Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Oto, Tsutomu; Asano, Norikazu; Kawamata, Takanori; Yanai, Tomohiro; Nishimura, Arashi; Araki, Daisuke; Otsuka, Kaoru; Takabe, Yugo; Otsuka, Noriaki; Kojima, Keidai; et al.
JAEA-Review 2020-018, 66 Pages, 2020/11
A collapse event of the cooling tower of secondary cooling system in the JMTR (Japan Materials Testing Reactor) was caused by the strong wind of Typhoon No.15 on September 9, 2019. The cause of the collapse of the cooling tower was investigated and analyzed. As the result, it was identified that four causes occurred in combination. Thus, the soundness of the cooling tower of Utility Cooling Loop (UCL cooling tower), which is a wooden cooling tower installed at the same period as the cooling tower of secondary cooling system, was investigated. The items of soundness survey are to grasp the operation conditions of the UCL cooling tower, to confirm the degradation of structural materials, the inspection items and inspection status of the UCL cooling tower, and to investigate the past meteorological data. As the results of soundness survey of the UCL cooling tower, the improvement of inspection items of the UCL cooling tower was carried out and the replacement and repair of the structural materials of the UCL cooling tower were planned for safe maintenance and management of this facility. And the renewal plan of new cooling tower was created to replace the existing UCL cooling tower. This report is summarized the soundness survey of the UCL cooling tower.
Kobayashi, Yuki; Takahashi, Tetsuro; Shinozaki, Tadahiro; Ogasawara, Koji; Koizumi, Kenji; Nakajima, Yasuo
Nihon Hozen Gakkai Dai-7-Kai Gakujutsu Koenkai Yoshishu, p.161 - 166, 2010/07
The negative pressure control valve is reliable apparatus which has been used in many nuclear facilities. In recent years, there are some troubles on those valves in CPF (Chemical Reprocessing Facility) by the aged deterioration because the valves were kept using for more than 25 years after facility had operated. Therefore, we have been carrying out renewal of driving units of the valves to assure performance of negative pressure control function and to keep stability of operation of the facility. In this presentation, we report knowledge provided through the renewal work, such as the renewal procedure, the deterioration situation of components and the cause of troubles.
Ogasawara, Koji; Kaneda, Kenichiro
PNC TN841 83-02, 92 Pages, 1982/12
no abstracts in English
Ogasawara, Koji; Kaneda, Kenichiro
PNC TN841 82-57, 59 Pages, 1982/12
no abstracts in English
Miura, Makoto; ; ; Omori, Takuro; ; Tanaka, Yasumasa; Shiina, Sadamu; Ogasawara, Koji
PNC TN841 79-12, 103 Pages, 1979/03
no abstracts in English
Miura, Makoto; Nagaki, Hiroshi; Tanaka, Yasumasa; ; Ogasawara, Koji; Shiina, Sadamu; Hirose, Ikuro;
PNC TN841 76-35, 28 Pages, 1976/09
None
Miura, Makoto; *; Nagaki, Hiroshi; *; *; Ogasawara, Koji; Obara, Katsuaki; Tanaka, Yasumasa
PNC TN841 74-31, 80 Pages, 1974/08
no abstracts in English
Aose, Shinichi; Ogasawara, Koji; Nomura, Kazunori; Miyachi, Shigehiko; Ichige, Yoshiaki; Shinozaki, Tadahiro; Ouchi, Shinichi; Kitajima, Takafumi
no journal, ,
no abstracts in English
Aose, Shinichi; Kitajima, Takafumi; Ogasawara, Koji; Nomura, Kazunori; Miyachi, Shigehiko; Ichige, Yoshiaki; Shinozaki, Tadahiro; Ouchi, Shinichi; Nabemoto, Toyonobu*; Katahira, Fujio*; et al.
no journal, ,
no abstracts in English
Kobayashi, Yuki; Takahashi, Tetsuro; Shinozaki, Tadahiro; Ogasawara, Koji; Koizumi, Kenji; Nakajima, Yasuo
no journal, ,
The negative pressure control valve is reliable apparatus which has been used in many nuclear facilities. In recent years, there are some troubles on those valves in CPF (Chemical Reprocessing Facility) by the aged deterioration because the valves were kept using for more than 25 years after facility had operated. Therefore, we have been carrying out renewal of driving units of the valves to assure performance of negative pressure control function and to keep stability of operation of the facility. In this presentation, we report knowledge provided through the renewal work, such as the renewal procedure, the deterioration situation of components and the cause of troubles.
Funakoshi, Tomomasa; Ogasawara, Koji; Nakajima, Yasuo; Nomura, Kazunori
no journal, ,
no abstracts in English
Ogasawara, Koji*; Sekiguchi, Yuma*; Terai, Takayuki*; Kawamura, Hiroshi*; Tsuchiya, Kunihiko; Watanabe, Takashi*
no journal, ,
no abstracts in English