Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Equipment renewal, facility improvement, and dismantling / removal in the glove-box at basic laboratory of Plutonium Conversion Development Facility

Umino, Yoshinori; Kato, Keisuke; Tanigawa, Masafumi; Kobayashi, Daisuke; Obu, Tomoyuki; Kimura, Yuichi*; Nemoto, Ryo*; Tajiri, Kazuma*

Nihon Hozen Gakkai Dai-19-Kai Gakujutsu Koenkai Yoshishu, p.33 - 36, 2023/08

In the basic laboratory of the Plutonium Conversion Development Facility in Tokai Reprocessing Plant, tests had been conducted to obtain effective data for manufacturing mixed plutonium and uranium oxide powder by irradiating a mixture of plutonium and uranium solution with microwaves. The test has already been completed, and we are currently dismantling and removing equipment. In this paper, techniques related to equipment renewal, dismantling and removal works inside the glove-box are discussed.

Journal Articles

Completion of solidification and stabilization for Pu nitrate solution to reduce potential risks at Tokai Reprocessing Plant

Mukai, Yasunobu; Nakamichi, Hideo; Kobayashi, Daisuke; Nishimura, Kazuaki; Fujisaku, Sakae; Tanaka, Hideki; Isomae, Hidemi; Nakamura, Hironobu; Kurita, Tsutomu; Iida, Masayoshi*; et al.

Proceedings of 2017 International Congress on Advances in Nuclear Power Plants (ICAPP 2017) (CD-ROM), 8 Pages, 2017/04

TRP has stored the plutonium in solution state for long-term since the last PCDF operation in 2007 was finished. After the great east Japan earthquake in 2011, JAEA had investigated the risk against potential hazard of these solutions which might lead to make hydrogen explosion and/or boiling of the solution accidents with the release of radioactive materials to the public when blackout. To reduce the risk for storing Pu solution (about 640 kg Pu), JAEA planned to perform the process operation for the solidification and stabilization of the solution by converted into MOX powder at PCDF in 2013. In order to perform PCDF operation without adaption of new safety regulation, JAEA conducted several safety measures such as emergency safety countermeasures, necessary security and safeguards (3S) measures with understanding of NRA. As a result, the PCDF operation had stared on 28th April, 2014, and successfully completed to convert MOX powder on 3rd August, 2016 for about 2 years as planned.

Oral presentation

Stabilizing and solidifications for Pu nitrate solution at TRP, 3; Preparation for the operation of solidification and stabilization for Pu nitrate solution and the operation result

Nishimura, Kazuaki; Tanaka, Hideki; Kobayashi, Daisuke; Suzuki, Shohei; Numata, Shinji; Nakamichi, Hideo; Kurita, Tsutomu; Iida, Masayoshi*; Tajiri, Kazuma*; Sukegawa, Katsumi*

no journal, , 

no abstracts in English

Oral presentation

Solidification and stabilization for Pu nitrate solution at TRP, 4; Respond to equipment problems at PCDF

Numata, Shinji; Isomae, Hidemi; Omura, Masami; Tsutagi, Koichi; Kobayashi, Daisuke; Nakamura, Daishi; Nemoto, Masahiro; Iida, Masayoshi*; Tajiri, Kazuma*; Kurita, Tsutomu

no journal, , 

no abstracts in English

4 (Records 1-4 displayed on this page)
  • 1