystron.
states of uranium compounds revealed by 4
-5
resonant photoelectron spectroscopyFujimori, Shinichi; Kobata, Masaaki; Takeda, Yukiharu; Okane, Tetsuo; Saito, Yuji; Fujimori, Atsushi; Yamagami, Hiroshi; Haga, Yoshinori; Yamamoto, Etsuji; Onuki, Yoshichika*
Physical Review B, 99(3), p.035109_1 - 035109_5, 2019/01
Times Cited Count:14 Percentile:51.99(Materials Science, Multidisciplinary)Futatsukawa, Kenta*; Fang, Z.*; Fukui, Yuji*; Shinozaki, Shinichi; Mizobata, Satoshi; Sato, Yoshikatsu*
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.486 - 489, 2017/12
In the J-PARC linac, the LLRF systems consist of twenty-four 324-MHz systems and twenty-five 972-MHz systems for ACS cavities. The 324-MHz LLRF systems, which were installed in the stations of RFQ, DTLs, and SDTLs, have been used since the beginning of the J-PARC and are more than ten years into the development. Realistically speaking, the incensement of the failure frequency for these systems is expected. Additionally, it is difficult to maintain those for some discontinued boards of a digital feedback (DFB) and a digital feedforward (DFF) at cPCI, and the older OS and developing environment of software. Therefore, we are starting to study the new LLRF system of the next generation. In the present, we are exploring several possibilities of a new way and investigating each advantage and disadvantage. The project and the status of the development for the new system in the J-PARC linac LLRF are introduced.
(
=Al, Ga, and In) studied by photoelectron spectroscopyFujimori, Shinichi; Kobata, Masaaki; Takeda, Yukiharu; Okane, Tetsuo; Saito, Yuji; Fujimori, Atsushi; Yamagami, Hiroshi; Haga, Yoshinori; Yamamoto, Etsuji; Onuki, Yoshichika*
Physical Review B, 96(11), p.115126_1 - 115126_10, 2017/09
Times Cited Count:7 Percentile:31.29(Materials Science, Multidisciplinary)
Si
studied by angle-resolved photoelectron spectroscopy; Elucidating the contribution of U 5
states in URu
Si
Fujimori, Shinichi; Kobata, Masaaki; Takeda, Yukiharu; Okane, Tetsuo; Saito, Yuji; Fujimori, Atsushi; Yamagami, Hiroshi; Matsumoto, Yuji*; Yamamoto, Etsuji; Tateiwa, Naoyuki; et al.
Physical Review B, 96(12), p.125117_1 - 125117_9, 2017/09
Times Cited Count:12 Percentile:46.29(Materials Science, Multidisciplinary)Kondo, Yasuhiro; Asano, Hiroyuki*; Chishiro, Etsuji; Hirano, Koichiro; Ishiyama, Tatsuya; Ito, Takashi; Kawane, Yusuke; Kikuzawa, Nobuhiro; Meigo, Shinichiro; Miura, Akihiko; et al.
Proceedings of 28th International Linear Accelerator Conference (LINAC 2016) (Internet), p.298 - 300, 2017/05
We have constructed a linac for development of various accelerator components at J-PARC. The ion source is same as the J-PARC linac's, and the RFQ is a used one in the J-PARC linac. The beam energy is 3 MeV and nominal beam current is 30 mA. The accelerator has been already commissioned, and the first development program, laser-charge-exchange experiment for the transmutation experimental facility, has been started. In this paper, present status of this 3-MeV linac is presented.
-Ti
O
and
-Ti
O
studied by hard X-ray photoelectron spectroscopyKobayashi, Keisuke*; Taguchi, Munetaka*; Kobata, Masaaki; Tanaka, Kenji*; Tokoro, Hiroko*; Daimon, Hiroshi*; Okane, Tetsuo; Yamagami, Hiroshi; Ikenaga, Eiji*; Okoshi, Shinichi*
Physical Review B, 95(8), p.085133_1 - 085133_7, 2017/02
Times Cited Count:20 Percentile:63.40(Materials Science, Multidisciplinary)Hori, Toshihiko*; Shinozaki, Shinichi; Sato, Yoshikatsu; Mizobata, Satoshi; Fukui, Yuji*; Futatsukawa, Kenta*
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.429 - 432, 2016/11
The triode klystrons with a modulating anode have been used for the J-PARC linac. Recently, we exchanged four klystrons due to the frequent discharge at a modulating anode in the klystron tube. In order to understand the discharge mechanism and to estimate the time to replace the klystron, we need to monitor the long term performance of the klystron such as the degradation of a cathode emission current and the RF gain of the klystron tube and so on. Therefore, we started to develop the klystron perveance and gain monitor module (NIM Standard one). In this paper, we will present the design concept of the monitor module, and the first performance test result using the module prototype.
Hirano, Koichiro; Asano, Hiroyuki; Ishiyama, Tatsuya; Ito, Takashi; Okoshi, Kiyonori; Oguri, Hidetomo; Kondo, Yasuhiro; Kawane, Yusuke; Kikuzawa, Nobuhiro; Sato, Yoshikatsu; et al.
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.310 - 313, 2016/11
We have used a beam scraper with the incident angle of 65deg to reduce the beam power deposition density in the MEBT between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC linac. The 65
scraper was irradiated by the H
beam up to particle number of 1.47E22. We observed a lot of surface projections with several hundred micrometers high in the beam irradiation damage on the scraper by using the laser microscope. In order to study the limits of scrapers, we constructed a new 3 MeV linac at J-PARC. We will conduct the scraper irradiation test at the end of this year.
Futatsukawa, Kenta*; Kobayashi, Tetsuya*; Sato, Yoshikatsu; Shinozaki, Shinichi; Fang, Z.*; Fukui, Yuji*; Mizobata, Satoshi; Michizono, Shinichiro*
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.327 - 331, 2016/11
In the J-PARC linac, an intermediate-pulse with the comb-like structure is shaped by kicking an unwanted beam by the chopper cavity. Therefore, the cavities lying downstream of the RF-chopper have the beam loading with this beam shape. The present feedforward system which assumes the averaged beam current and not the comb-like beam was operated in the present LLRF, because the beam current in the linac was lower than the design value. However, it has been difficult that the required precision for the RF system is satisfied with increasing beam current. Thus, we performed the beam study of the beam loading compensation with the same shapes as the intermediate-pulses. The positive results for the cavities of SDTL and DTL with high Q values were obtained compared to the present system. On the other hand, when this compensation system was used in the case of ACS cavities, the neighbor modes were excited by the input RF. We have to improve the FF system for the operation against the real beam.
studied by photoelectron spectroscopyKobata, Masaaki; Fujimori, Shinichi; Takeda, Yukiharu; Okane, Tetsuo; Saito, Yuji; Kobayashi, Keisuke*; Yamagami, Hiroshi; Nakamura, Ai*; Hedo, Masato*; Nakama, Takao*; et al.
Journal of the Physical Society of Japan, 85(9), p.094703_1 - 094703_6, 2016/09
Times Cited Count:21 Percentile:72.56(Physics, Multidisciplinary)Usui, Shinichi; Mihara, Takatsugu; Obata, Hiroyuki; Kotake, Shoji
Proceedings of 2008 International Congress on Advances in Nuclear Power Plants (ICAPP '08) (CD-ROM), p.512 - 518, 2008/06
Refueling operation of sodium fast reactor (SFR) is one of major technical issue due to the chemical activities and opaqueness of sodium coolant properties in comparison with that of LWR. In the Japan Atomic Energy Agency (JAEA) sodium cooled Fast Reactor (JSFR) design study, the further reliable and rational fuel handling system (FHS) has been developing based on the experience of safe and reliable fuel handling operation in the existent SFR plants. Some of advanced concepts for the FHS have being studied in order to increase economic competitiveness further by attempting reduction of the amount of the material and the refueling time, and are scheduled to execute elemental tests and/or mock-up tests to confirm their feasibilities.
Xu, Z.*; Obata, Koichi*; Itakura, Kenichi*; Yamachi, Hiroshi*; Otsu, Shinichi*; Hayano, Akira; Tsuruta, Tadahiko
Heisei-19-Nendo Shigen, Sozai Gakkai Hokkaido Shibu Sokai Oyobi Shunki Koenkai Koen Yoshishu, p.7 - 8, 2007/06
no abstracts in English
Kondo, Masaya; Nakamura, Hideo; Anoda, Yoshinari; Saishu, Sadanori*; Obata, Hiroyuki*; Shimada, Rumi*; Kawamura, Shinichi*
Proceedings of 10th International Conference on Nuclear Engineering (ICONE 10) (CD-ROM), 9 Pages, 2002/00
no abstracts in English