Refine your search:     
Report No.
 - 
Search Results: Records 1-4 displayed on this page of 4
  • 1

Presentation/Publication Type

Initialising ...

Refine

Journal/Book Title

Initialising ...

Meeting title

Initialising ...

First Author

Initialising ...

Keyword

Initialising ...

Language

Initialising ...

Publication Year

Initialising ...

Held year of conference

Initialising ...

Save select records

Journal Articles

Comprehensive cost estimation method for decommissioning

Kudo, Kenji; Kawatsuma, Shinji; Rindo, Hiroshi; Watabe, Kozo; Tomii, Hiroyuki; Shiraishi, Kunio; Yagi, Naoto; Fukushima, Tadashi; Zaitsu, Tomohisa

Proceedings of 14th International Conference on Nuclear Engineering (ICONE-14) (CD-ROM), 8 Pages, 2006/07

Japan Atomic Energy Research Institute (JAERI) played a leading role in basic research in the field of atomic energy research and development, while Japan Nuclear Cycle Development Institute (JNC) did a major role in FBR cycle development and high level waste disposal. Following the Government's decision in December 2001, JAERI and JNC was merged as of October 1st, 2005. The new organization, Japan Atomic Energy Agency (JAEA), is an institute for comprehensive R&D for atomic energy, and is the largest research and development institute among Governmental R&D organizations. Its missions are basic research on atomic energy, R&D for nuclear fuel cycle, decommissioning of own facilities and disposal of waste, contribution to safety and non-proliferation, etc. The JAEA owns a number of nuclear facilities: research reactors such as JRR-2 and Joyo, prototype reactors such as ATR "Fugen" and FBR "Monju", fuel cycle plants such as Uranium Enrichment Demonstration Plant at Ningyo-Toge, MOX fuel plants at Tokai, Reprocessing Plant at Tokai, and Hot Laboratories such as JRTF and FMF. As a part of preparation of the mergence, JNC and JAERI have jointly developed a comprehensive cost estimation method for decommissioning, based on decommissioning and refurbishing experiences of JAERI and JNC. This method involves more estimation parameters from typical decommissioning activities than before, so as to make it more reliable. JAERI and JNC have estimated the total cost for decommissioning by using this method, and concluded that the cost would be 600 billion yen (approx. 5 billion USD).

JAEA Reports

The Technological study on the decommissioning of nuclear facility, etc. in the Tokai Research Establishment

Tomii, Hiroyuki; Matsuo, Kiyoshi*; Shiraishi, Kunio; Kato, Rokuro; Watabe, Kozo; Higashiyama, Yutaka; Nagane, Satoru*; Hanawa, Yukimitsu*

JAERI-Tech 2005-017, 65 Pages, 2005/03

JAERI-Tech-2005-017.pdf:3.79MB

no abstracts in English

Journal Articles

Cost estimation method for decommissioning of nuclear facilities

Tomii, Hiroyuki; Matsuo, Kiyoshi*; Shiraishi, Kunio; Watabe, Kozo; Saiki, Hideo*; Kawatsuma, Shinji*; Rindo, Hiroshi*; Zaitsu, Tomohisa*

Dekomisshoningu Giho, (31), p.11 - 20, 2005/03

no abstracts in English

Journal Articles

Cost estimation method for decommissioning of nuclear facilities

Tomii, Hiroyuki*; Matsuo, Kiyoshi*; Shiraishi, Kunio*; Watabe, Kozo*; Saiki, Hideo; Kawatsuma, Shinji; Rindo, Hiroshi; Zaitsu, Tomohisa

Dekomisshoningu Giho, (31), p.11 - 20, 2005/03

Japanese Government decided that Japan Atomic Energy Research Institute ( JAERI ) and Japan Nuclear Cycle Development Institute ( JNC ) shall be consolidated to a New rganization as of October 2005, which organization would be an Institute for comprehensive research and development for atomic.Through the preparation for unification, JAERI and JNC have been developing the Decommissioning program for own facilities, estimating decommissioning cost and the amount of waste from the decommissioning, and developing Management Program. Planning the Decommissioning program, it is important to estimate decommissioning cost effectively, because JAERI and JNC retain about 230 nuclear facilities which are reactors, fuel cycle facilities and research facilities. Then the decommissioning cost estimation method has developed based on several dismantling and replacement experiences. This method has adopted more estimation fomulae for decommissioning various works than ever, so as to be more reliable. And decommissioning cost for the facilities has estimated under the common condition. This method would be improved, reflecting future nuclear facilities dismantling and replacement events.This paper shows the cost estimation method for nuclear facilities and cost evaluation result for about 230 facilities of both JAERI and JNC.

4 (Records 1-4 displayed on this page)
  • 1