JAEA Reports

Fuel unloading work in decommissioning of the prototype fast breeder reactor Monju; First stage of Monju decommissioning project

Shiota, Yuki; Kudo, Junki; Tsuno, Hiromi; Takeuchi, Ryotaro; Ariyoshi, Hideo; Shiohama, Yasutaka; Hamano, Tomoharu; Takagi, Tsuyohiko; Nagaoki, Yoshihiro

JAEA-Technology 2023-002, 87 Pages, 2023/06

JAEA-Technology-2023-002.pdf:8.53MB

In the first stage of Monju decommissioning project, fuel unload work began to be carried out. There are two tasks in this work. One is Fuel Treatment and Storage work that gets rid of sodium on the fuel assemblies unloaded from Ex-Vessel fuel Storage Tank (EVST) and carries it in the storage pool, and the other is Fuel Unloading that the fuel assemblies in the reactor core is replaced with dummy fuels and stored in EVST. Fuel Treatment and Storage work and Fuel Unloading work are performed alternately, and 370 fuel assemblies in the core and 160 fuel assemblies in EVST are all carried to the storage pool. Monju had a large amount of sodium in the reactor vessel and EVST, and there was a residual risk of fuel failure due to the superposition of a large scale sodium fire. Therefore, in the first stage of the Monju decommissioning project, it was decided to take about 5.5 years to remove the residual risk by storing all the fuel rods in the fuel storage pool. There are few Fuel handling system of Sodium Fast Reactor in the world, so the driving record and experience are not enough. So, events that occur even if taken measure are assumed. The following three events apply to this; first, events that are difficult to prevent, events. Second, that are due to lack of experience, and final, events optimization of system is not enough. Plans were taken to suppress these events. This report summarizes the "Monju decommissioning project" work conducted so far in all four campaigns.

JAEA Reports

Fuel unloading operations -2020- in the decommissioning of the prototype fast breeder reactor "Monju"

Shiota, Yuki; Ariyoshi, Hideo; Shiohama, Yasutaka; Isobe, Yuta; Takeuchi, Ryotaro; Kudo, Junki; Hanaki, Shotaro; Hamano, Tomoharu; Takagi, Tsuyohiko

JAEA-Technology 2022-019, 95 Pages, 2022/09

JAEA-Technology-2022-019.pdf:7.59MB

In the first stage of "Monju" decommissioning project, "Fuel Unloading Operations" have been carrying out. The operations consists of two processes. The first process is "Fuel Treatment and Storage" is that the fuel assemblies unloaded from the Ex-Vessel fuel Storage Tank (EVST) are canned after sodium cleaning, and then transferred to the storage pool. The second process is "Fuel Unloading" that the fuel assemblies in the reactor core are replaced with dummy fuel assemblies and stored in the EVST. "Fuel Treatment and Storage" and "Fuel Unloading" are performed alternately until 370 fuel assemblies in the core and 160 fuel assemblies in the EVST are all transferred to the storage pool. This is a summary of "Fuel Unloading" in the third quarter of "Fuel Unloading Operation". In fiscal 2020, as "Fuel Unloading", 72 fuel assemblies and 74 blanket fuel assemblies were unloaded from the core, and stored in the EVST. From the EVST, 145 dummy fuel assemblies and 1 fixed absorber were loaded in the core instead. During these operations, a total of 36 cases alarming or equipment malfunctions classified into 4 types occurred. However, these events were estimated in advance, there were no significant events that menaces to safety of fuel assemblies and equipment. Therefore, there were no serious problem like fall of fuel assemblies and events that may affect schedule of the project like stick of gripper of ex-vessel fuel transfer machine. When equipment's work or performance fail, the operation continued with safety by elimination of causes of problem. Fuel handling system of Monju has function that is endemic to sodium cooling fast breeding reactor. Because continuous operations of fuel handling system with actual fuel assemblies start recently, we don't have as much experience as PWR and BWR. With estimation of various troubles, reduction of frequency of trouble occurrence and minimization of impacts on schedule performed.

JAEA Reports

Fuel Unloading Operations -2019- in the decommissioning of prototype fast breeder reactor "Monju"

Yabe, Takanori; Murakami, Makio; Shiota, Yuki; Isobe, Yuta; Shiohama, Yasutaka; Hamano, Tomoharu; Takagi, Tsuyohiko; Nagaoki, Yoshihiro

JAEA-Technology 2022-002, 66 Pages, 2022/07

JAEA-Technology-2022-002.pdf:10.45MB

In the first stage of "Monju" decommissioning project, "Fuel Unloading Operations" have been carrying out. The operations consists of two processes. The first process is "Fuel Treatment and Storage" is that the fuel assemblies unloaded from the Ex-Vessel fuel Storage Tank are canned after sodium cleaning, and then transferred to the storage pool. The second process is "Fuel Unloading" that the fuel assemblies in the reactor core are replaced with dummy fuel assemblies and stored in the Ex-Vessel fuel Storage Tank. "Fuel Treatment and Storage" and "Fuel Unloading" are performed alternately until 370 fuel assemblies in the core and 160 fuel assemblies in the Ex-Vessel fuel Storage Tank are all transferred to the storage pool. In fiscal 2018, as "Fuel Treatment and Storage", 86 fuel assemblies were transferred to the storage pool. As "Fuel Unloading", 76 dummy fuel assemblies were stored in the Ex-Vessel fuel Storage Tank. In fiscal 2019, as "Fuel Unloading", 60 fuel assemblies and 40 blanket fuel assemblies were unloaded from the core. These assemblies were stored in the Ex-Vessel fuel Storage Tank, and dummy fuel assemblies were loaded into the core instead. During these operations, a total of 38 cases of alarming or equipment malfunctions classified into 24 types occurred. However, no significant events that menaces to safety have occurred. The operations were continued safely by removing the direct factors for the malfunctions in the equipment operation and performance.

Oral presentation

Study on reflection of operating experience of Prototype Fast Breeder Reactor Monju fuel handling system to the next generation FBR

Rekimoto, Masafumi; Ando, Masato; Chikazawa, Yoshitaka; Kato, Atsushi; Hamano, Tomoharu; Shiohama, Yasutaka; Miyagawa, Takayuki*; Uzawa, Masayuki*; Hara, Hiroyuki*; Yamauchi, Kanau*; et al.

no journal, , 

no abstracts in English

Oral presentation

Study on reflection of knowledge obtained from the decommissioning of the prototype fast breeder reactor "MONJU" to the fuel handling system of the next generation FBR