Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Nakano, Hideto; Fuwa, Yasuhiro; Shinozaki, Shinichi; Mizobata, Satoshi*
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.577 - 578, 2023/11
In the J-PARC linac, klystrons are used as RF source. To improve the stability of RF power supply, the replacement of klystrons with semiconductor amplifiers is under consideration. Since the output of a semiconductor amplifier is relatively small, klystrons were installed in high power sections. Progresses of semiconductor production technology have allowed to manufacture semiconductor amplifiers that are expected be practical use. In the J-PARC linac, the installation in a debuncher 2 cavity with relatively small output power is planed. Characteristics test of a prototype semiconductor amplifier were conducted before full scale installation.
Ono, Ayato; Takayanagi, Tomohiro; Fuwa, Yasuhiro; Shinozaki, Shinichi; Ueno, Tomoaki*; Horino, Koki*; Sugita, Moe; Yamamoto, Kazami; Kinsho, Michikazu; Ikoma, Naoya*; et al.
Proceedings of 20th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.871 - 876, 2023/11
In J-PARC, an ignitron is used for the crowbar device of the klystron power supply to excite the RF acceleration voltage in a Linac cavity. Mercury, that is used in the ignitron, would be prohibition of use in the future due to environmental protection. Therefore, we designed a semiconductor crowbar switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3kV, 40kA, and 50us per board. Because a high voltage of 120 kV is applied on each board, we adopted a self-power supply method to supply a electricity for the control system. This method can create the electricity from a high-voltage DCDC converter. We confirmed the operating performance on a 1/2 scale (60 kV, 40 kA) of the voltage in the existing ignitron system (120 kV, 40 kA). We also studied a test circuit in a higher voltage range of more than 90 kV. Our latest result is well promising for an alternative system of ignitron.
Takayanagi, Tomohiro; Ono, Ayato; Fuwa, Yasuhiro; Shinozaki, Shinichi; Horino, Koki*; Ueno, Tomoaki*; Sugita, Moe; Yamamoto, Kazami; Oguri, Hidetomo; Kinsho, Michikazu; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.242 - 246, 2023/01
At J-PARC, semiconductor short pulse power supplies to replace kicker power supplies and semiconductor long pulse power supplies to replace klystron power supply systems are under construction. We have fabricated a 40kV/2kA/1.2s unit power supply that employs a linear transformer drivers (LTD) system for kickers. Currently, we are working on a high voltage insulating cylinder insulator that suppresses corona discharges using only the insulator structure, without using insulating oil. In addition, the MARX system was adopted for klystron power supply system. A main circuit unit for 8kV/60A/830s rectangular pulse output and an 800V/60A correction circuit unit that improves the flat top droop from 10% to 1% were manufactured. Furthermore, a 2.2kV/2.4kW high voltage SiC inverter charger has been fabricated for this MARX power supply. The presentation will report the evaluation results of each test and prospects for semiconductor pulse power supplies.
Ono, Ayato; Takayanagi, Tomohiro; Fuwa, Yasuhiro; Shinozaki, Shinichi; Ueno, Tomoaki*; Horino, Koki*; Sugita, Moe; Yamamoto, Kazami; Kinsho, Michikazu; Ikoma, Naoya*; et al.
Proceedings of 19th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.395 - 399, 2023/01
At J-PARC, an ignitron is used for the crowbar device of the klystron power supply for high-frequency acceleration of a linear accelerator. Ignitron uses mercury, which is of limited use worldwide, and is expected to be discontinued in the future. Therefore, we designed a semiconductor crowbar switch for short-circuit protection of klystron using a MOS gate thyristor. We have manufactured an oval-type board module that realizes an operating output of 3 kV, 40 kA, and 50 s per board. For the control power supply to each board module assuming a high voltage of 120 kV, we adopted a self-power supply method that creates a control power supply with a high-voltage DCDC converter from the voltage shared and charged by each board module. It was possible to confirm the operating performance on a 1/2 scale (60 kV, 40 kA) against the voltage of the existing equipment (120 kV, 40 kA) by connecting twenty oval board modules in series. The output test result will be reported.
Fuwa, Yasuhiro; Ono, Ayato; Takayanagi, Tomohiro; Shinozaki, Shinichi; Mizobata, Satoshi*; Fang, Z.*
Proceedings of 17th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.780 - 782, 2020/09
In the J-PARC linac, High Voltage DC power supplies (HVDC) to drive klystrons. These HVDCs are modulating-anode power supplies with a rated voltage of 110 kV and are operated by connecting up to four klystrons to a single HVDC. Since multiple klystrons are driven by a single HVDC, a voltage droop in the capacitor bank of the HVDC occurs in the beam pulse. This effect causes a decrease in the output power of the klystron. Half of the existing HVDC in J-PARC were installed at the J-PARC construction, and the other half were installed at the LINAC 400 MeV upgrade, and the capacitors show signs of age-related degradation. In the near future, the capacitors will be necessary to be replaced partially or completely. On the replacement of the capacitors, it will be necessary to re-evaluate the operating behavior of the HVDC when the capacitor bank configuration is changed. In this presentation, we evaluated the effect of the voltage droop on the klystron with the present configuration and the effect of changing the capacitor bank configuration with numerical and experimental results, and we discussed the countermeasure for the stable beam operation.
Kondo, Yasuhiro; Hirano, Koichiro; Ito, Takashi; Kikuzawa, Nobuhiro; Kitamura, Ryo; Morishita, Takatoshi; Oguri, Hidetomo; Okoshi, Kiyonori; Shinozaki, Shinichi; Shinto, Katsuhiro; et al.
Journal of Physics; Conference Series, 1350, p.012077_1 - 012077_7, 2019/12
Times Cited Count:1 Percentile:49.48(Physics, Particles & Fields)We have upgraded a 3-MeV linac at J-PARC. The ion source is same as the J-PARC linac's, and the old 30-mA RFQ is replaced by a spare 50-mA RFQ, therefore, the beam energy is 3 MeV and the nominal beam current is 50 mA. The main purpose of this system is to test the spare RFQ, but also used for testing of various components required in order to keep the stable operation of the J-PARC accelerator. The accelerator has been already commissioned, and measurement programs have been started. In this paper, present status of this 3-MeV linac is presented.
Fuwa, Yasuhiro; Shinozaki, Shinichi; Chishiro, Etsuji; Hirane, Tatsuya; Fang, Z.*; Fukui, Yuji*; Futatsukawa, Kenta*; Mizobata, Satoshi*; Iwama, Yuhei*; Sato, Yoshikatsu*; et al.
Proceedings of 16th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.611 - 613, 2019/10
In the J-PARC linac, a proton accelerator is operated using 45 units of 324 MHz and 972 MHz klystrons. In the future stabilization and advancement of the accelerator, it is important to acquire the klystron output characteristics near the maximum output accurately. In order to understand this characteristics, measurement of the characteristics of the replaced klystron for some reason such as discharge, as well as the new klystron. However, such measurements have not been performed because of the risk of damage including peripheral equipment due to discharge and the temporal interference with the operation of the accelerator. Therefore, we set up a klystron test stand in the linac building and measured the high-voltage characteristics and input/output characteristics of the klystron under various operating parameters. By using this measurement result, the characteristics of klystron can be obtained before installation, and it becomes possible to determine the optimum operation parameters and make effective plan of klystron replacements. In addition, basic data for predicting the degradation tendency of klystron was acquired by comparing the characteristics of the used and used klystron.
Futatsukawa, Kenta*; Fang, Z.*; Fukui, Yuji*; Shinozaki, Shinichi; Mizobata, Satoshi; Sato, Yoshikatsu*
Proceedings of 14th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.486 - 489, 2017/12
In the J-PARC linac, the LLRF systems consist of twenty-four 324-MHz systems and twenty-five 972-MHz systems for ACS cavities. The 324-MHz LLRF systems, which were installed in the stations of RFQ, DTLs, and SDTLs, have been used since the beginning of the J-PARC and are more than ten years into the development. Realistically speaking, the incensement of the failure frequency for these systems is expected. Additionally, it is difficult to maintain those for some discontinued boards of a digital feedback (DFB) and a digital feedforward (DFF) at cPCI, and the older OS and developing environment of software. Therefore, we are starting to study the new LLRF system of the next generation. In the present, we are exploring several possibilities of a new way and investigating each advantage and disadvantage. The project and the status of the development for the new system in the J-PARC linac LLRF are introduced.
Kondo, Yasuhiro; Asano, Hiroyuki*; Chishiro, Etsuji; Hirano, Koichiro; Ishiyama, Tatsuya; Ito, Takashi; Kawane, Yusuke; Kikuzawa, Nobuhiro; Meigo, Shinichiro; Miura, Akihiko; et al.
Proceedings of 28th International Linear Accelerator Conference (LINAC 2016) (Internet), p.298 - 300, 2017/05
We have constructed a linac for development of various accelerator components at J-PARC. The ion source is same as the J-PARC linac's, and the RFQ is a used one in the J-PARC linac. The beam energy is 3 MeV and nominal beam current is 30 mA. The accelerator has been already commissioned, and the first development program, laser-charge-exchange experiment for the transmutation experimental facility, has been started. In this paper, present status of this 3-MeV linac is presented.
Shinozaki, Ayako*; Komatsu, Kazuki*; Kagi, Hiroyuki*; Fujimoto, Chikako*; Machida, Shinichi*; Sano, Asami; Hattori, Takanori
Journal of Chemical Physics, 148(4), p.044507_1 - 044507_8, 2017/01
Times Cited Count:11 Percentile:47.36(Chemistry, Physical)Pressure-response on the crystal structure of deuterated -glycine was investigated at room temperature, using powder and single-crystal X-ray diffraction, and powder neutron diffraction measurements under high pressure. No phase change was observed up to 8.7 GPa, although anisotropy of the lattice compressibility was found. Neutron diffraction measurements indicated the distance of the intermolecular DO bond along with the -axis increase with compression up to 6.4 GPa. The distance of another DO bond along with the -axis decreased with increasing pressure, and became the shortest intermolecular hydrogen bond above 3 GPa. In contrast, the lengths of the bifurcated N-DO and C-DO hydrogen bonds, which are formed between the layers of the -glycine molecules along the -axis, decreased significantly with increasing pressure. The decrease of the intermolecular distances resulted in the largest compressibility of the -axis, compared to the other two axes. Hirshfeld analysis suggested that the reduction of the void region size, rather than shrinkage of the strong N-DO hydrogen bonds, occurred with compression.
Futatsukawa, Kenta*; Kobayashi, Tetsuya*; Sato, Yoshikatsu; Shinozaki, Shinichi; Fang, Z.*; Fukui, Yuji*; Mizobata, Satoshi; Michizono, Shinichiro*
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.327 - 331, 2016/11
In the J-PARC linac, an intermediate-pulse with the comb-like structure is shaped by kicking an unwanted beam by the chopper cavity. Therefore, the cavities lying downstream of the RF-chopper have the beam loading with this beam shape. The present feedforward system which assumes the averaged beam current and not the comb-like beam was operated in the present LLRF, because the beam current in the linac was lower than the design value. However, it has been difficult that the required precision for the RF system is satisfied with increasing beam current. Thus, we performed the beam study of the beam loading compensation with the same shapes as the intermediate-pulses. The positive results for the cavities of SDTL and DTL with high Q values were obtained compared to the present system. On the other hand, when this compensation system was used in the case of ACS cavities, the neighbor modes were excited by the input RF. We have to improve the FF system for the operation against the real beam.
Hirano, Koichiro; Asano, Hiroyuki; Ishiyama, Tatsuya; Ito, Takashi; Okoshi, Kiyonori; Oguri, Hidetomo; Kondo, Yasuhiro; Kawane, Yusuke; Kikuzawa, Nobuhiro; Sato, Yoshikatsu; et al.
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.310 - 313, 2016/11
We have used a beam scraper with the incident angle of 65deg to reduce the beam power deposition density in the MEBT between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC linac. The 65 scraper was irradiated by the H beam up to particle number of 1.47E22. We observed a lot of surface projections with several hundred micrometers high in the beam irradiation damage on the scraper by using the laser microscope. In order to study the limits of scrapers, we constructed a new 3 MeV linac at J-PARC. We will conduct the scraper irradiation test at the end of this year.
Hori, Toshihiko*; Shinozaki, Shinichi; Sato, Yoshikatsu; Mizobata, Satoshi; Fukui, Yuji*; Futatsukawa, Kenta*
Proceedings of 13th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.429 - 432, 2016/11
The triode klystrons with a modulating anode have been used for the J-PARC linac. Recently, we exchanged four klystrons due to the frequent discharge at a modulating anode in the klystron tube. In order to understand the discharge mechanism and to estimate the time to replace the klystron, we need to monitor the long term performance of the klystron such as the degradation of a cathode emission current and the RF gain of the klystron tube and so on. Therefore, we started to develop the klystron perveance and gain monitor module (NIM Standard one). In this paper, we will present the design concept of the monitor module, and the first performance test result using the module prototype.
Hirano, Koichiro; Kondo, Yasuhiro; Kawane, Yusuke; Shinozaki, Shinichi; Miura, Akihiko; Morishita, Takatoshi; Sawabe, Yuki; Sugimura, Takashi*; Naito, Fujio*; Fang, Z.*; et al.
Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.944 - 947, 2015/09
Two RF-deflecting cavities as a chopper and a beam scraper have been used in the MEBT1 between a 324 MHz RFQ and a 50-MeV DTL of the J-PARC Linac. We replaced with a newly fabricated RF chopper to decrease beam loss for the operation with 50 mA. We installed two new scrapers to absorb the higher power of the deflected beam by the RF chopper. This paper describes the RF chopper system and beam irradiation test results of the scraper.
Hori, Toshihiko; Shinozaki, Shinichi; Sato, Fumiaki; Fukui, Yuji*; Futatsukawa, Kenta*
Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.643 - 646, 2015/09
We are making efforts to decrease the fault rate of the high voltage power supplies for 324 MHz klystron. A new Veto module has been developed to prevent the 25 Hz trigger fan out module from malfunction due to the klystron discharge. As the result of installing the Veto module to the SDTL#16 klystron station, the klystron had never stopped for two months operation although the discharge occurred forty-two times during the operation. It confirmed that the installation of the Veto module is extremely useful to operate the klystron stably.
Futatsukawa, Kenta*; Kobayashi, Tetsuya*; Sato, Fumiaki; Shinozaki, Shinichi; Chishiro, Etsuji; Hirano, Koichiro; Fang, Z.*; Fukui, Yuji*; Hori, Toshihiko; Michizono, Shinichiro*
Proceedings of 12th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1317 - 1320, 2015/09
In the J-PARC linac, an RF deflector installed in 3-MeV Medium Energy Beam Transport (MEBT1) is used to kick the unnecessary beam and the intermediate-pulse like a comb is created. The kicked beam leads to a scraper downstream the RF deflector and lose all kinetic energy. When the beam current increases to 50 mA of the design value, the heat load of a scraper to irradiate the kicked beam increases and its surface is predicted to be damaged. Therefore, we are preparing the tandem scrapers to reduce the damage. The half of the kicked beam leads to a scraper and the residual is to the other. The chopping operation is achieved by rotating the phase of the RF deflector in the periodic cycles by the LLRF system. We will introduce the phase rotation system and the test results.
Komatsu, Kazuki*; Shinozaki, Ayako*; Machida, Shinichi*; Matsubayashi, Takuto*; Watanabe, Mao*; Kagi, Hiroyuki*; Sano, Asami; Hattori, Takanori
Acta Crystallographica Section B; Structural Science, Crystal Engineering and Materials (Internet), 71(1), p.74 - 80, 2015/02
Times Cited Count:19 Percentile:78.59(Chemistry, Multidisciplinary)Magnesium dichloride decahydrate (MgCl10HO) and its deuterated counterpart (MgCl10DO) are identified for the first time by in-situ powder synchrotron X-ray and spallation neutron diffraction. These substances are crystallized from a previously unidentified nanocrystalline compound, which originates from an amorphous state at low temperature. A combination of a recently developed autoindexing procedure and the charge-flipping method reveals that the crystal structure of MgCl 10HO consists of an ABCABC... sequence of Mg(HO) octahedra. The Cl anions and remaining water molecules unconnected to the Mg cations bind the octahedra, similar to other water-rich magnesium dichloride hydrates. The D positions in MgCl10DO, determined by the difference Fourier methods using the neutron powder diffraction patterns at 2.5 GPa, show the features such as bifurcated hydrogen bonds and tetrahedrally coordinated O atoms.
Kondo, Yasuhiro; Morishita, Takatoshi; Yamazaki, Saishun; Hori, Toshihiko; Sawabe, Yuki; Chishiro, Etsuji; Fukuda, Shimpei; Hasegawa, Kazuo; Hirano, Koichiro; Kikuzawa, Nobuhiro; et al.
Physical Review Special Topics; Accelerators and Beams, 17(12), p.120101_1 - 120101_8, 2014/12
Times Cited Count:6 Percentile:41.95(Physics, Nuclear)We performed a beam test of a new radio frequency quadrupole linac (RFQ III) for the beam current upgrade of the Japan Proton Accelerator Research Complex. First, the conditioning of RFQ III was conducted, and after 20 h of conditioning, RFQ III became very stable with a nominal peak power and duty factor of 400 kW and 1.5%, respectively. An off-line beam test was subsequently conducted before installation in the accelerator tunnel. The transmission, transverse emittance, and energy spread of the 50-mA negative hydrogen beam from RFQ III were measured and compared with simulation results. The experiment and simulation results showed good agreement; therefore, we conclude that the performance of RFQ III conforms to its design.
Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10
no abstracts in English
Hori, Toshihiko; Sato, Fumiaki; Shinozaki, Shinichi; Chishiro, Etsuji; Oguri, Hidetomo; Futatsukawa, Kenta*; Fukui, Yuji*
Proceedings of 10th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.1001 - 1003, 2014/06
no abstracts in English