Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Asano, Norikazu; Nishimura, Arashi; Takabe, Yugo; Araki, Daisuke; Yanai, Tomohiro; Ebisawa, Hiroyuki; Ogasawara, Yasushi; Oto, Tsutomu; Otsuka, Kaoru; Otsuka, Noriaki; et al.
JAEA-Technology 2021-045, 137 Pages, 2022/06
A collapse event of a cooling tower for secondary cooling system in the Japan Materials Testing Reactor (JMTR) was caused by the strong winds of Typhoon No.15 on September 9, 2019. As measures against the event, the working group for the renewal of the UCL (Utility Cooling Loop) cooling tower was established in the department of JMTR, and the integrity of the UCL cooling tower, which is the same type of wooden cooling tower as the secondary cooling tower in the JMTR, was investigated. As a result of this investigation, we have decided to replace the existing UCL cooling tower with a new cooling system. After investigations, in order to reduce the risk of collapse due to wood decay, the new cooling system was installed as a component of the air system to be managed as a performance maintenance facility after decommissioning. This report describes the design of and the evaluation results of the facility.
Oto, Tsutomu; Asano, Norikazu; Kawamata, Takanori; Yanai, Tomohiro; Nishimura, Arashi; Araki, Daisuke; Otsuka, Kaoru; Takabe, Yugo; Otsuka, Noriaki; Kojima, Keidai; et al.
JAEA-Review 2020-018, 66 Pages, 2020/11
A collapse event of the cooling tower of secondary cooling system in the JMTR (Japan Materials Testing Reactor) was caused by the strong wind of Typhoon No.15 on September 9, 2019. The cause of the collapse of the cooling tower was investigated and analyzed. As the result, it was identified that four causes occurred in combination. Thus, the soundness of the cooling tower of Utility Cooling Loop (UCL cooling tower), which is a wooden cooling tower installed at the same period as the cooling tower of secondary cooling system, was investigated. The items of soundness survey are to grasp the operation conditions of the UCL cooling tower, to confirm the degradation of structural materials, the inspection items and inspection status of the UCL cooling tower, and to investigate the past meteorological data. As the results of soundness survey of the UCL cooling tower, the improvement of inspection items of the UCL cooling tower was carried out and the replacement and repair of the structural materials of the UCL cooling tower were planned for safe maintenance and management of this facility. And the renewal plan of new cooling tower was created to replace the existing UCL cooling tower. This report is summarized the soundness survey of the UCL cooling tower.
Ebisawa, Hiroyuki; Hanakawa, Hiroki; Asano, Norikazu; Kusunoki, Hidehiko; Yanai, Tomohiro; Sato, Shinichi; Miyauchi, Masaru; Oto, Tsutomu; Kimura, Tadashi; Kawamata, Takanori; et al.
JAEA-Technology 2009-030, 165 Pages, 2009/07
The condition of facilities and machinery used continuously were investigated before the renewal work of JMTR on FY 2007. The subjects of investigation were reactor building, primary cooling system tanks, secondary cooling system piping and tower, emergency generator and so on. As the result, it was confirmed that some facilities and machinery were necessary to repair and others were used continuously for long term by maintaining on the long-term maintenance plan. JMTR is planed to renew by the result of this investigation.
Seki, Kazunari; Otsuka, Norikazu; Miyamoto, Yukihiro
no journal, ,
no abstracts in English