Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Saisu, Motofumi*; Ando, Tadahiko*; Uchiyama, Keizo*; Ueno, Toshihiro*; Takizawa, Koichi*; Endo, Yuji*; Yoshimura, Kazuya; Sanada, Yukihisa
Journal of Radiological Protection, 44(2), p.021518_1 - 021518_16, 2024/06
Times Cited Count:0 Percentile:0.00(Environmental Sciences)Okumura, Takuma*; Azuma, Toshiyuki*; Bennet, D. A.*; Caradonna, P.*; Chiu, I.-H.*; Doriese, W. B.*; Durkin, M. S.*; Fowler, J. W.*; Gard, J. D.*; Hashimoto, Tadashi; et al.
IEEE Transactions on Applied Superconductivity, 31(5), p.2101704_1 - 2101704_4, 2021/08
Times Cited Count:3 Percentile:13.80(Engineering, Electrical & Electronic)A superconducting transition-edge sensor (TES) microcalorimeter is an ideal X-ray detector for experiments at accelerator facilities because of good energy resolution and high efficiency. To study the performance of the TES detector with a high-intensity pulsed charged-particle beam, we measured X-ray spectra with a pulsed muon beam at the Japan Proton Accelerator Research Complex (J-PARC) in Japan. We found substantial temporal shifts of the X-ray energy correlated with the arrival time of the pulsed muon beam, which was reasonably explained by pulse pileup due to the incidence of energetic particles from the initial pulsed beam.
Nishimura, Shoichiro*; Torii, Hiroyuki*; Fukao, Yoshinori*; Ito, Takashi; Iwasaki, Masahiko*; Kanda, Sotaro*; Kawagoe, Kiyotomo*; Kawall, D.*; Kawamura, Naritoshi*; Kurosawa, Noriyuki*; et al.
Physical Review A, 104(2), p.L020801_1 - L020801_6, 2021/08
Times Cited Count:19 Percentile:83.44(Optics)Okumura, Takuma*; Azuma, Toshiyuki*; Bennet, D. A.*; Caradonna, P.*; Chiu, I. H.*; Doriese, W. B.*; Durkin, M. S.*; Fowler, J. W.*; Gard, J. D.*; Hashimoto, Tadashi; et al.
Physical Review Letters, 127(5), p.053001_1 - 053001_7, 2021/07
Times Cited Count:18 Percentile:76.09(Physics, Multidisciplinary)We observed electronic X rays emitted from muonic iron atoms using a superconducting transition-edge-type sensor microcalorimeter. The energy resolution of 5.2 eV in FWHM allowed us to observe the asymmetric broad profile of the electronic characteristic
and
X rays together with the hypersatellite
X rays around 6 keV. This signature reflects the time-dependent screening of the nuclear charge by the negative muon and the
-shell electrons, accompanied by electron side-feeding. Assisted by a simulation, this data clearly reveals the electronic
- and
-shell hole production and their temporal evolution during the muon cascade process.
Abe, Mitsushi*; Bae, S.*; Beer, G.*; Bunce, G.*; Choi, H.*; Choi, S.*; Chung, M.*; da Silva, W.*; Eidelman, S.*; Finger, M.*; et al.
Progress of Theoretical and Experimental Physics (Internet), 2019(5), p.053C02_1 - 053C02_22, 2019/05
Times Cited Count:161 Percentile:99.30(Physics, Multidisciplinary)This paper introduces a new approach to measure the muon magnetic moment anomaly and the muon electric dipole moment (EDM)
at the J-PARC muon facility. The goal of our experiment is to measure
and
using an independent method with a factor of 10 lower muon momentum, and a factor of 20 smaller diameter storage-ring solenoid compared with previous and ongoing muon g-2 experiments with unprecedented quality of the storage magnetic field. Additional significant differences from the present experimental method include a factor of 1000 smaller transverse emittance of the muon beam (reaccelerated thermal muon beam), its efficient vertical injection into the solenoid, and tracking each decay positron from muon decay to obtain its momentum vector. The precision goal for
is a statistical uncertainty of 450 parts per billion (ppb), similar to the present experimental uncertainty, and a systematic uncertainty less than 70 ppb. The goal for EDM is a sensitivity of
e
cm.
Strasser, P.*; Abe, Mitsushi*; Aoki, Masaharu*; Choi, S.*; Fukao, Yoshinori*; Higashi, Yoshitaka*; Higuchi, Takashi*; Iinuma, Hiromi*; Ikedo, Yutaka*; Ishida, Katsuhiko*; et al.
EPJ Web of Conferences, 198, p.00003_1 - 00003_8, 2019/01
Times Cited Count:16 Percentile:98.61(Quantum Science & Technology)Ueno, Yasuhiro*; Aoki, Masaharu*; Fukao, Yoshinori*; Higashi, Yoshitaka*; Higuchi, Takashi*; Iinuma, Hiromi*; Ikedo, Yutaka*; Ishida, Katsuhiko*; Ito, Takashi; Iwasaki, Masahiko*; et al.
Hyperfine Interactions, 238(1), p.14_1 - 14_6, 2017/11
Times Cited Count:4 Percentile:87.91(Physics, Atomic, Molecular & Chemical)Strasser, P.*; Aoki, Masaharu*; Fukao, Yoshinori*; Higashi, Yoshitaka*; Higuchi, Takashi*; Iinuma, Hiromi*; Ikedo, Yutaka*; Ishida, Katsuhiko*; Ito, Takashi; Iwasaki, Masahiko*; et al.
Hyperfine Interactions, 237(1), p.124_1 - 124_9, 2016/12
Times Cited Count:7 Percentile:89.35(Physics, Atomic, Molecular & Chemical)Kondo, Yasuhiro; Morishita, Takatoshi; Yamazaki, Saishun; Hori, Toshihiko; Sawabe, Yuki; Chishiro, Etsuji; Fukuda, Shimpei; Hasegawa, Kazuo; Hirano, Koichiro; Kikuzawa, Nobuhiro; et al.
Physical Review Special Topics; Accelerators and Beams, 17(12), p.120101_1 - 120101_8, 2014/12
Times Cited Count:6 Percentile:41.13(Physics, Nuclear)We performed a beam test of a new radio frequency quadrupole linac (RFQ III) for the beam current upgrade of the Japan Proton Accelerator Research Complex. First, the conditioning of RFQ III was conducted, and after 20 h of conditioning, RFQ III became very stable with a nominal peak power and duty factor of 400 kW and 1.5%, respectively. An off-line beam test was subsequently conducted before installation in the accelerator tunnel. The transmission, transverse emittance, and energy spread of the 50-mA negative hydrogen beam from RFQ III were measured and compared with simulation results. The experiment and simulation results showed good agreement; therefore, we conclude that the performance of RFQ III conforms to its design.
Oguri, Hidetomo; Hasegawa, Kazuo; Ito, Takashi; Chishiro, Etsuji; Hirano, Koichiro; Morishita, Takatoshi; Shinozaki, Shinichi; Ao, Hiroyuki; Okoshi, Kiyonori; Kondo, Yasuhiro; et al.
Proceedings of 11th Annual Meeting of Particle Accelerator Society of Japan (Internet), p.389 - 393, 2014/10
no abstracts in English
Moriyama, Setsuko; Ueno, Kenichi; Koizumi, Koichi
Purazuma, Kaku Yugo Gakkai-Shi, 89(3), P. 184, 2013/03
no abstracts in English
Ueno, Kenichi; Koizumi, Koichi; Moriyama, Setsuko
Purazuma, Kaku Yugo Gakkai-Shi, 89(1), P. 57, 2013/01
no abstracts in English
Moriyama, Setsuko; Ueno, Kenichi; Koizumi, Koichi
Purazuma, Kaku Yugo Gakkai-Shi, 88(11), P. 685, 2012/11
no abstracts in English
Shimada, Kenji*; Ueno, Hideki*; Neyens, G.*; Asahi, Koichiro*; Balabanski, D. L.*; Daugas, J. M.*; Depuydt, M.*; De Rydt, M.*; Gaudefroy, L.*; Grvy, S.*; et al.
Physics Letters B, 714(2-5), p.246 - 250, 2012/08
Times Cited Count:7 Percentile:39.81(Astronomy & Astrophysics)no abstracts in English
De Rydt, M.*; Neyens, G.*; Asahi, Koichiro*; Balabanski, D. L.*; Daugas, J. M.*; Depuydt, M.*; Gaudefroy, L.*; Grvy, S.*; Hasama, Yuka*; Ichikawa, Yuichi*; et al.
Physics Letters B, 678(4), p.344 - 349, 2009/07
Times Cited Count:17 Percentile:68.84(Astronomy & Astrophysics)no abstracts in English
Ao, Hiroyuki; Hirano, Koichiro; Morishita, Takatoshi; Asano, Hiroyuki; Naito, Fujio*; Ueno, Akira; Ikegami, Masanori*; Hasegawa, Kazuo; Yamazaki, Yoshishige; Paramonov, V.*
Proceedings of 5th Annual Meeting of Particle Accelerator Society of Japan and 33rd Linear Accelerator Meeting in Japan (CD-ROM), p.494 - 496, 2008/00
The J-PARC ACS cavity consists of many cell parts. For the mass production, the ACS requires about 1300 cell parts, so that it is important to reduce the machining time. In the previous ACS model, it took about three hours per one coupling slot. We, therefore, optimized the slot design, the tolerance, and the machining process. As a result, the machining time reduced to forty-five minutes per one slot. The four test cells were fabricated to measure the frequencies and Q-values, and these results were compared with the electromagnetic analysis with the Microwave Studio. Between the analysis and the measurement, the differences are 11.5 MHz and 4
5 MHz, respectively, for the accelerating mode, and for the coupling mode.
Miyake, Yasuhiro*; Nishiyama, Kusuo*; Kawamura, Naritoshi*; Makimura, Shunsuke*; Strasser, P.*; Shimomura, Koichiro*; Beveridge, J. L.*; Kadono, Ryosuke*; Fukuchi, Koichi*; Sato, Nobuhiko*; et al.
Physica B; Condensed Matter, 374-375, p.484 - 487, 2006/03
Times Cited Count:6 Percentile:31.27(Physics, Condensed Matter)The construction of the Materials and Life Science building was started in the beginning of the fiscal year of 2004. After commissioning of the accelerator and beam transport sections in 2008, muon beams will be available for users in 2009. In this letter, the latest construction status of the J-PARC Muon Science Facility is reported.
Ouchi, Nobuo; Akaoka, Nobuo*; Asano, Hiroyuki*; Chishiro, Etsuji; Namekawa, Yuya*; Suzuki, Hiroyuki*; Ueno, Tomoaki*; Noguchi, Shuichi*; Kako, Eiji*; Ouchi, Norihito*; et al.
Proceedings of 4th International Workshop on the Utilisation and Reliability of High Power Proton Accelerators, p.175 - 183, 2005/11
no abstracts in English
Takemiya, Hiroshi*; Imamura, Toshiyuki; Koide, Hiroshi; Higuchi, Kenji; Tsujita, Yuichi; Yamagishi, Nobuhiro*; Matsuda, Katsuyuki*; Ueno, Koichi*; Hasegawa, Yukihiro*; Kimura, Toshiya; et al.
Proceedings of 4th International Conference on Supercomputing in Nuclear Applications (SNA 2000) (CD-ROM), 16 Pages, 2000/09
no abstracts in English
Ueno, Koichi*; Ota, Hirofumi*; Takemiya, Hiroshi*; Imamura, Toshiyuki; Koide, Hiroshi; Matsuda, Katsuyuki*; Higuchi, Kenji; Hirayama, Toshio
JAERI-Data/Code 2000-023, p.287 - 0, 2000/03
no abstracts in English