Refine your search:     
Report No.
 - 
Search Results: Records 1-2 displayed on this page of 2
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Oral presentation

Evaluation of ITER TF coil joint performance

Kajitani, Hideki; Hemmi, Tsutomu; Matsui, Kunihiro; Yamane, Minoru; Koizumi, Norikiyo; Obana, Tetsuhiro*; Hamaguchi, Shinji*; Takata, Suguru*; Chikaraishi, Hirotaka*; Natsume, Kyohei*; et al.

no journal, , 

Two double pancake coils of ITER TF coil are electrically connected at the joint. To evaluate the ITER TF joint performance, the joint test sample, which consists of two TF conductors and has full size joint part, was fabricated. The joint sample was tested using NIFS test facility under the condition of current of 68kA and external field of 2T. As a result, the joint resistance could be 1nohm, which is sufficiently small. In this presentation, detail of the test result is reported.

Oral presentation

Reduction of copper busbar heating due to addional high superconducting busbar in ITER TF coil full size joint test

Saura, Keisuke*; Obana, Tetsuhiro*; Takata, Suguru*; Natsume, Kyohei*; Hamaguchi, Shinji*; Chikaraishi, Hirotaka*; Takahata, Kazuya*; Imagawa, Shinsaku*; Kajitani, Hideki; Hemmi, Tsutomu; et al.

no journal, , 

The full size joint test of ITER TF coil was performed using NIFS test facility. Because of transport current of 68kA, which is high current never experienced before, the reduction of cupper busbar heating was needed. Therefore, high temperature superconducting (HTS) busbar (Bi2212 fabricated by Sumitomo Electric Co.,Ltd) was installed in parallel with cupper busbar. In the test, current of HIS busbar was measured using rogowski coil and it was observed that the current of 20 kA could be distributed to HTS busbar. Therefore, the cupper busbar heating could be reducted to about 60% compared with the case of no HTS busbar.

2 (Records 1-2 displayed on this page)
  • 1