Yoshikawa, Hiroshi; Suzuki, Takahiro; Sakaki, Hironao; Ito, Yuichi; Kato, Yuko; Kawase, Masato; Sako, Hiroyuki; Shen, G.; Takahashi, Hiroki; Fukuta, Shimpei; et al.
Proceedings of 24th International Linear Accelerator Conference (LINAC 2008) (CD-ROM), p.52 - 54, 2009/00
LINAC of J-PARC began to operate in November, 2006, and a achieved an initial performance in January, 2007. Afterwards, the beam supply to RCS begins, and it is operating extremely with stability up to now. Here, the evaluation for comparison of the design and realities of architecture and performance of the LINAC control system are shown. Especially, the conceptual idea of function arrangement in the hierarchy of the control system architecture is shown. Now, the LINAC control system is in the second phase for the high power beam and reducing the beam loss, and the analysis of the system response identification for the high precision beam control is started.
Kawase, Masato; Takahashi, Hiroki; Ito, Yuichi; Sawa, Shiori*; Sugimoto, Makoto*
Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.274 - 276, 2008/00
no abstracts in English
Yoshikawa, Hiroshi; Sakaki, Hironao; Sako, Hiroyuki; Takahashi, Hiroki; Shen, G.; Kato, Yuko; Ito, Yuichi; Ikeda, Hiroshi*; Ishiyama, Tatsuya*; Tsuchiya, Hitoshi*; et al.
Proceedings of International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS '07) (CD-ROM), p.62 - 64, 2007/10
J-PARC is a large scale facility of the proton accelerators for the multi-purpose of scientific researches in Japan. This facility consists of three accelerators and three experimental stations. Now, J-PARC is under construction, and LINAC is operated for one year, 3GeV synchrotron has just started the commissioning in this October the 1st. The completion of this facility will be next summer. The control system of accelerators established fundamental performance for the initial commissioning. The most important requirement to the control system of this facility is to minimize the activation of accelerator devices. In this paper, we show that the performances of each layer of this control system have been achieved in the initial stage.