Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Zhao, Y.*; Suzuki, T.*; Iimori, T.*; Kim, H.-W.*; Ahn, J. R.*; Horio, Masafumi*; Sato, Yusuke*; Fukaya, Yuki; Kanai, T.*; Okazaki, K.*; et al.
Physical Review B, 105(11), p.115304_1 - 115304_8, 2022/03
Times Cited Count:1 Percentile:17.38(Materials Science, Multidisciplinary)no abstracts in English
Toyomori, Yuka*; Tsuji, Satoru*; Mitsuda, Shinobu*; Okayama, Yoichi*; Ashida, Shiomi*; Mori, Atsunori*; Kobayashi, Toru; Miyazaki, Yuji; Yaita, Tsuyoshi; Arae, Sachie*; et al.
Bulletin of the Chemical Society of Japan, 89(12), p.1480 - 1486, 2016/09
Times Cited Count:8 Percentile:29.47(Chemistry, Multidisciplinary)Shirai, Nobutoshi; Miura, Yasushi; Tachibana, Ikuya; Omori, Satoru; Wake, Junichi; Fukuda, Kazuhito; Nakano, Takafumi; Nagasato, Yoshihiko
JAEA-Technology 2016-007, 951 Pages, 2016/07
The periodic safety review of TRP is to confirm the safety activities and get effective additional measures the facility safety and its reliability. We implemented 4 items; for (1) evaluation of safety activity implementation, we confirmed we are adequately expanding its safety activities by the necessary documents and schemes. For (2) evaluation of status of safety activities reflecting the latest technical knowledges, we confirmed we reflect latest knowledges for improvement of safety and reliability. For (3) technical evaluation about aging degradation, we can keep the safety of the facilities important to safety and the sea discharge line, under assumption of the present maintenance, because of "focuses for aging degradation". For (4) planning measures about a 10-years-plan that the operator shall implement to keep the facility condition, by the technical evaluation, we found no additional safety plans into maintenance strategies.
Fukuda, Kazuhito; Tomioka, Kenichiro*; Omori, Satoru; Nakano, Takafumi; Nagasato, Yoshihiko
JAEA-Technology 2014-032, 566 Pages, 2014/11
The Periodic Safety Review of TRP is assessment of the validity of safety activities in order to get assurance for continuous operation by adding effective items to extract and to execute for TRP safety. We performed 4 items; for (1) evaluation of safety activity at TRP, as we confirmed organization was ordered and managed. For (2) evaluation of status of safety activities reflecting the latest knowledge, we confirmed improvement of safety was continued adequately reflecting from the experience for safety. For (3) technical review on aging for the safety related structures, systems and components, we evaluated the guaranty of safety under assumption of continuous maintenance till the next Periodic Safety Review. For (4) establishment of long term maintenance program, we found no additional activities into maintenance programs, however, for several installations we established a plan and utilized them for reliability.
Motojima, Osamu*; Yamada, Hiroshi*; Komori, Akio*; Oyabu, Nobuyoshi*; Muto, Takashi*; Kaneko, Osamu*; Kawahata, Kazuo*; Mito, Toshiyuki*; Ida, Katsumi*; Imagawa, Shinsaku*; et al.
Nuclear Fusion, 47(10), p.S668 - S676, 2007/10
Times Cited Count:34 Percentile:73.71(Physics, Fluids & Plasmas)The performance of net-current free heliotron plasmas has been developed by findings of innovative operational scenarios in conjunction with an upgrade of the heating power and the pumping/fuelling capability in the Large Helical Device (LHD). Consequently, the operational regime has been extended, in particular, with regard to high density, long pulse length and high beta. Diversified studies in LHD have elucidated the advantages of net-current free heliotron plasmas. In particular, an internal diffusion barrier (IDB) by a combination of efficient pumping of the local island divertor function and core fuelling by pellet injection has realized a super dense core as high as 510 m, which stimulates an attractive super dense core reactor. Achievements of a volume averaged beta of 4.5% and a discharge duration of 54 min with a total input energy of 1.6 GJ (490 kW on average) are also highlighted. The progress of LHD experiments in these two years is overviewed by highlighting IDB, high-beta and long pulse.
Motojima, Osamu*; Yamada, Hiroshi*; Komori, Akio*; Oyabu, Nobuyoshi*; Kaneko, Osamu*; Kawahata, Kazuo*; Mito, Toshiyuki*; Muto, Takashi*; Ida, Katsumi*; Imagawa, Shinsaku*; et al.
Proceedings of 21st IAEA Fusion Energy Conference (FEC 2006) (CD-ROM), 12 Pages, 2007/03
The performance of net-current free Heliotron plasmas has been developed by findings of innovative operational scenarios in conjunction with an upgrade of the heating power and the pumping/fueling capability in the Large Helical Device (LHD). Consequently, the operational regime has been extended, in particular, with regard to high density, long pulse length and high beta. Diversified studies in LHD have elucidated the advantages of net-current free heliotron plasmas. In particular, an Internal Diffusion Barrier (IDB) by combination of efficient pumping of the local island divertor function and core fueling by pellet injection has realized a super dense core as high as 510m, which stimulates an attractive super dense core reactor. Achievements of a volume averaged beta of 4.5 % and a discharge duration of 54-min. with a total input energy of 1.6 GJ (490 kW in average) are also highlighted. The progress of LHD experiments in these two years is overviewed with highlighting IDB, high and long pulse.
Isayama, Akihiko; Inagaki, Shigeru*; Watanabe, Kiyomasa*; Narushima, Yoshiro*; Sakakibara, Satoru*; Funaba, Hisamichi*; Ida, Katsumi*; Nagayama, Yoshio*; Yamada, Hiroshi*; Kawahata, Kazuo*; et al.
Plasma Physics and Controlled Fusion, 48(1), p.L45 - L55, 2006/04
Times Cited Count:12 Percentile:39.17(Physics, Fluids & Plasmas)no abstracts in English