Refine your search:     
Report No.
 - 
Search Results: Records 1-5 displayed on this page of 5
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

JAEA Reports

Maintenance of the cooling tower of the JRR-3's secondary cooling system

Fukushima, Manabu; Owada, Minoru; Ota, Kazunori; Takeuchi, Masaki; Goto, Shingo; Imahashi, Masaki; Terakado, Yoshibumi

JAEA-Technology 2010-028, 24 Pages, 2010/09

JAEA-Technology-2010-028.pdf:1.01MB

The cooling tower of the JRR-3's secondary cooling system is used to emit the heat from the core into the atmosphere. The appropriate maintenance of the cooling tower has helped the safe and stable reactor operation. Temperature of the secondary coolant had controlled constantly by changing the number of cooling fans. But, just after the number of fans changed, the temperature changed transiently and consequently the reactor thermal power changed. In order to amend this some weakness, the control system has improved to change the speed of fans constantly. The maintenance and improvement activities with the records of inspection are compiled to be utilized for future work.

JAEA Reports

Refurbishment of helium compressor for heavy water cooling system in JRR-3

Oba, Toshinobu; Fukushima, Manabu; Takeuchi, Masaki; Uno, Yuki; Owada, Minoru; Terakado, Yoshibumi

JAEA-Technology 2010-020, 31 Pages, 2010/07

JAEA-Technology-2010-020.pdf:1.33MB

Japan research reactor No.3 (JRR-3) has a heavy water tank. The heavy water tank surrounds the reactor core to use thermalize neutrons for experiments. The heavy water cooling system removes the heat generated by $$gamma$$ ray in the heavy water reflector. The heavy water cooling system is composed of the cooling system and the helium gas system. The helium gas system has an important role of helium gas circulation. The helium gas system also has a role to recombine deuterium gas and oxygen gas. We had overhauled the helium compressor regularly and replaced consumable parts. However, in recent year, the helium compressor had sometimes stopped by the leakage of seal oil. In 2007, we refurbished the helium compressor with new one. This report describes refurbishment of helium compressor.

JAEA Reports

Improvement of efficiency on ball-cleaning method for JRR-3 heat exchanger

Ota, Kazunori; Ikekame, Yoshinori; Owada, Minoru; Fukushima, Manabu; Oba, Toshinobu; Takeuchi, Masaki; Imahashi, Masaki; Murayama, Yoji

JAEA-Technology 2008-023, 31 Pages, 2008/03

JAEA-Technology-2008-023.pdf:3.3MB

JRR-3 uses shell and tube heat exchangers. The secondary coolant flushes into the tubes and the primary coolant flows outside of the tubes. The heat exchangers are cleaned with the ball-cleaning method, which is a method to clean inside of the tubes by passing the sponge balls with secondary coolant. Decline in the performance of heat exchanger could rise temperature of the primary coolant and then influence the safe and stable reactor operation. The effective way of ball-cleaning for JRR-3 heat exchangers is examined based on past cleaning data. The results show the optimal ball size and the way to determine the cleaning time.

Journal Articles

Improvement of efficiency on ball-cleaning method for JRR-3 heat exchanger

Ota, Kazunori; Ikekame, Yoshinori; Owada, Minoru; Murayama, Yoji

UTNL-R-0466, p.7_1 - 7_10, 2008/03

JRR-3 uses shell and tube heat exchangers. The secondary coolant flushes into the tubes and the primary coolant flows outside of the tubes. The heat exchangers are cleaned with the ball-cleaning method, which is a method to clean inside of the tubes by passing the sponge balls with secondary coolant. Decline in the performance of heat exchanger could rise temperature of the primary coolant and then influence the safe and stable reactor operation. The effective way of ball-cleaning for JRR-3 heat exchangers is examined based on past cleaning data. The results show the optimal ball size and the way to determine the cleaning time.

Oral presentation

Replacement of helium compressor for heavy water cooling system in JRR-3

Oba, Toshinobu; Owada, Minoru; Fukushima, Manabu; Takeuchi, Masaki; Uno, Yuki; Murayama, Yoji

no journal, , 

no abstracts in English

5 (Records 1-5 displayed on this page)
  • 1