Refine your search:     
Report No.
 - 
Search Results: Records 1-3 displayed on this page of 3
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Design of HTTR-GT/H$$_{2}$$ test plant

Yan, X.; Sato, Hiroyuki; Sumita, Junya; Nomoto, Yasunobu*; Horii, Shoichi*; Imai, Yoshiyuki; Kasahara, Seiji; Suzuki, Koichi*; Iwatsuki, Jin; Terada, Atsuhiko; et al.

Nuclear Engineering and Design, 329, p.223 - 233, 2018/04

 Times Cited Count:20 Percentile:90.27(Nuclear Science & Technology)

The pre-licensing design of an HTGR cogeneration test plant to be coupled to JAEA's existing test reactor HTTR is presented. The plant is designed to demonstrate the system of JAEA commercial plant design GTHTR300C. With construction planned to be completed around 2025, the test plant is expected to be the first-of-a-kind nuclear system operating on two of the advanced energy conversion systems attractive for the HTGR closed cycle helium gas turbine for power generation and thermochemical iodine-sulfur water-splitting process for hydrogen production.

Journal Articles

HTTR-GT/H$$_{2}$$ test plant; System design

Yan, X.; Sato, Hiroyuki; Sumita, Junya; Nomoto, Yasunobu; Horii, Shoichi; Imai, Yoshiyuki; Kasahara, Seiji; Suzuki, Koichi*; Iwatsuki, Jin; Terada, Atsuhiko; et al.

Proceedings of 8th International Topical Meeting on High Temperature Reactor Technology (HTR 2016) (CD-ROM), p.827 - 836, 2016/11

Pre-licensing basic design for a cogenerating HTGR test plant system is presented. The plant to be coupled to existing 30 MWt 950$$^{circ}$$C test reactor HTTR is intended as a system technology demonstrator for GTHTR300C plant design. More specifically the test plant of HTTR-GT/H$$_{2}$$ aims to (1)demonstrate the licensability of the GTHTR300C for electricity production by gas turbine and hydrogen cogeneration by thermochemical process and (2) confirm the operation control and safety of such cogeneration system. With construction and operation completion by 2025, the test plant is expected to be the first of a kind HTGR-powered cogeneration plant operating on the two advanced energy conversion systems of closed cycle helium gas turbine for power generation and thermochemical iodine-sulfur water-splitting process for hydrogen production.

Oral presentation

Development of large-scale hydrogen production technology utilizing very high temperature, 1-1; Overview of large-scale hydrogen production demonstration project utilizing very high temperature

Sato, Hiroyuki; Iigaki, Kazuhiko; Shimizu, Atsushi; Noguchi, Hiroki; Sakaba, Nariaki; Asano, Koji*; Oyama, Sunao*; Onishi, Hiroyuki*; Suyama, Kazumasa*; Usui, Yukinori*

no journal, , 

no abstracts in English

3 (Records 1-3 displayed on this page)
  • 1