Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Yokozuka, Yuta; Sunaoshi, Mizuho*; Sakai, Tatsuya; Fujikura, Toshiki; Handa, Yuichi; Muraguchi, Yoshinori; Mimura, Ryuji; Terunuma, Akihiro
JAEA-Technology 2021-037, 44 Pages, 2022/03
JAEA has dismantled equipment and instrument in the JAERI's Reprocessing Test Facility (JRTF) since 1996 as a part of its decommissioning. Starting in JFY 2007, in the annex building B which stored liquid waste generated in wet reprocessing tests, the liquid waste storage tank LV-1 installed in the LV-1 room of the first basement was dismantled with the in-situ dismantling method. The dismantling work is described in this report. Data on manpower, radiation control, and waste in the preparation work were collected, and its work efficiency was analyzed.
Yokozuka, Yuta; Sunaoshi, Mizuho*; Fujikura, Toshiki; Suzuki, Shota; Muraguchi, Yoshinori; Handa, Yuichi; Mimura, Ryuji; Terunuma, Akihiro
JAEA-Technology 2020-017, 56 Pages, 2021/01
JAEA has dismantled equipment and instrument in the JAERI's Reprocessing Test Facility (JRTF) since 1996 as a part of its decommissioning. Starting in JFY 2007, in the annex building B which stored liquid waste generated in wet reprocessing tests, the liquid waste storage tank LV-1 installed in the LV-1 room of the first basement was dismantled with the in situ dismantling method. The dismantling preparation work is described in this report. Data on manpower, radiation control, and waste in the preparation work were collected, and its work efficiency was analyzed.
Kanayama, Fumihiko; Hagiya, Kazuaki; Sunaoshi, Mizuho; Muraguchi, Yoshinori; Satomi, Shinichi; Nemoto, Koichi; Terunuma, Akihiro; Shiraishi, Kunio; Ito, Shinichi
JAEA-Technology 2011-011, 36 Pages, 2011/06
Dismantling activities of equipments in JAERI's Reprocessing Test Facility (JRTF) started from 1996 as a part of decommissioning of this facility. Removing out of the large liquid waste storage tank LV-2 as a whole tank without cutting in pieces from the annex building B to confirm safety and efficiency of this method started from 2006. After preparatory works, ceiling of LV-2 room was opened, and LV-2 was transferred. Useful data were collected on manpower, radiation control and waste amount through the preparatory works, and work efficiency was analyzed by use of these data.
Omori, Koji; Oki, Koichi; Ishibashi, Yuzo; Numano, Tatsuo; Sunaoshi, Mizuho*; Suzuki, Satoshi*; Sukegawa, Yasuhiro*
no journal, ,
no abstracts in English