Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Kojima, Kunihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Chimura, Motoki; Saha, P. K.
Progress of Theoretical and Experimental Physics (Internet), 2025(1), p.013G01_1 - 013G01_19, 2025/01
Times Cited Count:0 Percentile:0.00(Physics, Multidisciplinary)A comprehensive study on the random resonances was conducted to mitigate beam losses and ensure sufficient tunability of the operating point for further beam power ramp-up in the 3-GeV rapid cycling synchrotron of the Japan Proton Accelerator Research Complex. Low-intensity beam studies revealed considerable excitation of the half-integer random resonance. This half-integer random resonance was successfully compensated using trim quadrupole magnets without exciting other higher-order resonances. By implementing a conventional theoretical procedure based on resonance driving terms, we identified the leakage field from extraction magnets as the primary source of the error field driving the random resonance. High-intensity beam studies confirmed that our resonance compensation approach substantially mitigated beam loss in higher-tune regions, making it highly effective in improving operating point tunability.
Kojima, Kunihiro; Harada, Hiroyuki; Chimura, Motoki; Saha, P. K.
Proceedings of 21st Annual Meeting of Particle Accelerator Society of Japan (Internet), p.118 - 122, 2024/10
Further beam power ramp-up going beyond the design output beam power of 1 MW is proceeding in the J-PARC RCS. In MW-class rings, the residual radioactivity accompanying the beam loss strictly limits the available beam power. While the current beam loss is mitigated to 0.1% level at the designed beam power, further beam loss mitigation prepared for the beam power ramp-up is required. The resonance crossing of the tune spread can cause unallowable beam loss. Since the beam power ramp-up definitely extends the space-charge-induced tune spread, the sufficiently wide stability region in the betatron tune map must be secured for low beam loss. We conducted low-intensity beam studies on the half-integer random resonances that likely have significant effects on the width of the stability region. Thanks to the simplification coming from the mitigation of the space-charge force, the successful compensation of the resonance is realized by using the trim quadrupole magnets. In the high-intensity beam studies, the resonance compensation was found to be beneficial in extending the stability region.
Tripathi, V.*; Bhattacharya, S.*; Rubino, E.*; Benetti, C.*; Perello, J. F.*; Tabor, S. L.*; Liddick, S. N.*; Bender, P. C.*; Carpenter, M. P.*; Carroll, J. J.*; et al.
Physical Review C, 109(4), p.044320_1 - 044320_15, 2024/04
Times Cited Count:0 Percentile:0.00(Physics, Nuclear)no abstracts in English
Yamamoto, Kazami; Moriya, Katsuhiro; Okita, Hidefumi; Yamada, Ippei; Chimura, Motoki; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Masanobu; Morishita, Takatoshi; et al.
Journal of Neutron Research, 26(2-3), p.59 - 67, 2024/01
The linac and 3 GeV rapid cycling synchrotron at the Japan Proton Accelerator Research Complex was designed to provide 1-MW proton beams to the following facilities. Thanks to the improvement works of the accelerator system, we successfully accelerate 1-MW beam with quite small beam loss. Currently, the beam power of RCS is limited by the lack of anode current in the RF cavity system rather than the beam loss. Recently we developed a new acceleration cavity that can accelerate a beam with less anode current. This new cavity enables us not only to reduce requirement of the anode power supply but also to accelerate more than 1-MW beam. We have started to consider the way to achieve beyond 1-MW beam acceleration. So far, it is expected that up to 1.5-MW beam can be accelerated after replacement of the RF cavity. We have also been continuing study to achieve up to 2 MW beam in J-PARC RCS.
Saha, P. K.; Harada, Hiroyuki; Shobuda, Yoshihiro; Tamura, Fumihiko; Okita, Hidefumi; Okabe, Kota; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; Moriya, Katsuhiro; Takayanagi, Tomohiro; et al.
Journal of Physics; Conference Series, 2687(5), p.052020_1 - 052020_7, 2024/01
Takahashi, Hiroki; Saha, P. K.; Yoshimoto, Masahiro; Sawabe, Yuki*
Journal of Physics; Conference Series, 2687(7), p.072019_1 - 072019_5, 2024/01
Times Cited Count:0 Percentile:0.00(Physics, Atomic, Molecular & Chemical)In J-PARC 3 GeV Rapid Cycling Synchrotron, the synchronized data system using reflective memory has been constructed. In order to support the requirement of using larger size data in high intensity beam operation in the future, a new synchronized data generation method has been proposed. The new method implements in the measurement system the functions performed by the high-level computer in the current system, thereby realizing synchronized data generation using data transfer via LAN. In this study, we have constructed a test bench for the new synchronized data system that implements the proposed method and verified its performance. This result leads to the development of the new synchronized data system based on data transfer via LAN. In this paper, we describe the outline of the new synchronized data generation method and the results of performance tests.
Okita, Hidefumi; Tamura, Fumihiko; Yamamoto, Masanobu; Nomura, Masahiro; Shimada, Taihei; Saha, P. K.; Yoshii, Masahito*; Omori, Chihiro*; Sugiyama, Yasuyuki*; Hasegawa, Katsushi*; et al.
Journal of Physics; Conference Series, 2687(7), p.072005_1 - 072005_7, 2024/01
Times Cited Count:0 Percentile:0.00(Physics, Atomic, Molecular & Chemical)Longitudinal phase space tomography is an effective measurement tool for acquiring the longitudinal phase space distribution. For the J-PARC synchrotrons, tomography, which can take into account the beam dynamics such as longitudinal space charge effect and nonlinearity, is desired, as the beam power increases. In this study, for the J-PARC synchrotron, the CERN's tomography, which employs the hybrid algorithm that can consider the beam dynamics for reconstruction, is introduced and benchmarked. The benchmark results show that the CERN's tomography has the ability to measure the longitudinal phase space distribution accurately, in the high-power beam operation at the J-PARC synchrotrons.
Machida, Shinji*; Huang, H.*; Saha, P. K.
Proceedings of 68th ICFA Advanced Beam Dynamics Workshop on High Intensity and High Brightness Hadron Beams (HB2023) (Internet), p.670 - 674, 2023/12
Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.937 - 941, 2023/11
In the J-PARC 3GeV Rapid Cycling Synchrotron (RCS), the 400 MeV H beam is changed to H
beam by a charge exchange foil and accelerated to 3GeV. So far, RCS had used two types of charge exchange foil. One is the HBC (Hybrid Boron mixed Carbon) foil and the other is the Kaneka GTF (Graphene Thin Film). HBC foil is a patented deposition method developed at KEK for the stable production of thick carbon foil. Initially, the RCS used HBC foil produced at KEK. However, in 2017, JAEA had started HBC foil production and has been using it since then. Recently, we have succeeded in depositing thick pure carbon foil, which had been considered difficult to produce by the arc deposition method. As a new challenge, this pure carbon foil was used in the user operation from March 2023. As a result, Pure carbon foils showed less deformation and more stable charge exchange performance than HBC and GTF.
Tamura, Fumihiko; Okita, Hidefumi; Hotchi, Hideaki*; Saha, P. K.; Meigo, Shinichiro; Yoshii, Masahito*; Omori, Chihiro*; Yamamoto, Masanobu; Seiya, Kiyomi*; Sugiyama, Yasuyuki*; et al.
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.64 - 68, 2023/11
The J-PARC 3GeV synchrotron (RCS) provides high intensity proton beams to the Materials and Life Science Experimental Facility (MLF) and the Main Ring (MR). The harmonic number (h) of the RCS is 2 and the RCS normally accelerates two bunches. For some experiments at the MLF, a single bunch is preferred. In this case, one of the rf bucket is filled with protons and the other is empty. Therefore the beam intensity is halved. If the RCS can accelerate with h=1, the intensity per bunch can be doubled, enabling to provide single bunch beams to the MLF with the maximum intensity. This possibly increases the MR beam power by injecting high intensity single bunches eight times. In this presentation, we report mainly on the consideration of h=1 acceleration in the RCS by longitudinal simulations.
Saha, P. K.; Harada, Hiroyuki; Yoneda, Hitoki*; Michine, Yurina*; Sato, Atsushi*; Shibata, Takanori*; Kinsho, Michikazu
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.59 - 63, 2023/11
Kojima, Kunihiro; Harada, Hiroyuki; Saha, P. K.
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.127 - 131, 2023/11
no abstracts in English
Yamamoto, Kazami; Moriya, Katsuhiro; Okita, Hidefumi; Yamada, Ippei; Chimura, Motoki; Saha, P. K.; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Masanobu; Morishita, Takatoshi; et al.
Proceedings of 68th ICFA Advanced Beam Dynamics Workshop on High Intensity and High Brightness Hadron Beams (HB2023) (Internet), p.270 - 273, 2023/10
The 3-GeV rapid-cycling synchrotron at the Japan Pro-ton Accelerator Research Complex was designed to provide 1-MW proton beams to the following facilities. Thanks to the improvement works of the accelerator system, we successfully accelerate 1-MW beam with quite small beam loss. Currently, the beam power of RCS is limited by the lack of anode current in the RF cavity system rather than the beam loss. Recently we developed a new acceleration cavity that can accelerate a beam with less anode current. This new cavity enables us not only to reduce requirement of the anode power supply but also to accelerate more than 1-MW beam. We have started to consider the way to achieve beyond 1-MW beam acceleration. So far, it is expected that up to 1.5-MW beam can be accelerated after replacement of the RF cavity. We have also continued study to achieve more than 2 MW beam in J-PARC RCS.
Shobuda, Yoshihiro; Harada, Hiroyuki; Saha, P. K.; Takayanagi, Tomohiro; Tamura, Fumihiko; Togashi, Tomohito; Watanabe, Yasuhiro; Yamamoto, Kazami; Yamamoto, Masanobu
Proceedings of 68th ICFA Advanced Beam Dynamics Workshop on High Intensity and High Brightness Hadron Beams (HB2023) (Internet), p.162 - 169, 2023/10
At the 3-GeV Rapid Cycling Synchrotron (RCS) within the Japan Proton Accelerator Research Complex (J-PARC), kicker impedance causes beam instability. A 1-MW beam with a large emittance can be delivered to the Material and Life Science Experimental Facility (MLF) by suppressing beam instabilities without the need for a transverse feedback system - simply by turning off the sextuple magnets. However, we require other high-intensity and high-quality beams with smaller emittances for the Main Ring (MR). To address this, we proposed a scheme for suppressing the kicker impedance using a diode stack and resistors, which effectively reduces beam instability. Importantly, these devices have a negligible effect on the extracted beam from the RCS.
Saha, P. K.; Harada, Hiroyuki; Okabe, Kota; Okita, Hidefumi; Shobuda, Yoshihiro; Tamura, Fumihiko; Yamamoto, Kazami; Yoshimoto, Masahiro; Hotchi, Hideaki*
Proceedings of 68th ICFA Advanced Beam Dynamics Workshop on High Intensity and High Brightness Hadron Beams (HB2023) (Internet), p.147 - 152, 2023/10
Saha, P. K.; Harada, Hiroyuki; Yoneda, Hitoki*; Michine, Yurina*; Sato, Atsushi*; Shibata, Takanori*; Kinsho, Michikazu; Johnson, D. E.*
Proceedings of 14th International Particle Accelerator Conference (IPAC 23) (Internet), p.2335 - 2338, 2023/09
Shobuda, Yoshihiro; Harada, Hiroyuki; Saha, P. K.; Takayanagi, Tomohiro; Tamura, Fumihiko; Togashi, Tomohito; Watanabe, Yasuhiro; Yamamoto, Kazami; Yamamoto, Masanobu
Physical Review Accelerators and Beams (Internet), 26(5), p.053501_1 - 053501_45, 2023/05
Times Cited Count:1 Percentile:30.87(Physics, Nuclear)At the Rapid Cycling Synchrotron (RCS) in Japan Proton Accelerator Research Complex (J-PARC), theoretical predictions have indicated that the kicker-impedance would excite the beam-instability. A 1 MW beam with large emittance can be delivered to the Material and Life Science Experimental Facility (MLF) through suppression of the beam instabilities by choosing the appropriate machine parameters. However, we require other high-intensity and high-quality smaller emittance beams (than the 1 MW beam) for the Main Ring (MR). Hence, we proposed a scheme for suppressing the kicker-impedance by using prototype diodes and resistors, thereby demonstrating the effect on the kicker impedance reduction. However, the J-PARC RCS must be operated with a repetition rate of 25 Hz, which urged us to consider special diodes that are tolerant to heating. After developments, we have demonstrated that the special diodes with resistors can suppress the beam instability by reducing the kicker impedance. Enhanced durability of the prototype diodes and resistors for the 25 Hz operation was also realized. Moreover, the new diodes and the resistors have negligible effect on the extracted beam from the RCS. From a simulation point of view, the scheme can be employed for at least 5 MW beam operation within the stipulated specifications.
Saha, P. K.; Okabe, Kota; Nakanoya, Takamitsu; Shobuda, Yoshihiro; Harada, Hiroyuki; Tamura, Fumihiko; Okita, Hidefumi; Yoshimoto, Masahiro; Hotchi, Hideaki*
Journal of Physics; Conference Series, 2420, p.012040_1 - 012040_7, 2023/01
Yamamoto, Kazami; Yamamoto, Masanobu; Yamazaki, Yoshio; Nomura, Masahiro; Suganuma, Kazuaki; Fujirai, Kosuke; Kamiya, Junichiro; Nakanoya, Takamitsu; Hatakeyama, Shuichiro; Yoshimoto, Masahiro; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.277 - 281, 2023/01
The J-PARC 3GeV Rapid Cycling Synchrotron (RCS) is aiming to provide the proton beam of very high power for neutron experiments and the main ring synchrotron. We have continued the beam commissioning and the output power from RCS have been increasing. In recent years, we have been trying continuous supply of 1-MW high-intensity beam, which is the design value, to a neutron target. We tried to operate continuously for over 40 hours in June 2020. However, some trouble occurred and the operation was frequently suspended. In June 2021, we tried again 1-MW operation but it was suspended due to deterioration of the cooling water performance. Last summer shutdown period, we recovered performance of the cooling water system and retried in this June. In the final case, the outside temperature became extremely high. We could not keep 1-MW power, whereas 600 kW beam was delivered in stable.
Nakanoya, Takamitsu; Yoshimoto, Masahiro; Saha, P. K.; Takeda, Osamu*; Saeki, Riuji*; Muto, Masayoshi*
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.629 - 633, 2023/01
In the J-PARC 3-GeV Rapid Cycling Synchrotron (RCS), a 400 MeV H beam injected from the linac is exchange to an H
beam by a charge exchange foil and accelerated to 3 GeV. The charge exchange foils mainly used in the RCS are HBC foil (Hybrid Boron mixed Carbon stripper foil), which are made by adding a small amount of boron to carbon rods and using them as electrodes by the arc deposition method. Since 2018, foils produced by JAEA have been used for user operation. So far, no major problems have occurred due to the foils. Meanwhile, the beam power of the RCS has been gradually increased from 500 kW to 830 kW since 2018. As beam power increases, the foil issues were identified to achieve the RCS design power of 1 MW. In this paper, we will report on the recent foil usage status and issue in the user operation.