Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Takeuchi, Takao*; Kikuchi, Akihiro*; Banno, Nobuya*; Kitaguchi, Hitoshi*; Iijima, Yasuo*; Tagawa, Kohei*; Nakagawa, Kazuhiko*; Tsuchiya, Kiyosumi*; Mitsuda, Shiori*; Koizumi, Norikiyo; et al.
Cryogenics, 48(7-8), p.371 - 380, 2008/07
Times Cited Count:62 Percentile:87.88(Thermodynamics)NbAl has advantages of better tolerance to strain/stress and a higher critical magnetic field (30 T at 4.2 K) for stoichiometric composition over NbSn. The rapid-heating, quenching and transformation annealing (RHQT) process enables to form a stoichiometric NbAl with fine grain structures via metastable bcc supersaturated-solid-solution. As a result a large critical current density of NbAl is achieved over the whole range of magnetic fields without trading off the excellent strain tolerance. A long-length of RHQ processing has been established, and a rectangular but Cu stabilized NbAl strand is about be commercially available for NMR uses. Ag or Cu internal stabilization and Cu ion-plating/electroplating techniques have been also developed to enable the stabilized round wire for accelerator and fusion magnets. Successfully energized test coils that were manufactured with a wind-and-react technique have demonstrated that a long piece of Cu stabilized RHQT NbAl wire is really available for practical applications.
Yoshikawa, Hiroshi; Sakaki, Hironao; Sako, Hiroyuki; Takahashi, Hiroki; Shen, G.; Kato, Yuko; Ito, Yuichi; Ikeda, Hiroshi*; Ishiyama, Tatsuya*; Tsuchiya, Hitoshi*; et al.
Proceedings of International Conference on Accelerator and Large Experimental Physics Control Systems (ICALEPCS '07) (CD-ROM), p.62 - 64, 2007/10
J-PARC is a large scale facility of the proton accelerators for the multi-purpose of scientific researches in Japan. This facility consists of three accelerators and three experimental stations. Now, J-PARC is under construction, and LINAC is operated for one year, 3GeV synchrotron has just started the commissioning in this October the 1st. The completion of this facility will be next summer. The control system of accelerators established fundamental performance for the initial commissioning. The most important requirement to the control system of this facility is to minimize the activation of accelerator devices. In this paper, we show that the performances of each layer of this control system have been achieved in the initial stage.
Sakata, Toshiyuki*; Shirai, Koji*; Tsuchiya, Shiori*; Kiguchi, Kenji*; Fukamoto, Kana; Sakashita, Tetsuya; Kobayashi, Yasuhiko; Sato, Shigeru*
no journal, ,
no abstracts in English
Fukamoto, Kana; Tsuchiya, Shiori*; Shirai, Koji*; Kiguchi, Kenji*; Sakashita, Tetsuya; Kobayashi, Yasuhiko; Imanishi, Shigeo*
no journal, ,
no abstracts in English
Fukamoto, Kana; Tsuchiya, Shiori*; Sakashita, Tetsuya; Hamada, Nobuyuki*; Suzuki, Michiyo*; Kakizaki, Takehiko*; Wada, Seiichi*; Hara, Takamitsu*; Imanishi, Shigeo*; Shirai, Koji*; et al.
no journal, ,
no abstracts in English
Kobayashi, Satoshi*; Sakata, Toshiyuki*; Tsuchiya, Shiori*; Shirai, Koji*; Kiguchi, Kenji*; Fukamoto, Kana; Sakashita, Tetsuya; Funayama, Tomoo; Kobayashi, Yasuhiko
no journal, ,
no abstracts in English
Tsuchiya, Shiori*; Fukamoto, Kana; Shirai, Koji*; Kiguchi, Kenji*; Funayama, Tomoo; Sakashita, Tetsuya; Kobayashi, Yasuhiko
no journal, ,
no abstracts in English
Fukamoto, Kana; Tsuchiya, Shiori*; Funayama, Tomoo; Sakashita, Tetsuya; Yokota, Yuichiro; Shirai, Koji*; Kiguchi, Kenji*; Kobayashi, Yasuhiko
no journal, ,
no abstracts in English
Tsuchiya, Shiori*; Shirai, Koji*; Kiguchi, Kenji*; Fukamoto, Kana; Yokota, Yuichiro; Funayama, Tomoo; Sakashita, Tetsuya; Kobayashi, Yasuhiko
no journal, ,
no abstracts in English
Kobayashi, Satoshi*; Tsuchiya, Shiori*; Shirai, Koji*; Fukamoto, Kana; Funayama, Tomoo; Sakashita, Tetsuya; Kobayashi, Yasuhiko
no journal, ,
no abstracts in English