Kato, Yuko; Yabuki, Kentaro*; Okawachi, Yasushi
JAEA-Technology 2013-018, 118 Pages, 2013/07
The prototype fast breeder reactor MONJU resumed the system startup test (SST) on May 6th 2010 after fourteen years and five months shutdown since the sodium leakage of the secondary heat transport system in December 1995 and reached criticality on May 8th. Core confirmation test (CCT) is the first step of SST which consists of three steps, and finished on July 22nd after 78 days test. Control rod reactivity worth measurements were carried out in order to calibrate the reactivity worth of control rods and back-up rods. In addition, we also aimed at a basic data acquisition for the control rod reactivity worth calibration.
Jo, Takahisa; Goto, Takehiro; Yabuki, Kentaro; Ikegami, Kazunori; Miyagawa, Takayuki; Mori, Tetsuya; Kubo, Atsuhiko; Kitano, Akihiro; Nakagawa, Hiroki; Kawamura, Yoshiaki; et al.
JAEA-Technology 2010-052, 84 Pages, 2011/03
The prototype fast breeder reactor MONJU resumed the System Startup Test (SST) on May 6th 2010 after five months and fourteen years shutdown since the sodium leakage of the secondary heat transport system on December 1995. Core Confirmation Test (CCT) is the first step of SST, which consists of three steps. CCT was finished on July 22nd after 78 days tests. CCT is composed 20 test items including control rods' worth evaluation, radiation dose measurement etc..
Morohashi, Yuko; Mori, Tetsuya; Maruyama, Shuhei; Kasahara, Hideyuki; Yabuki, Kentaro; Okawachi, Yasushi
no journal, ,
no abstracts in English
Yabuki, Kentaro; Kitano, Akihiro; Fukushima, Masahiro; Miyagawa, Takayuki; Okawachi, Yasushi
no journal, ,
no abstracts in English
Mori, Tetsuya; Takano, Kazuya; Kitano, Akihiro; Morohashi, Yuko; Kato, Yuko; Yabuki, Kentaro; Miyagawa, Takayuki; Okawachi, Yasushi; Hazama, Taira
no journal, ,
Monju restarted safely on May 6, 2010 after 14 years and 5 months suspension. Core Confirmation Test was performed until July 22. The core fuel contains Am-241 because Pu-241 (half-life 14 years) decayed during 14.4 years suspension. Therefore, physics data of the core containing Am-241 are obtained. The mainly test items are criticality, control rod worth and isothermal temperature coefficient. In the criticality, the measured CR position at the criticality was confirmed to be within the predicted CR position range. Criticality was predicted in good accuracy. In the control rod worth measurement, CR worth of CCR1 was measured by the period method. CR worth of other CR was measured by the balancing method. In the isothermal temperature coefficient measurement, the measured value was a little bit smaller than that of the previous test due to the accumulation of Am-241, the decay of Pu-241, and other composition change by refuelling.
Yabuki, Kentaro; Kitano, Akihiro; Fukushima, Masahiro; Miyagawa, Takayuki; Okawachi, Yasushi
no journal, ,
no abstracts in English
Minamide, Masashi*; Hagihara, Takeshi*; Nago, Makito*; Ogawa, Hiroyuki*; Uyama, Mikinori*; Kisu, Yoshio*; Morimoto, Tsutomu*; Yabuki, Yoshio*; Kudo, Hajime; Inagaki, Daisuke; et al.
no journal, ,
no abstracts in English
Mori, Tetsuya; Morohashi, Yuko; Maruyama, Shuhei; Kasahara, Hideyuki; Yabuki, Kentaro; Okawachi, Yasushi
no journal, ,
no abstracts in English