Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
LaNakabe, Rintaro; Endo, Shunsuke; Kambara, Wataru*; Kimura, Atsushi; Kobayashi, Ryuju; Oku, Takayuki; Sakai, Kenji; Shinohara, Takenao; Takahashi, Ryuta*; Tsuchikawa, Yusuke; et al.
JPS Conference Proceedings (Internet), 45, p.011066_1 - 011066_5, 2026/06
We evaluate the time-reversal invariance violation using previous neutron transmission data with polarized neutrons propagating through a transversely polarized
La. By incorporating precise spin observables and the scattering amplitudes into our analysis, we preliminarily constrained the time-reversal invariance violating cross section.
LaNakabe, Rintaro; Endo, Shunsuke; Kambara, Wataru*; Kawamura, Shihori; Kimura, Atsushi; Kobayashi, Ryuju; Oku, Takayuki; Okudaira, Takuya*; Sakai, Kenji; Shinohara, Takenao; et al.
Progress of Theoretical and Experimental Physics (Internet), 2026(6), p.063D01_1 - 063D01_15, 2026/06
Times Cited Count:0 Percentile:0.00(Physics, Multidisciplinary)We report the first constraint on time-reversal invariance violating (TRIV) effects in polarized neutron transmission through a transversely polarized
La target. We formulate the transmission asymmetry within the density matrix formalism, explicitly incorporating the forward scattering amplitude of
La including tensor polarization terms up to third-rank. The formalism is applied to existing transmission data originally obtained to measure the spin-dependent cross section near the
~eV
-wave resonance. Since these data were not optimized for P-odd/T-odd observables, the attainable sensitivity is intrinsically limited; nevertheless, they provide a useful test of the formalism on real experimental data. No statistically significant TRIV signal is observed. By analyzing the global
structure in the parameter space, we obtain an upper limit of
at the 90% confidence level. This corresponds to an upper limit on the resonance-averaged TRIV cross section of
. These results validate the present theoretical framework and provide guidance for future dedicated TRIV searches in polarized neutron transmission experiments.
Kondo, Yasuhiro; Chimura, Motoki; Cicek, E.*; Fukui, Yuji*; Futatsukawa, Kenta*; Fuwa, Yasuhiro; Goto, Rikuto*; Hirano, Koichiro; Ishikawa, Masaki*; Ito, Takashi; et al.
Proceedings of 22nd Annual Meeting of Particle Accelerator Society of Japan (Internet), p.124 - 129, 2026/03
Various upgrade plans of the J-PARC linac are underway, and repetition-rate doubling project is one of the most important part. Currently, the linac supplies a 400~MeV H
ion beam to the 3~GeV synchrotron (RCS) at a repetition rate of 25~Hz. However, to deliver the beam to both RCS and proton-beam irradiation facility under planning, it is necessary to raise the repetition rate from 25~Hz to 50~Hz. Prior to construction of the beamline to the irradiation facility, we conducted a verification of the 50~Hz operation of all the linac apparatus simultaneously within the current operational limits in May 2025. And also, the verification of the 50~Hz operation of the particle counter system, which is one of the most important safety device of the J-PARC accelerator, was conducted. As a result, any significant problems were not found out, and it is now ready for the upcoming 50~Hz-beam acceleration demonstration. This paper describes this details of the demonstration of the 50~Hz operation, without beam acceleration, of the J-PARC linac.
Terada, Atsuhiko; Thwe Thwe, A.; Hino, Ryutaro*; Harai, Yasutaka*; Sasaki, Gaku*; Shingeya, Hideshi*; Yamashita, Toshiyuki*; Yoneda, Jiro*; Okabayashi, Kazuki*; Sakamoto, Hiroyuki*; et al.
JAEA-Data/Code 2025-012, 151 Pages, 2025/12
Based on the lessons learned from the Fukushima Daiichi Nuclear Power Station accident, we have highly paid attention to the advancement of the fundamental technologies which are indispensable in timely response to hydrogen safety measures and assessments especially in both nuclear reactors and decommissioning. Focusing on this attention, we developed an analysis system that predicts the behavior of hydrogen from generation to diffusion, combustion and explosion. The system utilizes the commercial computational fluid dynamics software (FLUENT, AUTODYN), and incorporates new modules and pre/post-processors in order to withstand the general practical use. We also developed a system by utilizing open-source code (OpenFOAM) that can be used in hydrogen disaster prevention plans for nuclear facilities. So far, we have expanded the system to deal with the phenomena that should be considered from the practical point of view for PWR (Pressurized Water Reactor) in nuclear power plants. This report summarizes the overview of the integrated analysis system for hydrogen behavior, the handling method, and real scale analysis examples.
Kobayashi, Fuminori; Kamiya, Junichiro; Takahashi, Hiroki; Suzuki, Yasuo*; Tasaki, Ryuta*
JAEA-Technology 2024-007, 28 Pages, 2024/07
In J-PARC LINAC, the vacuum system is in place to maintain an ultra-high vacuum in the beam transport line (LINAC to 3GeV RCS beam transportation line: L3BT) between the LINAC to the 3GeV synchrotron. The vacuum system is installed in the LINAC and L3BT buildings and consists of vacuum pumps, vacuum gauges, beam line gate valves (BLGVs), and other vacuum. In existing vacuum systems, vacuum equipment is controlled independently for each area, and vacuum equipment can be operated regardless of the status of adjacent areas. This makes it impossible to eliminate erroneous operation due to human error. In addition, when a vacuum deterioration occurs in the beam transport line, the vacuum deterioration ILK signal is transmitted to the BLGV relay unit via the MPS transmission signal, which causes the BLGVs to be forcibly closed. Because the ILK signal transmission range extends to all BLGVs in the L3BT, however, BLGVs in areas unaffected by vacuum deterioration are also forced to close. This could cause problems such as unnecessary open/close operations leading to more frequent maintenance cycles of the BLGVs. In addition, since the BLGV is operated using the MPS signal path, maintenance of the vacuum control system requires work involving the MPS signal path, making it difficult to maintain the vacuum control system alone and making the work complicated. To solve these problems, it is necessary to improve maintainability by separating the signal paths and automatically controlling BLGV separately. Therefore, the vacuum control system was modified and constructed with the aim of realizing a control system that takes into account the safety and efficient maintenance and operation of the L3BT vacuum system. This report summarizes the development and use of the L3BT vacuum system control system.
Ishikado, Motoyuki*; Takahashi, Ryuta*; Yamauchi, Yasuhiro*; Nakamura, Masatoshi*; Ishimaru, Sora*; Yamauchi, Sara*; Kawamura, Seiko; Kira, Hiroshi*; Sakaguchi, Yoshifumi*; Watanabe, Masao; et al.
JPS Conference Proceedings (Internet), 41, p.011010_1 - 011010_7, 2024/05
-odd/
-odd interactions on the 0.75 eV
-wave resonance in
+
forward transmission determined using a pulsed neutron beamNakabe, Rintaro*; Auton, C. J.*; Endo, Shunsuke; Fujioka, Hiroyuki*; Gudkov, V.*; Hirota, Katsuya*; Ide, Ikuo*; Ino, Takashi*; Ishikado, Motoyuki*; Kambara, Wataru*; et al.
Physical Review C, 109(4), p.L041602_1 - L041602_4, 2024/04
Times Cited Count:2 Percentile:11.59(Physics, Nuclear)
-wave resonance of 
+
Okudaira, Takuya*; Nakabe, Rintaro*; Auton, C. J.*; Endo, Shunsuke; Fujioka, Hiroyuki*; Gudkov, V.*; Ide, Ikuo*; Ino, Takashi*; Ishikado, Motoyuki*; Kambara, Wataru*; et al.
Physical Review C, 109(4), p.044606_1 - 044606_9, 2024/04
Times Cited Count:3 Percentile:50.42(Physics, Nuclear)Hasemi, Hiroyuki; Takahashi, Ryuta*; Yamauchi, Yasuhiro*; Ishikado, Motoyuki*; Kawamura, Seiko; Komine, Ryota
JPS Conference Proceedings (Internet), 41, p.011003_1 - 011003_5, 2024/03
Suzuki, Masaaki*; Ito, Mari*; Hashidate, Ryuta; Takahashi, Keita; Yada, Hiroki; Takaya, Shigeru
2020 9th International Congress on Advanced Applied Informatics (IIAI-AAI 2020), p.797 - 801, 2021/07
Toyota, Kodai; Hashidate, Ryuta; Takahashi, Keita; Yada, Hiroki; Takaya, Shigeru
Hozengaku, 20(2), p.95 - 103, 2021/07
Hashidate, Ryuta; Toyota, Kodai; Takahashi, Keita; Yada, Hiroki; Takaya, Shigeru
Hozengaku, 19(4), p.115 - 122, 2021/01
In order to improve both safety and economic efficiency of a nuclear power plant, it is necessary to realize rational maintenance based on characteristics of the plant. The prototype fast-breeder reactor in Japan, Monju, spent most of the year for the maintenance. Thus, it is important to identify causes of the prolonged maintenance of Monju and to investigate countermeasures for implementation of rational maintenance of next-generation fast reactors. In this study, the authors investigated the causes of the prolonged maintenance of Monju during reactor cold shutdown based on the plant schedule of Monju. In addition, we proposed the maintenance optimization idea for next-generation fast reactors to solve the revealed issues.
Kondo, Yasuhiro; Hirano, Koichiro; Ito, Takashi; Kikuzawa, Nobuhiro; Kitamura, Ryo; Morishita, Takatoshi; Oguri, Hidetomo; Okoshi, Kiyonori; Shinozaki, Shinichi; Shinto, Katsuhiro; et al.
Journal of Physics; Conference Series, 1350, p.012077_1 - 012077_7, 2019/12
Times Cited Count:3 Percentile:75.19(Physics, Particles & Fields)We have upgraded a 3-MeV linac at J-PARC. The ion source is same as the J-PARC linac's, and the old 30-mA RFQ is replaced by a spare 50-mA RFQ, therefore, the beam energy is 3 MeV and the nominal beam current is 50 mA. The main purpose of this system is to test the spare RFQ, but also used for testing of various components required in order to keep the stable operation of the J-PARC accelerator. The accelerator has been already commissioned, and measurement programs have been started. In this paper, present status of this 3-MeV linac is presented.
Kawamura, Seiko; Takahashi, Ryuta*; Ishikado, Motoyuki*; Yamauchi, Yasuhiro*; Nakamura, Masatoshi*; Ouchi, Keiichi*; Kira, Hiroshi*; Kambara, Wataru*; Aoyama, Kazuhiro*; Sakaguchi, Yoshifumi*; et al.
Journal of Neutron Research, 21(1-2), p.17 - 22, 2019/05
The Cryogenics and Magnets group in the Sample Environment team is responsible for operation of cryostats and magnets for user's experiments at the MLF in J-PARC. We have introduced a top-loading
He cryostat, a bottom-loading
He cryostat, a dilution refrigerator insert and a superconducting magnet. The frequency of use of them dramatically becomes higher in these two years, as the beam power and the number of proposal increase. To respond such situation, we have made efforts to enhance performance of these equipment as follows. The
He cryostat originally involves an operation software for automatic initial cooling down to the base temperature and automatic re-charge of
He. Recently we made an additional program for automatic temperature control with only the sorb heater. Last year, a new outer vacuum chamber of the magnet with an oscillating radial collimator (ORC) was fabricated. The data quality was drastically improved by introducing this ORC so that the magnet can be used even for the inelastic neutron scattering experiments.
Watanabe, Masao; Nojiri, Hiroyuki*; Ito, Shinichi*; Kawamura, Seiko; Kihara, Takumi*; Masuda, Takatsugu*; Sahara, Takuro*; Soda, Minoru*; Takahashi, Ryuta
JPS Conference Proceedings (Internet), 25, p.011024_1 - 011024_5, 2019/03
Recently, neutron scattering experiments have been rapidly progressed under high magnetic field. In the J-PARC, proto-type compact pulse magnet system with the power supply, the coil and the sample stick has been developed. Basic specifications of the power supply are as follows; maximum charged voltage with capacitor is 2 kV, maximum current is 8 kA, repetition rate is a pulse per several minutes and pulse duration is several msec. Maximum magnetic field in the coil is more than 30 Tesla. The sample stick is designed for Orange-Cryostat. In this presentation, We report the details of the pulsed magnet system and the performance of it on neutron scattering experiments at MLF beam line (HRC).
Kajimoto, Ryoichi; Ishikado, Motoyuki*; Kira, Hiroshi*; Kaneko, Koji; Nakamura, Mitsutaka; Kamazawa, Kazuya*; Inamura, Yasuhiro; Ikeuchi, Kazuhiko*; Iida, Kazuki*; Murai, Naoki; et al.
Physica B; Condensed Matter, 556, p.26 - 30, 2019/03
Times Cited Count:3 Percentile:11.45(Physics, Condensed Matter)Kawakita, Yukinobu; Kikuchi, Tatsuya*; Inamura, Yasuhiro; Tahara, Shuta*; Maruyama, Kenji*; Hanashima, Takayasu*; Nakamura, Mitsutaka; Kiyanagi, Ryoji; Yamauchi, Yasuhiro*; Chiba, Kaori*; et al.
Physica B; Condensed Matter, 551, p.291 - 296, 2018/12
Times Cited Count:16 Percentile:50.42(Physics, Condensed Matter)There are elemental liquid metals with complex structures far from the hard sphere (HS) packing model. Liquid Bi has an asymmetric first peak in the structure factors S(Q). The pair distribution function g(r) exhibits strange distance ratio of 1:2 between the first and the second peaks. Since a HS model with two kinds of radius produces asymmetry of the main peak in S(Q), existence of short-lived covalent bonds was discussed. Contrarily, modulation of the atomic distribution by the Friedel oscillations of shielding electrons around metallic ions was discussed. To examine its bonding nature from viewpoints of dynamic correlation functions, we have measured neutron quasielastic scattering of liquid Bi by using cold disk chopper spectrometer installed at MLF of J-PARC. The van Hove function revealed that the shoulder structure located at a longer side of the first peak in g(r) exhibits a longer relaxation time than the main structures such as the first and second peaks.
Kajimoto, Ryoichi; Nakamura, Mitsutaka; Inamura, Yasuhiro; Kamazawa, Kazuya*; Ikeuchi, Kazuhiko*; Iida, Kazuki*; Ishikado, Motoyuki*; Murai, Naoki; Kira, Hiroshi*; Nakatani, Takeshi; et al.
Journal of Physics; Conference Series, 1021(1), p.012030_1 - 012030_6, 2018/06
Times Cited Count:3 Percentile:82.54(Nuclear Science & Technology)Kawamura, Seiko; Oku, Takayuki; Watanabe, Masao; Takahashi, Ryuta; Munakata, Koji*; Takata, Shinichi; Sakaguchi, Yoshifumi*; Ishikado, Motoyuki*; Ouchi, Keiichi*; Hattori, Takanori; et al.
Journal of Neutron Research, 19(1-2), p.15 - 22, 2017/11
Sample environment (SE) team at the Materials and Life Science Experimental Facility (MLF) in J-PARC has worked on development and operation of SE equipment and devices. All the members belong to one sub-team at least, such as Cryogenic and magnet, High temperature, High pressure, Soft matter and special environment including Pulse magnet, Hydrogen environment, Light irradiation and
He spin filter. Cryostats, a magnet, furnaces, a VX-6-type Paris-Edinburgh press and a prototype of a Spin-Exchange Optical Pumping (SEOP) based
He spin filter for polarized neutron beam experiments are in operation. Furthermore, a prototype of compact power supply for a pulsed magnet system is currently developed. In the J-PARC Research Building, several pieces of equipment for softmatter research such as a rheometer and a gas and vapor adsorption measurement instrument have been prepared.
Nakashima, Yosuke*; Takeda, Hisahito*; Ichimura, Kazuya*; Hosoi, Katsuhiro*; Oki, Kensuke*; Sakamoto, Mizuki*; Hirata, Mafumi*; Ichimura, Makoto*; Ikezoe, Ryuya*; Imai, Tsuyoshi*; et al.
Journal of Nuclear Materials, 463, p.537 - 540, 2015/08
Times Cited Count:23 Percentile:81.93(Materials Science, Multidisciplinary)