Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Maurer, C.*; Galmarini, S.*; Solazzo, E.*; Kumierczyk-Michulec, J.*; Bar, J.*; Kalinowski, M.*; Schoeppner, M.*; Bourgouin, P.*; Crawford, A.*; Stein, A.*; et al.
Journal of Environmental Radioactivity, 255, p.106968_1 - 106968_27, 2022/12
Times Cited Count:2 Percentile:14.8(Environmental Sciences)After performing multi-model exercises in 2015 and 2016, a comprehensive Xe-133 atmospheric transport modeling challenge was organized in 2019. For evaluation measured samples for the same time frame were gathered from four International Monitoring System stations located in Europe and North America with overall considerable influence of IRE and/or CNL emissions. As a lesion learnt from the 2nd ATM-Challenge participants were prompted to work with controlled and harmonized model set ups to make runs more comparable, but also to increase diversity. Effects of transport errors, not properly characterized remaining emitters and long IMS sampling times (12 to 24 hours) undoubtedly interfere with the effect of high-quality IRE and CNL stack data. An ensemble based on a few arbitrary submissions is good enough to forecast the Xe-133 background at the stations investigated. The effective ensemble size is below five.
Jacquinot, J.*; Albajar, F.*; Beaumont, B.*; Becoulet, A.*; Bonicelli, T.*; Bora, D.*; Campbell, D.*; Chakraborty, A.*; Darbos, C.*; Decamps, H.*; et al.
Fusion Engineering and Design, 84(2-6), p.125 - 130, 2009/06
Times Cited Count:24 Percentile:82.29(Nuclear Science & Technology)The electron cyclotron (EC), ion cyclotron (IC), neutral beam (NB) and, lower hybrid (LH) systems for ITER have been reviewed in 2007/2008 in light of progress of physics and technology. Although the overall specifications are unchanged, notable changes have been approved. Firstly, the full 73MW should be commissioned and available on a routine basis before the D/T phase. Secondly, the possibility to operate the NB at full power during the hydrogen phase requiring new shine through protection; IC with 2 antennas with increased robustness; 2 MW transmission systems to provide an easier upgrading of the EC power; the addition of a building dedicated to the RF power sources and to a testing facility for acceptance of diagnostics and heating port plugs. Thirdly, the need of a plan for developing, in time for the active phase, a CD system such as LH suitable for very long pulse operation of ITER was recognized.