常盤 哲也*; 津坂 仁和*; 青柳 和平
International Journal of Civil Engineering, 16(4), p.371 - 381, 2018/04
被引用回数:3 パーセンタイル:14.49(Engineering, Civil)We conducted detailed fracture mapping of the soft sedimentary rocks (uniaxial compressive strength of 10-20 MPa) in shaft walls at the Horonobe Underground Research Laboratory to characterize fractures and to understand the influence of different excavation methods on rock mass damage. The mapping indicates that the fractures are numerous and can be divided into shear fractures and extension fractures. On the basis of orientation and frequency, the shear fractures are inferred to be pre-existing fractures, and the extension fractures are considered to be newly formed fractures (EDZ fractures) induced by the shaft excavation. The frequencies of pre-existing and newly formed fractures have a negative correlation, and we infer that stress relief leads to the formation of excavation damaged zone by the generation of the newly formed fractures in the parts of shaft that have intact rock, and by the reactivation of pre-existing fractures where such fractures are numerous. Although more newly formed fractures are formed by blasting excavation than by mechanical excavation, there is little difference in the comparative excavation rates. These results indicate that rock mass damage is caused by the mode of excavation rather than excavation rate. Therefore, the mechanical excavation is preferred to blasting excavation from the viewpoint of minimizing rock mass damage.
濱 克宏; 水野 崇; 笹尾 英嗣; 岩月 輝希; 三枝 博光; 佐藤 稔紀; 藤田 朝雄; 笹本 広; 松岡 稔幸; 横田 秀晴; et al.
JAEA-Research 2015-007, 269 Pages, 2015/08
日本原子力研究開発機構の第2期中期計画期間(平成2226年度)における、超深地層研究所計画および幌延深地層研究計画、地質環境の長期安定性に関する研究の成果を取りまとめた。研究成果については、地層処分事業におけるサイト選定から処分開始に関する意思決定ポイントまでに必要な技術情報を、事業者・規制機関が活用可能な形式で体系化し、所期の目標としていた精密調査(前半)の段階に必要となる技術基盤として整備した。
稲垣 大介*; 津坂 仁和*; 青柳 和平; 名合 牧人*; 井尻 裕二*; 重廣 道子*
Proceedings of ITA-AITES World Tunnel Congress 2015 (WTC 2015)/41st General Assembly, 10 Pages, 2015/05
In the Horonobe Underground Research Laboratory located in Hokkaido, Japan, "3D geological structure/construction data visualization system" has been employed to facilitate observational construction. Using this system, geological data, measurement data, construction data and prediction analysis results are visualized and integrated comprehensively as the construction proceeds. The planned support pattern was, for instance, examined according to the visualized data. Integrating the data of seismic reflection survey and the grouting results into the system, the estimated distribution of faults were revised and the potential area of support instability was determined; this approach has been proven to be effective, completing the shaft construction without any troubles. In addition, the 3D visualization system allows to share clear and common understanding about geological condition and deformation behavior of rock mass among the construction team members. Thus, the system will contribute to more successful implementation of observational construction in understanding rock mass behavior and ensuring optimal structural support and construction safety.
山崎 雅直*; 津坂 仁和*; 大谷 達彦*; 進士 正人*
土木学会論文集,F2(地下空間研究)(インターネット), 71(1), p.1 - 10, 2015/04
本研究は、立坑掘削に伴う坑壁地質観察により得られた割れ目の長さの総和を壁面面積で除した割れ目頻度と、割れ目情報(長さ、方向、開口幅)からステレオロジーの概念を適用して推定した透水係数とは、現地の透水試験結果と高い相関性が得られたことから、坑壁地質観察から地盤の透水係数を簡便に予測する手法を提案する。適用にあたっては高品質の坑壁地質観察記録が重要であり、北海道幌延町において日本原子力研究開発機構が建設中の地下研究施設の立坑掘削時の記録を用い、クラックに関する情報を基に、立坑の3次元クラックテンソルと透水テンソルを推定し、近傍の深層ボーリング孔を用いた透水試験結果と比較した。
青柳 和平; 石井 英一; 近藤 桂二*; 津坂 仁和*; 藤田 朝雄
JAEA-Research 2015-001, 46 Pages, 2015/03
日本原子力研究開発機構は、新第三紀堆積軟岩を対象とした高レベル放射性廃棄物の地層処分技術に関する研究開発を目的として、北海道天塩郡幌延町において幌延深地層研究計画を進めている。本報告書では、幌延深地層研究所に分布する声問層、稚内層岩石のそれぞれを深度方向に細分化した強度物性(粘着力と内部摩擦角)の設定を目的に、三軸圧縮試験結果をとりまとめ、深度依存性(地層境界との深度差)を考慮した強度物性を検討し、地下施設設計時に設定した値と比較して、その妥当性について論じた。さらに、幌延深地層研究計画でこれまで実施した三軸圧縮試験結果の全地点のデータについて取りまとめ、データベース化を行った。深度毎の強度物性を検討した結果、声問層中では、深度とともに粘着力が増大した。稚内層浅部、すなわち遷移層においては、粘着力が急激に増大し、遷移層より深部では、粘着力は3-4MPaに収束していき、深度依存性は見られなかった。内部摩擦角は、声問層中では10-20、稚内層中では20-35に分布している。このことから、声問層と稚内層で強度物性が異なっていることが示された。今回三軸圧縮試験により得られた粘着力と内部摩擦角を、地下施設設計時の値と比較した結果、両者が整合した領域は少なかった。そのため、岩盤の強度物性の詳細な検討のためには、地層境界との深度差に応じて深度区分を設けたうえで、粘着力と内部摩擦角を設定することが重要である。
青柳 和平; 津坂 仁和; 窪田 健二*; 常盤 哲也; 近藤 桂二; 稲垣 大介
土木学会論文集,C(地圏工学)(インターネット), 70(4), p.412 - 423, 2014/12
幌延深地層研究所の250m調査坑道において、弾性波および比抵抗トモグラフィにより、掘削損傷領域の弾性波速度や見掛比抵抗値の経時変化を計測している。弾性波トモグラフィ調査では、坑道掘削に伴い、壁面から約1mの範囲で弾性波速度が低下した。一方、比抵抗トモグラフィ調査では、掘削に伴う顕著な見掛比抵抗値の変化は見られなかった。さらに、坑道壁面の割れ目の観察結果に基づいて、調査領域の三次元割れ目モデルを作成して、坑道掘削後の弾性波トモグラフィ調査で得られる各測線の弾性波速度と割れ目密度の関係を分析したところ、割れ目密度の増大とともに弾性波速度が低下することが明らかとなった。このことから、弾性波トモグラフィ調査と割れ目密度の検討により、掘削損傷領域を適切に評価できることが示された。
津坂 仁和*; 稲垣 大介*; 名合 牧人*; 井尻 裕二*
Proceedings of 8th Asian Rock Mechanics Symposium (ARMS-8) (USB Flash Drive), 9 Pages, 2014/10
This study describes the analysis performed on the West Access Shaft of the Horonobe Underground Research Laboratory, which was expected to intersect a fault at the depth of approximately 320 m. Field observation, and measurement data were used to determine analysis conditions including magnitude and orientation of in-situ stress, boundary conditions, and rock mass properties. The fault was modeled as having a dip angle of 40 degrees and apparent thickness of 5 m (equivalent to the height of the excavated rock wall). The shaft sinking procedure was simulated using three-dimensional excavation analysis. The excavation involved installing concrete lining at every 2 m span. The analysis considered two cases of maximum in situ principal stress orientation: (1) perpendicular to and (2) parallel to the fault plane orientation. The results of the analysis indicate that the maximum excavation-induced stress, developed in a single-span lining concrete, was in the direction perpendicular to the maximum in situ principal stress orientation, unaffected by the fault plane orientation. The influence of the fault plane orientation on the excavation-induced stress state was found to be significant above and below the fault rather than in the fault. Another observation was that the excavation-induced stress magnitude appeared to be greater when the maximum in situ principal stress orientation was parallel to the fault plane orientation.
朝比奈 大輔*; 青柳 和平; 津坂 仁和*; Houseworth, J.*; Birkholzer, J.*
Proceedings of 8th Asian Rock Mechanics Symposium (ARMS-8) (USB Flash Drive), 9 Pages, 2014/10
We present ongoing collaborative work applying a rigid-body-spring network (RBSN), a special type of lattice model, to simulate laboratory experiments conducted in the Horonobe Underground Research Laboratory (URL) in Japan. The Horonobe URL Project, which began in 2001, has developed a URL at a depth of about 350 m in a sedimentary rock called the Koetoi and Wakkanai formation. The basic capabilities of RBSN modeling are demonstrated through two standard laboratory tests: (1) split-cylinder (Brazilian) test; and (2) uniaxial compression test. Bulk material properties (i.e., Young's modulus, the strength parameters such as tensile strength, cohesion, and internal friction angle) estimated by the experiments are directly used for the mechanical parameters of springs. Tensorial representations of stress are obtained within the lattice elements and compared with Mohr-Coulomb failure criteria for fracture simulation. Agreement between the numerical and laboratory test results is good with respect to stress development, tensile/compressive strength, and fracture pattern, under the assumption of homogeneous systems using the RBSN model. The connection of hydraulically active fractures is also addressed for both of the simulation studies.
青柳 和平; 津坂 仁和*; 野原 慎太郎*; 窪田 健二*; 常盤 哲也*; 近藤 桂二*; 稲垣 大介*
Proceedings of 8th Asian Rock Mechanics Symposium (ARMS-8) (USB Flash Drive), 8 Pages, 2014/10
In a construction of a deep underground facility such as repository for high-level radioactive waste (HLW) disposal, significant changes in hydrogeomechanical properties around a gallery are expected. This zone is called an Excavation Damaged Zone (EDZ). For the safety of HLW disposal, it is necessary to investigate extent and hydrogeomechanical characteristics of an EDZ. In this research, the authors conducted in situ surveys such as seismic refraction survey, geological observation around a gallery, borehole television survey, and hydraulic tests in the Horonobe Underground Research Laboratory. From the results of those surveys, the authors concluded that the extent of the area with high-density of fractures and high hydraulic conductivity was estimated to be about 0.2 to 1.2 m into the gallery wall. The authors also compiled the information of the extent of an EDZ and hydrogeomechanical properties inside and outside of an EDZ as a conceptual model. Since the conceptual models provide the basic idea for determining flow and solute transport in an EDZ, the result of this research provides a useful data for a safety assessment of the HLW disposal.
津坂 仁和*; 稲垣 大介*; 丹生屋 純夫*; 城 まゆみ*
Proceedings of 8th Asian Rock Mechanics Symposium (ARMS-8) (USB Flash Drive), 9 Pages, 2014/10
The Japan Atomic Energy Agency (JAEA) has been promoting the Horonobe Underground Research Laboratory Project in Hokkaido since 2001 to enhance the reliability of relevant disposal technologies through investigations of the deep geological environment in sedimentary rocks of Japan. In the project, investigations on mechanical property of in-situ rock mass were conducted in order to evaluate the methodology to build a mechanical dataset of the rock mass based on the results of laboratory tests using rock cores and borehole logs. In this paper, the methodology to be applied for the surface-based investigation around the URL was studied based on the results of in-situ investigation in the galleries at 250 m and 350 m depths.
青柳 和平; 津坂 仁和; 近藤 桂二; 稲垣 大介
Rock Engineering and Rock Mechanics; Structures in and on Rock Masses, p.487 - 492, 2014/05
高レベル放射性廃棄物地層処分において、掘削損傷領域(EDZ)の評価が重要となる。特にEDZ内部では、掘削に伴い新たに割れ目が発生することが予想される。これらの割れ目が、坑道周辺岩盤の透水性の増大に寄与することが考えられる。そこで、EDZ内部の割れ目密度を調べるために、幌延深地層研究所の地下坑道において、弾性波トモグラフィ調査と、坑道掘削断面ごとに地質観察を実施した。両者の結果の比較により、割れ目密度の増大とともに、弾性波速度がほぼ線形に低下する傾向が示された。また、EDZ内部の割れ目の密度は、単純な数値モデルにより推定可能であることも示された。以上から、本研究は、弾性波トモグラフィ調査結果からEDZ内部の割れ目状態を予想できるという点において、地層処分に対して有意義なデータを提供しているといえる。
加藤 信義*; 津坂 仁和; 名合 牧人*; 山上 順民*; 松原 誠*; 重廣 道子*; 相澤 隆生*; 亀村 勝美*
地質と調査, (139), p.17 - 22, 2014/04
近年、地質調査業務において、地質情報の高度利用の観点から、土木構造物の設計や施工に携わる人への情報伝達ツールとして地盤・地質情報の三次元化が採用されてきている。これを踏まえて、本稿では、北海道電力による純揚水式発電所の地下空洞と原子力機構による幌延深地層研究計画の地下施設の2つの大規模地下施設の設計・施工の事例において、設計の最適化、施工の効率化, 高度化、そして、安全の確保のために利用した三次元地質構造・施工情報可視化システムの概要とともに、それぞれの事例における同システムの有用性を記述した。
津坂 仁和; 常盤 哲也
Tunnelling and Underground Space Technology, 38, p.542 - 549, 2013/09
被引用回数:5 パーセンタイル:24.75(Construction & Building Technology)日本における高レベル放射性廃棄物の地層処分において、4万本の廃棄体の処分のためには総延長約300kmの処分坑道が必要となると試算されている。このため、効率的な地層処分事業の観点からは、母岩の掘削性が必要な調査項目となる。本研究では、ブレーカによる坑道掘削の掘削速度に影響を及ぼす岩石の強度特性に加え、岩盤に内在する割れ目の影響を分析した。対象とした坑道は、堆積軟岩に建設中の幌延深地層研究所の250m調査坑道である。坑道掘削において、1掘進ごとに、掘削面の詳細な地質観察による割れ目分布とエコーチップ反発度試験による岩石の強度特性の分布を調査した。結果として、岩盤中の主要な割れ目の方向と並行に掘削した坑道よりも、同方向と直交するように掘削した坑道の方が、掘削速度が約1.3倍大きい結果を得た。また、掘削速度と掘削面に分布する割れ目の頻度との関係においては、岩盤中の主要な割れ目と直交する方向に掘削した坑道において、両者の明瞭な相関関係があった。本研究の結果より、地層処分場の処分坑道のレイアウトの検討において、坑道の掘削性の観点からは、地上からの調査段階の結果として得られる岩盤中の主要な割れ目の方向と坑道軸方向を直交させることが望ましいことが明らかとなった。
青柳 和平; 津坂 仁和; 常盤 哲也; 近藤 桂二; 稲垣 大介; 加藤 春實*
Proceedings of 6th International Symposium on In-situ Rock Stress (RS 2013) (CD-ROM), p.331 - 338, 2013/08
高レベル放射性廃棄物の地層処分において、地圧は支保設計や処分場レイアウトを決定するための重要な情報となる。そのため、本研究では、幌延深地層研究所周辺の広域地圧場を把握し、さらに研究所の坑道で地圧を測定し、掘削による地圧状態の変化を把握することを目的とした。研究所周辺のボーリング孔及び坑道内にて水圧破砕試験及びボアホールテレビューアー検層によるボアホールブレイクアウトの形状の観察が行われた。それらの結果を用いて、幌延深地層研究所周辺の地圧状態を検討した。結果として、ボーリング孔で計測された地圧値は、深度とともに増加する傾向が見られ、最大水平応力の方向は、研究所周辺に存在する断層を境に異なることがわかった。さらに、坑道で計測された地圧値は、ボーリング孔で計測された値よりも小さく、最大水平応力の方向は測定深度により異なる結果となった。このことから、坑道での地圧の測定は、地層処分分野において、掘削前に決定した処分場レイアウトを再検討するために重要であることが示唆された。
津坂 仁和; 稲垣 大介; 名合 牧人*; 青木 智幸*; 重廣 道子*
Proceedings of 6th International Symposium on In-situ Rock Stress (RS 2013) (CD-ROM), p.339 - 346, 2013/08
原子力機構は、幌延深地層研究計画において3本の立坑を建設している。深度250m以深の立坑掘削においては、立坑の掘削径以上の幅を有する断層が複数出現したため、立坑壁面岩盤の崩落が頻繁に生じるとともに、覆工コンクリートにクラックが顕著に生じた。本紙面では、3本の立坑のうち、換気立坑(仕上がり内径4.5m)の深度250mから350mまでの施工について報告する。同施工では、詳細な岩盤壁面の観察とともに、3次元レーザースキャナを用いた岩盤壁面の3次元形状の計測を実施した。これにより、立坑掘削に伴う岩盤壁面の崩落位置やその規模を定量的に分析することができた。さらに、同計測結果に基づいて、岩盤崩落を適切に抑制しつつ、経済的な施工を実施するために、事前に設計した4つの支保構造から最適なものを選定し、立坑の施工を実施し、その手順を崩落量に着目した支保構造選定フローとして整理した。ここで適用した手法は、後続する西立坑(仕上がり内径6.5m)の施工における支保構造の選定に使用されている。
津坂 仁和; 稲垣 大介; 名合 牧人*; 亀村 勝美*; 松原 誠*; 重廣 道子*
Proceedings of ITA-AITES World Tunnel Congress 2013 (WTC 2013)/39th General Assembly, p.2014 - 2021, 2013/05
原子力機構は、幌延深地層研究計画において3本の立坑を深度500mまで建設する予定である。深度250m以深の立坑掘削においては、立坑の掘削径以上の断層が複数出現したため、立坑壁面岩盤の崩落が頻繁に生じるとともに、覆工コンクリートにクラックが顕著に発生した。本研究では、3本の立坑のうち、東立坑(内径6.5m)の施工を対象として、岩盤特性と立坑掘削に伴う支保部材の力学挙動の関係を詳細に調査した。掘削対象となった岩盤特性を調査するために、立坑掘削前に実施した湧水対策工のために掘削したボーリングコアの観察と立坑掘削時の壁面観察を実施した。また、実際の施工においては、岩盤崩落を抑制するために、複数の異なった支保構造を構築し、三次元レーザースキャナとコンバージェンス計測を実施して、立坑掘削に伴う崩落量や変形量・変形モードを比較した。これらの結果として、岩盤特性,支保構造,壁面崩落量及び覆工コンクリートの損傷の程度の関係に基づいて、覆工コンクリートの損傷を抑えることを目的とした支保構造の選定ための手順を提案した。本手順は、後続する西立坑(内径6.5m)の深度250m以深の施工における支保構造の選定に使用される予定である。
津坂 仁和
地下空間利用ガイドブック2013, p.350 - 354, 2013/04
幌延深地層研究計画は、原子力発電で使われた燃料を再処理した際に生じる高レベル放射性廃棄物の地層処分にかかわる技術的信頼性の向上のために、日本の代表的な地下深部環境の1つである堆積岩かつ塩水系地下水を対象として、原子力機構が実施する研究施設計画である。同計画では、「地上からの調査研究段階(第1段階)」、「坑道掘削(地下施設建設)時の調査研究段階(第2段階)」、「地下施設での調査研究段階(第3段階)」の3つの研究段階を20年程度で進める。計画において整備される地下施設は、深度500mの3本の立坑(換気立坑1本(内径4.5m)、アクセス立坑2本(内径6.5m))とそれらを結ぶ4つの深度(深度140m, 250m, 350m及び500m)での調査坑道からなる。地下施設の建設における特徴的な施工及び維持管理として、地下施設工事に伴う湧水の抑制対策、地下水の湧出に伴うメタンガスを主成分とする可燃性ガスの対策、堆積軟岩中での大深度立坑の施工の3つが挙げられる。この地下施設は、研究開発を進めていく施設であるとともに、非専門家を含む幅広い人々に地層処分に関する研究開発の理解を深めていただく場としての意義を有している。
津坂 仁和; 稲垣 大介; 名合 牧人*; 小池 真史*; 松原 誠*; 菅原 健太郎*
第13回岩の力学国内シンポジウム講演論文集(CD-ROM), p.911 - 916, 2013/01
原子力機構は、幌延深地層研究計画において、深度500mまでの3本の立坑(換気立坑1本とアクセス立坑2本)を建設する予定である。これまでに換気立坑の深度250m以深の施工にて、幾つかの深度にて岩盤壁面の崩落が生じ、その崩落個所の直上に構築した覆工コンクリートに開口き裂が生じた。筆者らは、この開口き裂の原因を調査するために、三次元レーザースキャナにより、岩盤壁面の崩落形状を計測するとともに、岩盤崩落を模擬した数値解析により、崩落個所周辺の覆工コンクリートと岩盤内の応力分布の変化を分析した。その結果、立坑壁面の岩盤崩落によって、その近傍に構築した覆工コンクリート内に引張応力が発達することが明らかとなった。また、崩落の奥行深さが100cm以上となると、覆工コンクリートの引張強度を上回る引張応力が生じる結果となった。これらの結果は、後続する2本のアクセス立坑の施工時の施工管理指標として活用している。
青柳 和平; 津坂 仁和; 常盤 哲也; 近藤 桂二; 稲垣 大介
第13回岩の力学国内シンポジウム講演論文集(CD-ROM), p.905 - 910, 2013/01
高レベル放射性廃棄物の地層処分において、坑道掘削により坑道周辺岩盤に力学的,水理学的,地球化学的特性に影響を与えると予想される掘削影響領域(EDZ)の定量的な評価が重要である。幌延深地層研究所の地下250m坑道において、EDZを評価するために、弾性波トモグラフィ調査と、トモグラフィ領域内における岩石コア観察を行った。これらの原位置測定や観察に加えて数値解析も行い、坑道周辺の損傷領域を求めた。弾性波トモグラフィ調査の結果、壁面から約0.6m奥の地点まで顕著な速度低下領域が認められた。また、その領域における岩石コア観察の結果から、壁面から約0.3m奥までの岩石コア中に掘削に伴う割れ目(EDZ割れ目)が多く認められた。さらに、数値解析により、微小き裂が発生している領域は、壁面から0.2mの範囲であることが示された。これらの結果から、速度低下領域とEDZ割れ目の集中する部分はおおむね整合することが示された。
近藤 桂二; 津坂 仁和; 稲垣 大介; 杉田 裕; 加藤 春實*; 丹生屋 純夫*
第13回岩の力学国内シンポジウム講演論文集(CD-ROM), p.583 - 588, 2013/01
日本原子力研究開発機構は、北海道幌延町において新第三紀堆積軟岩を対象に地下研究施設を建設中である。本研究地域には上位から声問層(珪藻質泥岩),稚内層(珪質泥岩)が堆積し、南北走向の背斜軸に近い翼部に位置する。初期地圧の測定は、地下施設建設前に地上からの調査として鉛直深層ボーリング孔を利用した水圧破砕法により行い、その後、地下施設建設時に地上調査結果の妥当性の確認を目的として、これまでに声問層の深度140mで2地点、深度250mで3地点の計5地点にて、水圧破砕法により初期地圧を測定した。その結果、地層境界付近では、鉛直下向きを主応力の一つとし、鉛直応力を土被り圧と仮定した地上調査結果とは整合せず、初期地圧測定の際には地質境界に留意する必要があることが示唆された。