Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Fukaya, Masaaki*; Hata, Koji*; Akiyoshi, Kenji*; Sato, Shin*; Takeda, Yoshinori*; Miura, Norihiko*; Uyama, Masao*; Kaneda, Tsutomu*; Ueda, Tadashi*; Toda, Akiko*; et al.
JAEA-Technology 2014-040, 199 Pages, 2015/03
The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) project consists of (1) development of design and construction planning technologies, (2) development of construction technology, (3) development of countermeasure technology, (4) development of technology for security, and (5) development of technologies for restoration and/or reduction of the excavation damage. The researches on engineering technology such as verification of the initial design were being conducted by using data measured during construction as a part of the second phase of the MIU plan. Examination about the plug for reflood test in the GL-500m Access/Research Gallery-North as part of the development of technologies for restoration and/or reduction of excavation damage were carried out. Specifically, Literature survey was carried out about the plug, based on the result of literature survey, examination of the design condition, design of the plug and rock stability using numerical simulation, selection of materials for major parts, and grouting for water inflow from between rock and plug, were carried out in this study.
Fukaya, Masaaki*; Noda, Masaru*; Hata, Koji*; Takeda, Yoshinori*; Akiyoshi, Kenji*; Ishizeki, Yoshikazu*; Kaneda, Tsutomu*; Sato, Shin*; Shibata, Chihoko*; Ueda, Tadashi*; et al.
JAEA-Technology 2014-019, 495 Pages, 2014/08
The researches on engineering technology in the Mizunami Underground Research Laboratory (MIU) plan consists of (1) research on engineering technology deep underground, and (2) research on engineering technology as a basis of geological disposal. The former research is mainly aimed in this study, which is categorized in (a) development of design and construction planning technologies, (b) development of construction technologies, (c) development of countermeasure technologies, and (d) development of technologies for security. In this study, the researches on engineering technology are being conducted in these four categories by using data measured during construction as a part of the second phase of the MIU plan.